Striem SI-UPC-1016 Technical Document

Striem
3100 Brinkerhoff
Kansas City, KS 66115
Tel: 913-222-1500
Fax: 913-291-0457
www.
striemco.com
Made in the U.S.A
SI-UPC-1016
Liquid capacity: 250 gallons
Optional basket capacity: 7 gallons
Sheet Descriptions
Sheet #1 - Series overview and Warranty information
Sheet #2 - General installation guidelines and Operation/Maintenance guidelines
Sheet #3 - Below Grade installation guidelines
Sheet #4 - TeleGlide Riser installation guidelines
STRIEM SAND INTERCEPTOR
(SI-UPC-1016)
Leak/Seal Testing
DO NOT AIR TEST UNIT OR TELEGLIDE RISER SYSTEM! Doing so may result in property damage, personal injury or death.
Base Unit:
To perform a leak/seal test on the base unit, cap/plug all plumbing connections, remove the cover, and fill the unit with water just above the
highest connection. Inspect unit and connections for leaks. Check water level at specific time intervals per local code.
TeleGlide Riser System:
If required by local code, the riser system may be leak/seal tested similar to the base unit.
CAUTION:
the riser(s) must be supported
before filling with water to keep from tipping over. Once riser system is in place and properly supported, cap/plug all plumbing connections on the main unit,
remove the cover from the top of the riser assembly and fill the unit and riser system with water to finished grade level. Carefully, as the riser(s) will be very
heavy from the weight of the water, inspect all gasket(s) and clamps (if applicable) for any leaks. Check water level at specific time intervals per local code.
Lifetime Warranty
Effective March 2, 2015 Striem represents and warrants that HDPE products will be free from any and all defects in material and workmanship, including
corrosion, during the lifetime of the plumbing system in which the Products were originally installed and will, at its option, agree to repair, replace, or supply
credit to the original purchaser.
This warranty does not cover damage caused by the products’ normal usage, or wear and tear, nor does it cover damage from naturally occurring
phenomenon, including, but not limited to UV, freeze-related damage, or natural disasters. This warranty does not cover the purchaser’s cost of routine
maintenance including replacement of parts required in routine maintenance.
This warranty does not cover fabricated steel products, or any monitoring equipment. This warranty shall be effective if, and only if, the products:
* Were installed in accordance with Striem’s notes, specifications and instructions, for installation, operation, and maintenance;
* Were installed in conformance with all applicable building and plumbing codes, and passed all applicable testing methods immediately following installation;
* Have not been subjected to misuse or abuse, whether negligent or intentional;
* Were never modified, repaired, or altered by any individual(s) not authorized by Striem.
This warranty is the purchaser’s sole and exclusive remedy, and acceptance of this exclusive remedy is a condition of the contract for thepurchase of these
products. In no event shall Striem be liable for any incidental, special, consequential or punitive damages, or for any costs, attorney fees, expenses, losses or
delays claimed to be as a consequence of any damage to, failure of, or defect in any products including, but not limited to, any claims for loss of profits,
transportation, removal and installation charges. This warranty is exclusive and in lieu of all other warranties or conditions, written or oral, expressed or implied.
SAND INTERCEPTOR INSTALLATION,
OPERATION AND MAINTENANCE GUIDE
ECO:
02/18/19
MJ
REV:
DATE:
DWG BY:
DESCRIPTION:
PROPRIETARY AND CONFIDENTIAL
THE INFORMATION CONTAINED IN THIS DRAWING IS THE SOLE PROPERTY OF
STRIEM, LLC.
ANY REPRODUCTION IN PART OR AS A WHOLE WITHOUT THE WRITTEN PERMISSION OF
STRIEM, LLC.
IS
PROHIBITED.
NOTES:
Striem Sand Intercepyot tanks are not to be installed in any other manner except as shown. Consult local
codes for separate trapping requirements, cleanout locations and additional installation instructions.
SHEET NUMBER:
1 of 4

Striem
3100 Brinkerhoff
Kansas City, KS 66115
Tel: 913-222-1500
Fax: 913-291-0457
www.
striemco.com
Made in the U.S.A
FLOW
Set unit on level solid surface as close as
possible to fixtures being served. If unit is
to be installed below grade refer to below
grade installation instructions. (sheet #3)
Isometric View
FLOW
Connect inlet and outlet drainage lines to unit.
Mechanically couple pipes to unit.
Do not solvent weld
.
Top View
EE
OPERATION
Striem SI-UPC-1016 sand interceptors are designed to settle heavy sand and sediment
that may enter the waste system. Wastewater passes through the inlet grate, or inlet
connection, then enters the settling chamber where heavy debris settles before the
wastewater exits through the outlet.
MAINTENANCE
Remove covers.
1.
If unit has optional sediment basket, empty contents into receptacle.
2.
Clean main body of the interceptor. Make sure to remove all accumulated water,
3.
debris, and sediment.
Clean sidewalls of any accumulated debris. Do not allow any material
4.
to enter into the plumbing system.
Replace optional sediment basket.
5.
Replace covers. Inspect gasket on underside for wear and tear.
6.
Run fixture(s) with water to fill interceptor.
7.
Properly dispose of collected material.
8.
PUMPING FREQUENCY:
Based upon all the variables, every solids interceptor will have to have its own maintenance
schedule. A solids interceptor may have to be cleaned weekly, monthly, or annualy after
initial installation in order to determine optimum maintenance schedule.
GENERAL INSTALLATION INSTRUCTIONS
(SI-UPC-1016 SHOWN)
Optional Removable Sediment Basket
(BCB-7)
SAND INTERCEPTOR INSTALLATION,
OPERATION AND MAINTENANCE GUIDE
ECO:
02/18/19
MJ
REV:
DATE:
DWG BY:
DESCRIPTION:
PROPRIETARY AND CONFIDENTIAL
THE INFORMATION CONTAINED IN THIS DRAWING IS THE SOLE PROPERTY OF
STRIEM, LLC.
ANY REPRODUCTION IN PART OR AS A WHOLE WITHOUT THE WRITTEN PERMISSION OF
STRIEM, LLC.
IS
PROHIBITED.
NOTES:
Striem Sand Interceptor tanks are not to be installed in any other manner except as shown. Consult local
codes for separate trapping requirements, cleanout locations and additional installation instructions.
SHEET NUMBER:
2 of 4

Clean out to grade
on inlet pipe of each
unit (by others)
Clean out to grade
on outlet pipe of each
unit (by others)
Risers to grade
EXCAVATION AND BACKFILL DETAIL
(INTERIOR OR EXTERIOR)
2-Way cleanout
tee (by others)
2-Way cleanout
tee (by others)
SIDE VIEW DETAIL
Optional Anchor kit
see detail
Optional Anchor kit
see detail
Concrete slab
Native soil
Crushed aggregate
or sand
Optional Anchor kit
see detail
FLOW FLOW
Striem
3100 Brinkerhoff
Kansas City, KS 66115
Tel: 913-222-1500
Fax: 913-291-0457
www.
striemco.com
Made in the U.S.A
30"
60"
4"
the unit footprint
Concrete Pad
must extend
18" outside
45.00°
2 1/2"
Min.
18" outside the unit footprint
Concrete Pad must extend
8"
4"
Rebar
Finished Grade
Rebar
CB-275-S
Shown
CONCRETE SLAB DETAIL FOR TRAFFIC LOADING
(INTERIOR OR EXTERIOR)
(SI-UPC-1016 Shown)
Top View
Elevation View
For unit details see specification sheet for selected unit
(Connecting pipe and fittings by others)
VENT
CONNECTIONS
Connect waste piping to the unit.
1.
BACKFILLING & FINISHED CONCRETE SLAB
Preparation of sub grade per geotech recommendations.
1.
Stabilize and compact sub grade to 95% proctor.
2.
Fill tank with water before backfilling to prevent float out during piping installation.
3.
Before backfilling and pouring of slab secure cover(s) and riser/s (if necessary) to the unit(s)
4.
Backfill using crushed aggregate material approximately 3/4" size rock, or sand,
5.
with no fines.
6. Place 6" aggregate base under slab. Aggregate should be 3/4" size rock, or sand, with no fines.
7. Thickness of concrete around cover to be determined by specifying engineer. If traffic
loading is required the concrete slab dimensions shown are for guideline
purposes only.
8. Concrete to be 28 day compressive strength to 4000 PSI.
9. NO. 4 rebar (
1/2") grade 60 steel per ASTM A615: connected with tie wire.
10. Rebar to be 2 1/2" from edge of concrete.
11. Rebar spacing 12" grid. 4" spacing around access openings.
12. All pipe penetrations to be sleeved or have slip connections.
BELOW GRADE INSTALLATION INSTRUCTIONS
EXCAVATION
Install unit(s) as close as possible to fixtures being serviced.
1.
Width and length of excavation shall be minimum 12" greater
2.
than the tank on all sides.
Depth of excavation shall be 6" deeper than tank bottom.
3.
Set the tank level in well-packed crushed aggregate material
4.
approximately 3/4" size rock, or sand, with no fines.
Anchor kit is recommended for installations in high water table conditions to
5.
prevent float out. To be determined by specifying engineer. If necessary,
order optional "Anchor Kit" (see detail right).
INTERIOR OR EXTERIOR BELOW GRADE INSTALLATION INSTRUCTIONS
Stainless steel
anchor strap
Stainless steel
Anchor plate
Stainless hardware
ANCHOR KIT INSTALLATION DETAIL
Anchor Kit Installation Steps
Slide "Anchor Hook" over tie down point on end wall and
1.
bolt to Anchor Strap.
Bolt "Anchor Strap" to "Anchor Plate" using provided hardware
2.
Hold down force achieved by backfill weight acting on Anchor Plate.
3.
Anchor Plate may be bolted to concrete slab, if required, by using
4.
holes provided in Anchor Plate.
Stainless steel
anchor hook
ECO:
02/18/19
MJ
REV:
DATE:
DWG BY:
DESCRIPTION:
PROPRIETARY AND CONFIDENTIAL
THE INFORMATION CONTAINED IN THIS DRAWING IS THE SOLE PROPERTY OF
STRIEM, LLC.
ANY REPRODUCTION IN PART OR AS A WHOLE WITHOUT THE WRITTEN PERMISSION OF
STRIEM, LLC.
IS
PROHIBITED.
SHEET NUMBER:
3 of 4
NOTES:
Striem Sand Incterceptor tanks are not to be installed in any other manner except as shown. Consult local
codes for separate trapping requirements, cleanout locations and additional installation instructions.
SAND INTERCEPTOR INSTALLATION,
OPERATION AND MAINTENANCE GUIDE

Striem
3100 Brinkerhoff
Kansas City, KS 66115
Tel: 913-222-1500
Fax: 913-291-0457
www.
striemco.com
Made in the U.S.A
VENT
Cut location "C"
LR24
(long riser)
(optional component)
Gasket
Upper Clamp
Lower Clamp
Figure 2
Adapter
Riser
Riser Height +
Distance from step 5
4"
Cut
Mark
Figure 3
Adapter
Riser
Cut location "A"
Cut location "B"
Cover
Gasket
Lower clamp
Upper clamp
Adapter
Adapter
Adapter
Cover
Cover
Gasket
Gasket
SI-UPC-1016
(standard)
Upper clamp
Lower clamp
Lower clamp
Upper clamp
exceed 4"*
Must be at least
2-1/2" and cannot
Gasket
Unit
Riser/Adapter
Upper Clamp
Lower Clamp
Figure 4
Riser Height
Finished floor
Figure 1
Call Striem with questions or suggestions @ 1-913-222-1500 Customer Service Hours: 8AM-5 PM CST
Adapter
Tools included (with base grease interceptor unit(s))
7/16" Nut driver tool/bit
•
Silver permanent marker
•
Tools Needed:
Tape measure
•
Regular or cordless drill with 1/2" chuck
•
Tools needed if Riser(s) require cutting:
Jigsaw or
•
Cordless circular saw or
•
Reciprocating saw
•
Riser Assembly Instructions/Steps:
If the unit is to be installed on grade (on-the-floor), there is no need for any adjustments.
1.
the unit is ready to be put into service.
2. If the unit is to be buried: Once the unit is set up so that the pipe connections line up with
the jobsite piping, measure the total riser height needed from the top of the cover to finished
grade. Make sure you include any future tile work, etc. that may be installed
in your finished grade measurements. See figure 1.
3. Select the according risers needed based off Table 1.
4. If risers are needed, remove covers from the adapters and remove the adapters from
the main unit by loosening the upper clamp with included nut driver bit (lower band is factory
set, do not adjust or remove). On the floor near the unit, insert the adapter into the first riser
until it stops. If needed, insert the bottom of the first riser into the top of second riser until it stops.
You may need to tighten the upper clamps during this step to keep the risers from shifting.
Adapter and riser(s) should sit level with each other. Removal of cover during this process
will ease assembly.
5. From the top of the adapter, measure your needed total riser height downward to the
sidewall of the riser. Then, add
6”
For example, if you have a SI-UPC-1016 and need a 15-1/2” extension, you would measure
down from the top of the adapter 21-1/2” (15-1/2” + 6” = 21-1/2”). See Figure 2.
6. Refer to Table 2 1 to determine if, and where, any cuts need to be made.
If a cut needs to be made, make a circular line around the sidewall of the riser with the
included silver marker at your riser height
+dimension from step 5
. Using a jigsaw, circular
saw or reciprocating saw, cut along your line. Discard/recycle the cutoff scrap.
7. Whether the riser needs to be cut or not, make another mark with the silver marker on the
sidewall of the riser a distance of
4 INCHES
from the edge just cut. If you did not make a cut
(meaning your riser height
+ dimension from step 5
line was beyond the bottom edge of
your riser), still mark the sidewall of the riser 4 INCHES above where your riser height
+ dimension from step 5
line would have been. DO NOT cut this new line.
Once the riser is installed into the main unit, this new line will end up at the top of the gasket
and will aid in re-assembly. See Figure 3.
8. IMPORTANT: Before the next step:
Make sure the diffuser is installed inside the main unit at the appropriate location.
Refer to sheet 1 of the installation instructions for leak/water testing procedures.
9. Take risers and adapters apart to reduce the weight during installation. Wipe all sidewalls and
inside of gasket with a damp cloth to remove jobsite dust/debris. Install components into the main
unit starting from the lowest (cut) riser and working your way toward the finished floor level. Upper
clamps at each gasket need to be loosened or removed to aid in assembly. Once risers/adapters
inserted into gasket, upper clamp can be tightened.
10. Verify that the bottom of the lowest riser is protruding at least 2-1/2” but no more than 4” into
the main unit from the top of the gasket. Your mark from step 7 should be at the top edge
of the gasket on the main unit. If measurements were made correctly, this should happen
automatically. See figure 4.
11. If tilting of the adapter is required to be flush with finished grade, it must be done AFTER all
clamps have been tightened with riser(s)/adaptor in a vertical and level position. Tilting is
achieved by using the flexibility of the gasket. If tilting is done before clamps are tightened, a
perfect gasket seal may be compromised. Striem recommends tilting only the adapter versus the
entire riser assembly to make sure your riser height is maintained.
12. Tighten all clamps to a minimum of 5 and a maximum of 8 ft lbs. of torque. Use the same torque
as you would tighten a rubber no-hub coupling.
13. The adapter must be adjusted
upward
to achieve certain extension heights. See Table.
14. If jobsite riser height conditions change after the above steps have been completed, there
may still be room for vertical adjustment in both directions. As long as minimum and maximum
overlaps are maintained (see Figure 4), the adapter/riser(s) can be adjusted/cut as many times
as necessary. Please follow these steps from the beginning to ensure the proper overlaps are
maintained.
1. Adjust
adapter
upwards to reach 19-1/2" to 21-1/2"
2. Adjust
adapter
upwards to reach 34-1/2" to 36-1/2"
3. Adjust
adapter
upwards to reach 53-1/2" to 55-1/2"
4. Adjust
adapter
upwards to reach 68" to 70"
TeleGlide Riser (24 Series) Installation Guidelines
(SI-UPC-1016)
SR24
(short riser)
(optionsl component)
SAND INTERCEPTOR INSTALLATION,
OPERATION AND MAINTENANCE GUIDE
ECO:
02/18/19
MJ
REV:
DATE:
DWG BY:
DESCRIPTION:
PROPRIETARY AND CONFIDENTIAL
THE INFORMATION CONTAINED IN THIS DRAWING IS THE SOLE PROPERTY OF
STRIEM, LLC.
ANY REPRODUCTION IN PART OR AS A WHOLE WITHOUT THE WRITTEN PERMISSION OF
STRIEM, LLC.
IS
PROHIBITED.
NOTES:
Striem Sand Interceptor tanks are not to be installed in any other manner except as shown. Consult local
codes for separate trapping requirements, cleanout locations and additional installation instructions.
SHEET NUMBER: