EnglishDeutsch
 logo
Brands
  1. Home
  2. •
  3. Brands
  4. •
  5. Spectrum
  6. •
  7. Rack & Stand
  8. •
  9. Spectrum CPU Sling 38925 Quick start guide

Spectrum CPU Sling 38925 Quick start guide

Other Spectrum Rack & Stand manuals

Spectrum 37130 User manual

Spectrum

Spectrum 37130 User manual

Spectrum BUSBY 8451 User manual

Spectrum

Spectrum BUSBY 8451 User manual

Spectrum 37130 User manual

Spectrum

Spectrum 37130 User manual

Spectrum 55559 User manual

Spectrum

Spectrum 55559 User manual

Spectrum 38983 User manual

Spectrum

Spectrum 38983 User manual

Spectrum LT-4 User manual

Spectrum

Spectrum LT-4 User manual

Popular Rack & Stand manuals by other brands

Salamander Acadia AC/W/L400/WH Assembly instructions

Salamander

Salamander Acadia AC/W/L400/WH Assembly instructions

Fohhn VAT-09 Mounting instruction

Fohhn

Fohhn VAT-09 Mounting instruction

ricoo FS0522 quick start guide

ricoo

ricoo FS0522 quick start guide

AMSOIL BMK-22 Installation and service instructions

AMSOIL

AMSOIL BMK-22 Installation and service instructions

Kargo Master 48220 installation guide

Kargo Master

Kargo Master 48220 installation guide

Milestone AV Technologies SIMPLICITY SLF2 installation instructions

Milestone AV Technologies

Milestone AV Technologies SIMPLICITY SLF2 installation instructions

ricoo S1222 installation instructions

ricoo

ricoo S1222 installation instructions

Ready-Set-Mount RSMCM602 instruction manual

Ready-Set-Mount

Ready-Set-Mount RSMCM602 instruction manual

VidaBox VB MNT FFS2 installation guide

VidaBox

VidaBox VB MNT FFS2 installation guide

Welch Allyn 48960 Assembly instructions

Welch Allyn

Welch Allyn 48960 Assembly instructions

Arkon CM035-ST-2 installation instructions

Arkon

Arkon CM035-ST-2 installation instructions

PROEL PLWIN60C user manual

PROEL

PROEL PLWIN60C user manual

Agilent Technologies E2609B installation guide

Agilent Technologies

Agilent Technologies E2609B installation guide

Mustang MV-ARM4 installation guide

Mustang

Mustang MV-ARM4 installation guide

Mounting Solutions WRM-320 manual

Mounting Solutions

Mounting Solutions WRM-320 manual

ShelterIt 21208 installation instructions

ShelterIt

ShelterIt 21208 installation instructions

Pyle PMKSPAD1 manual

Pyle

Pyle PMKSPAD1 manual

SPL RackPack?4 1040 manual 

SPL

SPL RackPack?4 1040 manual 

https://manuals.online logo
https://manuals.online logoBrands
  • About & Mission
  • Contact us
  • Privacy Policy
  • Terms and Conditions

Copyright 2026 Manuals.Online. All Rights Reserved.

Assembly InstructionsAssembly Instructions
0192445 Page 1 of 2
Assembly InstructionsAssembly Instructions
Important
Before you begin, read and comply with all safety and operating instructions,
and ensure all parts and correct quantities are included.
Any parts damaged during shipment must be reported within 5 days of receipt.
To report information regarding missing parts or damage, to purchase parts
or accessories, or if you have any questions, please contact us.
www.spectrumfurniture.com
800-235-1262, 715-723-6750
Thank you for purchasing Spectrum products!
CPU SlingCPU Sling
3892538925
For electric Flex Active Tables,For electric Flex Active Tables,
Esports Evolution, Evolution desksEsports Evolution, Evolution desks
(4) 0101382
#14 x 7/8” PHSM
Worksurface
(1) 0160670
CPU sling
• Provides CPU tower storage under worksurface
• 5”-8.5”W x 18”D x 17.935”H
• The 38925 CPU Sling is specically designed for use with
electrically adjustable Flex Active tables, Evolution, and
Esports Evolution desks.
(1) 035674
3/4” bumper
(1) 060048
Base
(2) 0160741
Bracket
(2) 034195
1/4-20 wing nut
1. Attach base to sling1. Attach base to sling
1. Align the base with the CPU sling and secure with
(2) 1/4-20 wing nuts. Figure 1.
Figure 2
(2) 0107595
58” strap / buckle
assembly
CPU Sling
Bracket
Bracket
#14 x 7/8” PHSM
(1 per bracket)
(2) #14 x 7/8”
PHSM
2. Attach sling to worksurface2. Attach sling to worksurface
Figure 1
Sling base
(2) 1/4-20
wing nut
CPU Sling
1. Determine which side of the worksurface you’d like the CPU sling.
(Left or right).
2. Align the CPU sling with the worksurface pilot holes and secure with
(2) #14 x 7/8” PHSM screws. Figure 2.
3. Secure each bracket to the worksurface as shown with (1) #14 x 7/8”
PHSM screw.
0192445 Page 2 of 2
925 FIRST AVENUE, CHIPPEWA FALLS, WI 54729 / 800-235-1262 / 715-723-6750 / WWW.SPECTRUMFURNITURE.COM925 FIRST AVENUE, CHIPPEWA FALLS, WI 54729 / 800-235-1262 / 715-723-6750 / WWW.SPECTRUMFURNITURE.COM
© 2021 Spectrum Industries Inc., All rights reserved.
Care should be taken when moving the
desk / table on casters to prevent tipping or
shifting of the CPU tower(s) during transit.
Sling bracket
3. Install straps3. Install straps
1. Thread each strap through the slots in the sling bracket and
base as shown in Figure 3 with the tails hanging down.
2. Thread each strap through the buckles as shown.
3. Place the 3/4” bumper between the leg and CPU sling.
Figure 3
Strap / buckle
assembly
Buckle
Bumper
Sling base
CPU tower
1. Slide the base to the widest position and carefully place the CPU
tower into the sling. Figure 4.
2. Slide the base tight against the tower and tighten the two wing nuts.
3. Position both buckles at the same height.
4. Tighten the straps by pulling the tails down until the CPU tower and
base are level and secure.
4. Install CPU tower4. Install CPU tower
Figure 4
Tails
1/4-20 Wing nut
(2 required)
Sling base
2
1
3
1
2
CPU Sling
4
Nylon straps
Nylon straps