© stilum GmbH, Gewerbegebiet Larsheck, 56271 Kleinmaischeid • Tel. +49 (0) 2689 92790-0 • All rights and product modications reserved State: 15.02.2019 p. 2
Mounting instructions for horizontal bar „supra 3“
Item No. 55 1516 401
1. Select the play equipment location in consideration of the required safety
area (see Diagram 3: 3400 x 3810 mm).
2. Carry out excavation work for the foundations as shown in Diagram 2a and
2b. After excavation, compress the foundation oor.
Note: The horizontal bar is built in on the play level. Pay attention to items
marked „play level“ of play equipment!
3. Set up the four concrete foundations acc. to the dimensions indicated in
Diagram 2 with central, horizontal reinforcement.
4. After a setting period of 10-14 days, depending on weather conditions and
foundation size, clean the surface of the foundation.
5. Place the two pre-mounted elements acc. to diagram 2a and 2b on the found-
ations and connect the elements with the delivered screw.
Note: Do not screw the base plates onto the foundations yet!
6. Place the pre-assemled play equipment on the foundation and screw it with
the heavy-duty dowels included in the delivery.
7. Fill up and compress the holes between the foundation and the foundation
hole with the excavation.
Reinforcement plan: Concrete foundation with reinforcement
Main foundation: BSt 500S
Ever 4 stirrups Ø 8 mm lengthwise and cross
Concrete cover h´= 3 cm
Concrete quality class C20/25
700
150500
650
A A
3808
700
812
700
1148
1960
1512
3108
A-A
Erde
Ground
Füllmaterial
Filling
Beton
Concrete
Blatt:
Projekt:
Artikelnummer:
ZG-NR:
BENENNUNG:
OHNE SCHRIFTLICHE ZUSTIMMUNG DER CONRADI + KAISER GMBH DARF DIESE TECHNISCHE UNTERLAGE WEDER VERVIELFÄLTIGT
NOCH DRITTEN MITGETEILT ODER ZUGÄNGLICH GEMACHT WERDEN NOCH IN SONSTIGER WEISE MISSBRÄEUCHLICH VERWENDET
WERDEN. ZUWIDERHANDLUNGEN WERDEN URHEBERRECHTLICH VERFOLGT.
FREIG:
GEPR:
GEZ
:
DATUM:
NAME:
WERKSTOFF
MAßSTAB:
OBERFLAECHEN NACH
DIN ISO 1302 REIHE 2
ZUL. ABWEICHUNG
DIN 2768 - mH
+0,3
-0,3
WERKSTUECKKANTEN
NACH DIN 6784
Gewerbegebiet Larsheck
56271 Kleinmaischeid
Deutschland
A3
1
2105-00-00
551516401
3408x1112x1842
Fertigung:
Mattheis
Gewicht:
30916.20
Supra3(150)
Zust.
Änderung
Name
Abmaße:
Zuschnitt:
Fundament
Datum
17.10.16
700
150500
650
A A
3808
700
812
700
1148
1960
1512
3108
A-A
Erde
Ground
Füllmaterial
Filling
Beton
Concrete
Blatt:
Projekt:
Artikelnummer:
ZG-NR:
BENENNUNG:
OHNE SCHRIFTLICHE ZUSTIMMUNG DER CONRADI + KAISER GMBH DARF DIESE TECHNISCHE UNTERLAGE WEDER VERVIELFÄLTIGT
NOCH DRITTEN MITGETEILT ODER ZUGÄNGLICH GEMACHT WERDEN NOCH IN SONSTIGER WEISE MISSBRÄEUCHLICH VERWENDET
WERDEN. ZUWIDERHANDLUNGEN WERDEN URHEBERRECHTLICH VERFOLGT.
FREIG:
GEPR:
GEZ
:
DATUM:
NAME:
WERKSTOFF
MAßSTAB:
OBERFLAECHEN NACH
DIN ISO 1302 REIHE 2
ZUL. ABWEICHUNG
DIN 2768 - mH
+0,3
-0,3
WERKSTUECKKANTEN
NACH DIN 6784
Gewerbegebiet Larsheck
56271 Kleinmaischeid
Deutschland
A3
1
2105-00-00
551516401
3408x1112x1842
Fertigung:
Mattheis
Gewicht:
30916.20
Supra3(150)
Zust.
Änderung
Name
Abmaße:
Zuschnitt:
Fundament
Datum
17.10.16
3808
700
812
700
1148
1960
1512
3108
A-A
Erde
Ground
Füllmaterial
Filling
Beton
Concrete
Blatt:
Projekt:
Artikelnummer:
ZG-NR:
BENENNUNG:
OHNE SCHRIFTLICHE ZUSTIMMUNG DER CONRADI + KAISER GMBH DARF DIESE TECHNISCHE UNTERLAGE WEDER VERVIELFÄLTIGT
NOCH DRITTEN MITGETEILT ODER ZUGÄNGLICH GEMACHT WERDEN NOCH IN SONSTIGER WEISE MISSBRÄEUCHLICH VERWENDET
WERDEN. ZUWIDERHANDLUNGEN WERDEN URHEBERRECHTLICH VERFOLGT.
FREIG:
GEPR:
GEZ
:
DATUM:
NAME:
WERKSTOFF
MAßSTAB:
OBERFLAECHEN NACH
DIN ISO 1302 REIHE 2
ZUL. ABWEICHUNG
DIN 2768 - mH
+0,3
-0,3
WERKSTUECKKANTEN
NACH DIN 6784
Gewerbegebiet Larsheck
56271 Kleinmaischeid
Deutschland
A3
1
2105-00-00
551516401
3408x1112x1842
Fertigung:
Mattheis
Gewicht:
30916.20
Supra3(150)
Zust.
Änderung
Name
Abmaße:
Zuschnitt:
Fundament
Datum
17.10.16
Diagram 2a: Side view with dimension details „supra 3“
Diagram 2b: Position of the foundations