manuals.online logo
Brands
  1. Home
  2. •
  3. Brands
  4. •
  5. SolaX Power
  6. •
  7. Solar Panel
  8. •
  9. SolaX Power X3-Matebox basic User manual

SolaX Power X3-Matebox basic User manual

REV.REV.DescriptionDescription
描述材料料号单位页次设计审核核准浙江艾罗网络能源技术股份有限公司
双胶纸
技术要求:1.材质为80g双胶纸,所有页彩色打印,正反打印2.未注尺寸公差按 +- 1.5mm3.图面、字体印刷清晰、无毛边、不起边、油墨不脱落4.字体颜色为PANTONE Black C,无边框,底色为白色5.符合RoHS要求
描述料号单位页次浙江艾罗网络能源技术股份有限公司SolaX Power Network Technology (Zhe jiang) Co.,Ltd.
0.0首次发行
I
586.0 mm
420.0 mm正反打印,需折叠出货
熊小翠 2022/10/08
施鑫淼 2022/10/08
施鑫淼 2022/10/08
快速安装指南 X3-Matebox basic V1.4 英文版 SOLAX 01 快速安装指南 X3-Matebox basic V1.4 英文版 SOLAX 01
熊小翠 2022/08/150.03201020492013201020492010.1修改CT的符号,附件包标配Wifi熊小翠 2022/10/08
Diagram A: N line and PE line separate wiring, D series inverters;(For most countries)Diagram B: N line and PE line together, D series inverters;( Applicable to Australia)X3-Matebox basicQuick Installation Guide1. Introduction2. OverviewB A LoadObjectNameD C Grid(INV) GridF E BATEPS(Off-grid) (INV)BAT(INV)DescriptionLoad connection port Grid output portof the inverterBattery connection port(tobatteryBMS)Battery connection port of the inverterGridconnection port (to local grid)EPS(Off-grid) output portof the inverterABCDEF533cm204cm
437cm
3.1 Check Packing List3.2 Tools
Φ 10 and Φ 8 Drill
Marker Pen
Hexagon keysPhilips ScrewdriverDiagonal Plier
Crimping Plier
Inner hexagonal wrench
Monkey Wrench
Rubber hammer
Crimping Tool3. PreparationThe following tools need to be prepared before installation:4. MountingStep 1: Connect all brackets Then the Bracket C is fixed on theBAT bracket and the screws are locked ; Then set the bracket B on the bracket A and fix it with screws; Fix the inverter bracket on the bracket B;Inverter bracketMonkey WrenchTorque: 1.5±0.2N·mMonkey WrenchTorque: 1.5±0.2N·mMonkey WrenchTorque: 1.5±0.2N·m
Note: The position of the T-BAT-SYS-HV-(3.0) battery base mounting screws are two positions on the inner side, refer to the following figure:
Bracket ABracket BBracket CBAT bracketStep 2: Connect the BAT bracket and T-BAT-SYS-3.0 battery and push the whole structure to the wallMake sure all brackets (bracket A, bracket B, bracket C, inverter bracket and BAT bracket) are well and rmly installed.The inverterStep 5. Install the X3-Matebox on the wall and lock the screws.
The installation of X3-Matebox basic needs three brackets. A is used to hang the X3-Bracket Matebox,B is connected to both inverter bracket and Bracket A to fix the bracket position of Bracket the inverter, and C is connected to both Bracket A and BAT bracket to fix the bracket position Bracket of T-BAT-SYS-HV-(3.0).The bracket can be installed in two ways:1) With T-BAT-SYS-HV-(3.0) battery, the installation method is as follows: ( )2) With other batteries, the installation method is as follows: ( )Note: When brackets are mounted, a spirit level is used to keep inverter bracket and Bracket A parallel to the ground.Bracket A should be installed at a distance of 400mm (at least) from the ground if other batteries are to be installed.2)Bracket ABracket BInverter bracket400.00mmInverter bracketBracket ABracket BBAT bracket1)Bracket CSpirit levelPhilips screwdriverTorque: 1.5±0.2N·mPhilips screwdriverTorque: 1.5±0.2N·mMonkey WrenchTorque: 1.5±0.2N·mCheck the accessories according to the following list and ensure that nothing in the package is damaged before installation.Connect inverter bracket, Bracket B, Bracket A, Bracket C and BAT bracket all together with ange nuts.Set the Bracket C on the Bracket A; Note: The position of the T-BAT-SYS-HV-(3.0) battery base mounting screws are two positions on the inner side, refer to the following gure;Step 3: Fix the position, drill holes and install the whole structure on the walla) b) Φ10 drillc) Rubber hammerd)Step 4: Install the inverterc) Use the inner hexagonal wrench to tighten the inner hexagonal screw on the right side of the inverter.b)c )The inverterT-BAT-SYS-3.0 batteryd )Step 5: Install X3- Matebox basic b) Put the matebox on the bracket. And make sure the box is well xed on the bracket by screwing all nuts tightly. b)a)Φ 8 drill
65.00 mm80.00 mm
(Torque :2.5±0.2N·m)nut, Gasket, Matebox Load Grid
(Expansion bolts,Gaskets, Self-tapping bolts) *26 mm² Europeanterminals *19
CT *1
Bracket A *1Bracket B *1Bracket C *1Flange nuts (M4*4, M5*1)6 mm² OTterminals *2Earth connectors (450 mm *1, 250 mm*1) N-terminal adjacentbridge *1(for AU market)X3-Matebox basic *1
Documents6 mm² BAT terminals *2X3-MateboxNBATBatteryN-BAR for loadsN-BAR for EPS(Off-grid) loadsEPS(Off-grid) loadsLoadsInverterPV 1PV 2E-BARGridGridEPS(Off-grid)Main Breaker/RCD
BreakerBreaker
CTCT-RCT-SCT-TDistribution BoxNBATBatteryN-BAR for loadsN-BAR for EPS(Off-grid) loadsEPS(Off-grid) loadsLoadsInverterPV 1PV 2E-BARGridGridEPS(Off-grid)Main Breaker
BreakerBreaker
CTCT-RX3-MateboxE-BARNCT-SCT-TRCD
M5 inner hexagon bolts *1
Keys * 4Wi Dongle * 1a) Before install the inverter, remove the "DONGLE" waterproof plug(for the installtion of communication accessories); Insert wi into DONGLE port and lock DONGLE port and lock the four screw on the wi to x its position. b) Hang the buckle on the inverter to the corresponding position of the backplane.X3-Matebox basic is a critical part in one energy storage system, which integrates the DC breaker/AC breaker/switch unit/CT and so on, it can easily be installed compare to the traditional separate system, this unit can be used with Hybrid and Fit series inverters.There are 2 wiring diagrams for your system connection reference, please follow your local policy to chose which one is suitable for your side.a) Cut off all strips of the box except the strips on the back of the box before installing the box. Open the unlocked buckles of X3-Matebox basic, open the upper cover and remove the protective cover; (open the button by hand, open the cover and slide upwards.) d ) The bracket is aligned with the screw uses the inner hexagonal wrench to screw the tapping screw until the expansion bolt "bang" is heard.c) Insert expansion bolt into the nine hole, use rubber hammer to knock the expansion screw bolt into the wall. b) Move away the structure and drill holes at marked spots at different depths of 65 mm and 80 mm. a) With the position of the brackets as a template in step 2, use a spirit level to mark the nine holes needed on the wall with a marker pen. External hexagonalwrench Hexagon keys(Torque: 1.2±0.1N· m)
There is an antenna in the box of monitoring accessories.a)Install the antenna on bracket A and tighten it by hand;b)Then connect the antenna cable to the end of the WiFi Dongle.5. Monitor the antenna connections of accessories6. Wiring Connectionb) Grid (PE) strip the grounding cable, remove the 13 mm insulation layer from the end of the wire. Insert the stripped cable into the R type terminal, and then clamp it.3) Pass the Load line through the Load port of the X3-Matebox basic, then find the Load (R/S/T/N) ports in the X3-Matebox basic, insert each line accordingly, and use the screwdriver to lock the screws.3201020492016.3 Ground cable connections6.5N lines short circuit (applicable in Australia)Grid(L1/L2/L3/N/PE)Load(L1/L2/L3/N)
L=12mm
L
L
L=12mm
Grid(L1/L2/L3/N/PE)Load(L1/L2/L3/N)
6mm²
6mm²
a)b)According to local regulations, the continuity of the neutral cable of EPS load and that of the grid is not interrupted when the inverter disconnects from the grid. (for wiring Australia and New Zealand regulation AS/NZs_3000:2012)Firstly, nd N-ternal adjacent Bridge in the accessory package;Forcibly insert N-terminal adjacent bridge into the N-terminal hole and jam it. Gently twist to well connect it.6.6 Finally, use a Philips screwdriver to install the baffle back, install the upper cover and lock the buckle with a key.6.4 Battery communication cable connectiona) Lock the Grid (INV) PE wire with a hexagonal key; b) Insert the L1/L2/L3 EPS (Off-grid)(INV) into the R/S/T port of EPS (Off-grid) (INV) in X3-Matebox basic and the N EPS (Off-grid)(INV) directly into the hole and ensure that cables are well and tightly installed;b) Find the Grid (INV) (R/S/T) port in the X3-Matebox basic, connect the corresponding wire harness, and lock the screw with a screwdriver.c) Connect the Grid (INV) L1/L2/L3/N and EPS(Off-grid) (INV) L1/L2/L3/N/PE ports of the inverter to the X3-Matebox basic port. The connection method is as follows:6.2 X3-Matebox side connectionC
10 mmL=13 mm
Leaking cable
Crimping ToolGrid(PE)Diagonal plier5) Pass the battery cable through the BAT port of the X3-Matebox basic, find the BAT+ and BAT- ports in the X3-Matebox basic, insert each cable accordingly, and use the screwdriver to lock the screws.
NGrid฀INV฀RST
NRSTNNN
R⑰⑱⑲R⑰S⑱T⑲Grid(INV)
Hexagon keyTorque: 1.5±0.2N·m
Off-grid(INV)
Grid(INV)
EPS(INV)c)a)b)Philips screwdriverTorque: 1.5±0.2N·m
R⑰⑱⑲N⑨
R⑩
S⑪LoadT⑫
Grid฀INV฀NRST
Philips screwdriverTorque: 1.5±0.2N·m
BAT(+) BAT(-)
BAT(+) BAT(-)
BAT(+) BAT(-)
N-terminal adjacentbridge *14) Pass the Grid line through the Grid port of the X3-MateBox basic, and then find Grid (N/R/S/T) port inside the X3-Matebox basic. Force the cable harness directly into the hole to jam, gently twist not to loosen.Grid (PE) is locked with a Hexagon key.Hexagon keyTorque: 1.5±0.2N·m
N⑬ R⑭ S⑮T⑯ N⑬ R⑭ S⑮T⑯
Grid
Philips screwdriverTorque: 1.5±0.2N·mRJ 45 terminal Hexagon keyTorque: 1.5±0.2N·mHexagon keyTorque: 1.5±0.2N·m6.1 Inverter side connectionAccording to the BAT(INV)+/BAT(INV)- line symbol on X3-Matebox basic harness, the corresponding ports of BAT+/BAT- of the inverter are well inserted.There are three parts that need to be grounded, one is between the inverter and X3-Matebox basic, the connection between the X3-Matebox basic and the battery and the connection of the upper cover and the X3-Matebox basic.- When the distance between the X3-Matebox basic and the battery is< 1m, you can use the BMS communication cable in the accessory bag.- When the distance between the X3-Matebox basic and the battery is> 1 m, you need to prepare the regular network cable and nd the RJ45 terminal of the accessory package to make the cable.The BMS port connection between the inverter and the battery (for the specic connection method, please refer to the inverter and battery quick installation guide)2) Grid (L1/L2/L3/N/PE) /Load (L1/L2/L3/N) side connection a) Prepare ordinary 6 mm² Grid (L1/L2/L3/N/PE) /6 mm² Load (L1/L2/L3/N) cable, remove 12 mm insulation layer from the end of the cable. And insert the European-style terminals respectively. The stripped terminals must be inserted into the European-style terminals and pressed down with the crimping pliers.

Popular Solar Panel manuals by other brands

Hyundai HIS-M210RF installation manual

Hyundai

Hyundai HIS-M210RF installation manual

Solar Roofs SkyLine 200152C80EX installation manual

Solar Roofs

Solar Roofs SkyLine 200152C80EX installation manual

Gallagher G49521 Mounting instructions

Gallagher

Gallagher G49521 Mounting instructions

Flashfish SP18V100W user manual

Flashfish

Flashfish SP18V100W user manual

Panasonic HIT VBHN330SA17 General installation manual

Panasonic

Panasonic HIT VBHN330SA17 General installation manual

Simplicity 1691258 Operator's manual

Simplicity

Simplicity 1691258 Operator's manual

Tsun TSOL-ESK400-BA Quick installation guide

Tsun

Tsun TSOL-ESK400-BA Quick installation guide

Arenti SP1 quick guide

Arenti

Arenti SP1 quick guide

WilTec 62391 Operation manual

WilTec

WilTec 62391 Operation manual

Schletter SECT installation manual

Schletter

Schletter SECT installation manual

Campbell SP5 user guide

Campbell

Campbell SP5 user guide

UNIRAC RapidRac G10 installation manual

UNIRAC

UNIRAC RapidRac G10 installation manual

Vaillant auroTHERM VTK 570/2 installation manual

Vaillant

Vaillant auroTHERM VTK 570/2 installation manual

WOLSELEY SX300 Mk II manual

WOLSELEY

WOLSELEY SX300 Mk II manual

Hanwha SolarOne HSL60P-PA-0-235K installation guide

Hanwha SolarOne

Hanwha SolarOne HSL60P-PA-0-235K installation guide

GRUPPOSTG VE1ZZPV W Series Manual of use and maintenance

GRUPPOSTG

GRUPPOSTG VE1ZZPV W Series Manual of use and maintenance

CHINT ASTRONERGY Al-40 Series installation instructions

CHINT

CHINT ASTRONERGY Al-40 Series installation instructions

Panasonic EVERVOLT EVPV Series General installation manual

Panasonic

Panasonic EVERVOLT EVPV Series General installation manual

manuals.online logo
manuals.online logoBrands
  • About & Mission
  • Contact us
  • Privacy Policy
  • Terms and Conditions

Copyright 2025 Manuals.Online. All Rights Reserved.