—5 —
CCD-TR648E/TR748E/TR848
•VC-272 (HI CONTROL)(8/11)
SCHEMATIC DIAGRAM ····························4-39
•VC-272 (AUDIO)(9/11)
SCHEMATIC DIAGRAM ····························4-41
•VC-272 (DC-DC CONVERTER)(10/11)
SCHEMATIC DIAGRAM ····························4-43
•VC-272 (CONNECTOR)(11/11)
SCHEMATIC DIAGRAM ····························4-45
•VC-272 (CAMERA PROCESSOR AMP, Y/C
PROCESSOR, FOCUS/ZOOM MOTOR DRIVE,
REC/PB AMP, LINE OUT AMP, SERVO, MODE
CONTROL, STEADY SHOT, HI CONTROL, AUDIO,
DC-DC CONVERTER, CONNECTOR)
PRINTED WIRING BOARD ·······················4-47
•FP-397 FLEXIBLE BOARD ·····································4-51
4-3. WAVEFORMS ······························································4-52
4-4. MOUNTED PARTS LOCATION ·································4-55
5. ADJUSTMENTS
1. Adjusting items when replacing main parts and boards.·5-2
5-1. CAMERA SECTION ADJUSTMENT ···························5-4
1-1. PREPARATIONS BEFORE ADJUSTMENT
(CAMERA SECTION) ···················································5-4
1-1-1.List of Service Tools························································5-4
1-1-2.Preparations ·····································································5-5
1-1-3.Precaution ········································································5-7
1. Setting the Switch····························································5-7
2. Order of Adjustments ······················································5-7
3. Subjects ···········································································5-7
1-2. INITIALIZATION OF D, E, F, 7 PAGE DATA ··············5-8
1. Initializing the D, E, F, 7 Page Data ································5-8
2. Modification of D, E, F, 7 Page Data ······························5-8
3. D Page Table····································································5-8
4. F Page table ·····································································5-9
5. E Page Table ··································································5-10
6. 7 Page Table···································································5-11
1-3. CAMERA SYSTEM ADJUSTMENTS ························5-12
1. HALL Adjustment ·························································5-12
2. Flange Back Adjustment (Using Minipattern Box)·······5-13
3. Flange Back Adjustment (Using Flange Back Adjustment
Chart and Subject More Than 500mAway) ··················5-14
3-1. Flange Back Adjustment (1) ··········································5-14
3-2. Flange Back Adjustment (2) ··········································5-14
4. Flange Back Check························································5-15
5. Picture Frame Setting ····················································5-15
6. Color Reproduction Adjustment····································5-16
7. Auto White Balance & LV Standard Data Input ···········5-17
8. Auto White Balance Adjustment ···································5-18
9. White Balance Check ····················································5-19
10. Steady Shot Check·························································5-20
1-4. ELECTRONIC VIEWFINDER SYSTEM
ADJUSTMENT·····························································5-21
1. RGB AMP Adjustment (VF-150 board)························5-22
1-1. Automatic Adjustment···················································5-22
1-2. Manual Adjustment ·······················································5-22
2. Contrast Adjustment (VF-150 board) ····························5-23
2-1. Automatic Adjustment···················································5-23
2-2. Manual Adjustment ·······················································5-23
3. White Balance Adjustment (VF-150 board)
(CCD-TR848)································································5-24
5-2. MECHANISM SECTION ADJUSTMENT··················5-25
2-1. ADJUSTMENT REMOTE COMMANDER ················5-25
2-2. OPERATING WITHOUT CASSETTE ························5-25
2-3. TAPE PATH ADJUSTMENT ········································5-25
1. Preparations for Adjustment ··········································5-25
5-3. VIDEO SECTION ADJUSTMENTS ···························5-26
3-1. PREPARATIONS BEFORE ADJUSTMENTS ············5-26
3-1-1.Equipment to Required··················································5-26
3-1-2.Precautions on Adjusting ···············································5-27
3-1-3.Adjusting Connectors ····················································5-28
3-1-4.Connecting the Equipment ············································5-28
3-1-5.Alignment Tape ·····························································5-29
3-1-6.Output Level and Impedance·········································5-30
3-1-7.Recording Mode (Standard 8/Hi8) switching ···············5-30
3-2. SYSTEM CONTROL SYSTEM ADJUSTMENT ········5-31
1. Initialization of D, E, F, 7 Page Data·····························5-31
3-3. SERVO ADJUSTMENT ···············································5-31
1. CAP FG OffsetAdjustment (VC-272 board) ················5-31
2. Switching Position Adjustment (VC-272 board)···········5-31
3-4. VIDEO SYSTEM ADJUSTMENTS·····························5-32
1.
28 MHz Origin OscillationAdjustment (VC-272 board) ·
5-32
2. AFC f0Adjustment (VC-272 board) ·····························5-32
3. Y OUT Level Adjustment (VC-272 board) ···················5-33
4. C OUT Level Adjustment (VC-272 board) ···················5-33
5. RECY Current Adjustment (VC-272 board) ················5-34
6. REC C/AFM Current Adjustment ·································5-35
6-1. Preparations ···································································5-35
6-2. REC C Current Check (VC-272 board) ························5-35
6-3. REC AFM Current Adjustment (VC-272 board) ··········5-36
6-4. Processing after completed adjustment ·························5-36
3-5. AUDIO SYSTEM ADJUSTMENTS ····························5-37
1. 1.5 MHz DeviationAdjustment (VC-272 board) ··········5-37
2. BPF f0Adjustment (VC-272 board) ······························5-37
5-4. SERVICE MODE ··························································5-38
4-1. ADJUSTMENT REMOTE COMMANDER ················5-38
1. Using the Adjustment Remote Commander ··················5-38
2. Precautions Upon Using the Adjustment Remote
Commander ···································································5-38
4-2. DATA PROCESS···························································5-39
4-3. SERVICE MODE ··························································5-40
1. Test Mode Setting··························································5-40
2. Emergency Memory Address ········································5-41
2-1. EMG code (Emergency code) ·······································5-41
2-2. MSW codes ···································································5-42
3. Bit Value Discrimination ···············································5-43
4. Switch check (1) ····························································5-43
5. Switch check (2) ····························································5-43
6. Switch check (3) ····························································5-44
7. Record of Use check······················································5-44
8. Record of Self-diagnosis check ·····································5-45
6. REPAIR PARTS LIST
6-1. EXPLODED VIEWS ······················································6-1
6-1-1.OVERALL SECTION·····················································6-1
6-1-2.F PANEL SECTION ·······················································6-2
6-1-3.CABINET (L) SECTION················································6-3
6-1-4.BATTERY PANEL SECTION ········································6-4
6-1-5.EVF SECTION································································6-5
6-1-6.LENS SECTION ·····························································6-6
6-1-7.CABINET (R) SECTION ···············································6-7
6-1-8.CASSETTE COMPARTMENT ASSY, DRUM ASSY ···6-8
6-1-9.LS CHASSIS BLOCK ASSEMBLY·······························6-9
6-1-10. MECHANICAL CHASSIS BLOCKASSEMBLY-1 ····6-10
6-1-11. MECHANICAL CHASSIS BLOCKASSEMBLY-2 ····6-11
6-2. ELECTRICAL PARTS LIST ········································6-12
* Color reproduction frame are shown on page 199.