
Table of contents
1MB..5/6 shaft height 71 ... 355
Operating Instructions, 10/2021, A5E41926185A 5
5.5 Installing the machine ....................................................................................................... 59
5.5.1 Preconditions for smooth, vibration-free operation............................................................. 59
5.5.2 Aligning the machine to the driven machine and mounting................................................ 60
5.5.2.1 Horizontal types of construction with mounting feet .......................................................... 60
5.5.2.2 Horizontal types of construction with flange ...................................................................... 60
5.5.2.3 Vertical types of construction with flange........................................................................... 61
5.5.2.4 Type of construction without flange................................................................................... 62
5.5.3 Removing the rotor shipping brace..................................................................................... 62
5.5.4 Recommended alignment accuracy .................................................................................... 62
5.5.5 Mounting the drive output elements.................................................................................. 63
5.5.5.1 Pulling on and pulling off drive output elements ................................................................ 64
5.5.5.2 Diagram showing pulling on and pulling off drive output elements..................................... 64
6 Electrical connection ........................................................................................................................... 67
6.1 Connecting the machine .................................................................................................... 68
6.1.1 Selecting cables................................................................................................................. 68
6.1.2 Terminal box ..................................................................................................................... 68
6.1.2.1 Terminal designation ......................................................................................................... 69
6.1.2.2 Circuit diagram inside the terminal box cover..................................................................... 69
6.1.2.3 Direction of rotation .......................................................................................................... 69
6.1.2.4 Additional bores in the terminal box................................................................................... 70
6.1.2.5 Cable entry........................................................................................................................ 70
6.1.2.6 Thread sizes in terminal box............................................................................................... 71
6.1.3 Minimum air clearances ..................................................................................................... 71
6.1.4 Internal equipotential bonding........................................................................................... 72
6.2 Tightening torques ............................................................................................................ 72
6.2.1 Cable entries, sealing plugs and thread adapters ................................................................ 72
6.3 Connecting the grounding conductor................................................................................. 72
6.3.1 Grounding connection type................................................................................................ 73
6.4 Temperature sensor/anti-condensation heating connection................................................ 75
6.4.1 Connecting optional integrated devices and equipment ..................................................... 75
6.4.2 Auxiliary circuit connection ................................................................................................ 75
6.5 Conductor connection ....................................................................................................... 75
6.5.1 Connecting conductors ...................................................................................................... 76
6.5.2 Cable ends with wire end sleeves....................................................................................... 79
6.5.3 Connecting aluminum conductors...................................................................................... 79
6.6 Connecting converters ....................................................................................................... 80
6.7 Final checks....................................................................................................................... 81
7 Start-up ................................................................................................................................................ 83
7.1 Measures before commissioning ........................................................................................ 83
7.1.1 Insulation resistance and polarization index ....................................................................... 85
7.1.2 Testing the cooling of the machine .................................................................................... 85
7.1.3 Commissioning the separately driven fan ........................................................................... 86
7.1.4 Setpoint values for monitoring the bearing temperature .................................................... 87
7.1.5 Further documents ............................................................................................................ 87
7.2 Switching on ..................................................................................................................... 87
7.2.1 Test run............................................................................................................................. 89