Symmetry KING COBRA Series User manual

INSTALLATION WARNINGS:
• Read the entire instruction manual before beginning any installation or assembly
• The installer must verify that the attachment surface can safely support the
combined weight of all the attached equipment and hardware
• Improper installation of this equipment may cause extensive property damage
or serious personal injury, either during or after installation
DISCLAIMER:
• The manufacturer and/or distributor will bear no responsibility for any damages of
any kind arising from any improper installation of this product
• In no way will the manufacturer and/or distributor be held liable for any damage to
the monitor, property or personal injury should any excessive force either intentionally
or unintentional be applied to the monitor or monitor support assembly
7752180 Rev_A
Grommet Plate - Bag Kit Quick Connect Adapter
- Bag Kit
Grommet Plate
3/8-16 x 2 1/2” Bolt
3/8-16 x 3 1/4” Bolt
QTY - 4
4MM x 8MM Long Screws
QTY - 4
4MM x 12MM Long Screws
Height Adjustable Arm Side Shrouds
Height Adjustable Arm
Counterbalance Adjusting Screw
Fixed Arm Cable Cover
Base Cable
Management
Clips
Arm Rotation
Limiting Screw
Arm Joint Cable
Management Clips
USB Ports
Powered
Outlets Arm Clamp
Bracket
Lower Clamp
Assembly
Gauge
Tilt Tension
KING COBRA -
INSTALLATION MANUAL
Light Duty and Heavy Duty Single Screen Powered Base Monitor Support
Single Light Duty (5-20 lbs capacity) / Single Heavy Duty (10-30 lbs capacity)
1/8”
3/16”
1/4”
INCLUDED:YOU WILL NEED:
9/16” Wrench
Phillips
SINGLE LIGHT DUTY
SINGLE HEAVY DUTY

Heavy Duty Clamp
C. Mounting the Monitor:
1. Attach the quick connect adapter to the rear of the
monitor using the 4mm screws provided. Make sure the
arrow on the adapter is pointing to the top of the screen
2. With the arrow pointing up, slide the adapter bracket onto the arm
VESA Plate until the bottom tab clicks onto the VESA plate
3. To remove the monitor, depress the tab to remove from the VESA bracket assembly
Adjusting the tilt tension:
If the monitor drops or is too tight, adjust the tilt tension screw at the side of the head
using the 3/16” Allen key
G. Primary Arm Counterbalance Adjustment:
1. With the monitor installed on the arm, locate the counterbalance
adjusting screw
2. If the adjustable arm lowers under the weight of the monitor,
using the 1/4” Allen Key, turn the screw counter clockwise in
the direction of the +arrow until balanced.
If the monitor is difficult to lower or lifts by itself, turn the adjustment
screw clockwise in the direction of the – arrow, until the arm is counterbalanced.
Note: Use the gauge at the rear of the arm to assist in setting up multiple arm installations
H. Secondary Counterbalance Adjustment:
If the monitors do not adjust smoothly or hold
position after the primary adjustment method,
further adjustment is available using the
following procedure
1. Remove the right hand height adjustable arm shroud
2. Locate the two countersunk screw heads A & B
3. Using the 3/16” Allen Key, tighten the screws in 1/2 turn increments to fine tune the friction
adjustment of the arm. Clockwise rotation will increase the friction on the joint and
counterclockwise will decrease the friction. Both A & B screws should be adjusted equally
4. When the arm is counterbalanced to support the monitor load, replace the right hand
height adjustable arm side shroud
A. Clamp Mounting the Arm to the Work Surface (Light and Heavy Duty):
1. Open the clamp pad/s by unscrewing the clamping knob/s, so that the clamp assembly
will slide onto the work surface
2. Position the arm assembly onto the work surface and securely clamp to the work
surface by tightening the clamp knob/s
NOTE: For panel systems where the assembled clamp cannot be attached as an assembly.
Remove the Lower Clamp Assembly by removing the three 1/4” socket head cap screws.
Slide the arm clamp bracket in the space between the rear of the desk and panel system,
then attach the Lower Clamp Assembly to the arm clamp bracket using the three
1/4 - 20 socket head cap screws. Tighten the clamp knob/s to securely clamp to
the work surface.
Light Duty Clamp
I. Rotation Limiter:
To limit the arm rotation to 180°, place the arm straight out towards the front edge of
the work surface, locate the arm rotation limiting screw on the base & using the 1/8”
Allen key tighten clockwise to engage lock. Do not over tighten
CAUTION: For total screen loads 20 lbs. or higher, the Rotation Limiter must be
engaged to keep the load properly supported above the work surface.
Screw A
Screw B
7752180 Rev_A
B. Grommet Mounting
the Arm to the Work Surface:
1. Remove the Arm Clamp Bracket by undoing the three 1/4” socket head cap screws.
2. Using a Phillips screw driver, remove the two countersunk screws which attach the arm
clamp bracket to the base of the monitor arm
3. Lay any monitor cables through the grommet hole on the work surface
4. Align the base of the monitor arm assembly over the grommet hole on the work surface,
passing any cables under the rear cut-out in the arm base
5. Depending on the thickness of the work surface insert either the 3/8-16 x 2 1/2” bolt or
3/8-16 x 3 1/4” bolt through the centre hole of the grommet plate, with the flanges
facing up. Insert the treaded end of the 3/8” bolt through the grommet hole and into the
threaded hole in the arm base & tighten securely with a 9/16” wrench or socket
Arm Clamp
Bracket
D. Base Cable Management - Pass the cables that extend from the rear of the desk
through the two cable management clips situated between the base and fixed height arm
E. Fixed Arm Cable Management -Remove the fixed arm cable cover by pulling
sideways to detach from the arm. Lay the cables into the trough on the cable cover and
carefully re-attach the cover to the arm, then insert the cables into the cable clips at the
arm joint
F. Height Adjustable Arm Cable Management -Pull to remove the left and right side
cable shrouds and lay the cables into side shroud trough. Carefully replace the side shrouds
ensuring the retaining clips are correctly seated.
Ensure enough slack is provided in cables to provide full arm articulation
Height
Adjustable Arm Fixed arm

INSTALLATION WARNINGS:
• Read the entire instruction manual before beginning any installation or assembly
• The installer must verify that the attachment surface can safely support the
combined weight of all the attached equipment and hardware
• Improper installation of this equipment may cause extensive property damage
or serious personal injury, either during or after installation
DISCLAIMER:
• The manufacturer and/or distributor will bear no responsibility for any
damages of any kind arising from any improper installation of this product
• In no way will the manufacturer and/or distributor be held liable for any damage
to the monitor, property or personal injury should any excessive force either
intentionally or unintentional be applied to the monitor or monitor support assembly
Grommet Plate - Bag Kit Quick Connect Adapter -
Bag Kit (2 supplied)
Left Hand Crossbar Assembly - Bag Kit
Right Hand Crossbar Assembly - Bag Kit
Grommet Plate
3/8-16 x 2 1/2” Bolt
3/8-16 x 3 1/4” Bolt
Height Adjustable Arm Side Shrouds
Counterbalance Adjusting Screw
Gauge
Fixed Arm Cable Cover
Base Cable
Management
Clips
Arm Rotation
Limiting Screw
Arm Joint Cable Management Clips
Arm Clamp
Bracket
Crossbar Hub
QTY - 2
6-32 x 1/2” Long CSK Screws
QTY - 2
6-32 x 1/2” Long CSK Screws
7762180 Rev_A
Tilt Tension
QTY - 4
4MM x 8MM Long Screws
QTY - 4
4MM x 12MM Long Screws
Lower Clamp
Assembly
INSTALLATION MANUAL
Dual Screen Powered Base Monitor Support - Arm assembly
Dual (15-40 lbs capacity)
1/8”
3/16”
1/4”
INCLUDED:YOU WILL NEED:
9/16” Wrench
Phillips
USB Ports
Powered
Outlets
Height Adjustable Arm

B. Grommet Mounting the
Arm to the Work Surface:
1. Remove the Arm Clamp Bracket by undoing
the three 1/4” socket head cap screws.
2. Using a Phillips screw driver, remove the two countersunk screws
which attach the arm clamp bracket to the base of the monitor arm
3. Lay any monitor cables through the grommet hole on the work surface
4. Align the base of the monitor arm assembly over the grommet hole on the
work surface, passing any cables under the rear cut-out in the arm base
5. Depending on the thickness of the work surface insert either the 3/8-16 x 2 1/2” bolt
or 3/8-16 x 3 1/4” bolt through the centre hole in the grommet plate, with the flanges
facing up. Insert the treaded end of the 3/8” bolt through the grommet hole and into
the threaded hole in the arm base & tighten securely with a 9/16” wrench or socket
D. Mounting the Monitors:
1. Attach the quick connect adapter to the rear of the
monitor using the 4mm screws provided. Make sure the
arrow on the adapter is pointing to the top of the screen
2. With the arrow pointing up, slide the adapter bracket onto the
arm VESA Plate until the bottom tab clicks onto the VESA plate
3. To remove the monitor, depress the tab to remove from the VESA bracket assembly
Adjusting the tilt tension:
If the monitor drops or is too tight, adjust the tilt tension screw at the side of the head
using the 3/16” Allen key
H. Primary Arm Counterbalance Adjustment:
1. With the monitors installed on the arm, locate the
counterbalance adjusting screw
2. If the adjustable arm lowers under the weight of the monitor,
using the 1/4” Allen Key, turn the screw counter clockwise in
the direction of the + arrow until balanced.
If the monitor is difficult to lower or lifts by itself, turn the adjustment screw clockwise
in the direction of the – arrow, until the arm is counterbalanced. Note: Use the
gauge at the rear of the arm to assist in setting up multiple arm installations
E. Base Cable Management - Pass the cables that extend from the rear of the desk
through the two cable management clips situated between the base and fixed height arm
F. Fixed Arm Cable Management -Remove the fixed arm cable cover by pulling sideways
to detach from the arm. Lay the cables into the trough on the cable cover and carefully
re-attach the cover to the arm, then insert the cables into the cable clips at the arm joint
G. Height Adjustable Arm Cable Management -Pull to remove the left and right side
cable shrouds and lay the cables into side shroud trough. Carefully replace the side shrouds
ensuring the retaining clips are correctly seated.
Ensure enough slack is provided in cables to provide full arm articulation
C. Attaching the Crossbars to the Hub:
1. Insert the left hand crossbar into the crossbar hub on the monitor arm
2.
Insert the 6-32 x countersunk screws into the upper and lower mounting holes
3. Securely tighten the upper and lower screws using a Philips screwdriver
4. Repeat the above procedure for the right hand crossbar
J. Rotation Limiter:
To limit the arm rotation to 180°, place the arm
straight out towards the front edge of the work
surface, locate the arm rotation limiting screw
on the base & using the 1/8” Allen key tighten
clockwise to engage lock.
Do not over tighten
CAUTION: For total screen loads 20 lbs. or higher,
the Rotation Limiter must be engaged to keep the
load properly supported above the work surface.
I. Secondary Counterbalance Adjustment:
If the monitors do not adjust smoothly or hold position
after the primary adjustment method, further adjustment
is available using the following procedure
1. Remove the right hand height adjustable arm shroud
2. Locate the two countersunk screw heads A & B
3. Using the 3/16” Allen Key, tighten the screws in 1/2 turn increments to fine tune the
friction adjustment of the arm. Clockwise rotation will increase the friction on the joint and
counterclockwise will decrease the friction. Both A & B screws should be adjusted equally
4. When the arm is counterbalanced to support the monitor load, replace the right hand
height adjustable arm side shroud
A. Clamp Mounting the Arm to the Work Surface:
1. Open the clamp pad/s by unscrewing the clamping knob/s,
so that the clamp assembly will slide onto the work surface
2. Position the arm assembly onto the work surface and securely
clamp to the work surface by tightening the clamp knob/s
NOTE: For panel systems where the assembled clamp cannot be attached as an assembly.
Remove the Lower Clamp Assembly by removing the three 1/4” socket head cap screws. Slide
the arm clamp bracket in the space between the rear of the desk and panel system, then attach
the Lower Clamp Assembly to the arm clamp bracket using the three 1/4 - 20 socket head cap
screws. Tighten the clamp knob/s to securely clamp to the work surface.
Screw A
Screw B
7762180 Rev_A
Height
Adjustable Arm Fixed arm
Arm Clamp
Bracket

INSTRUCTION SHEET / MONITOR SLIDER
STEP 1
Rotate the monitor mount on the existing arm 90° clockwise
and lock out the rotation with the screw provided.
STEP 3
To slide the monitor left or right, loosen the 2 thumb knobs located at the top of the slider.
STEP 2
Using the 4 thumb knobs, install the slider to the monitor mount.
King Cobra Monitor Slider Installation
Table of contents
Other Symmetry Rack & Stand manuals
Popular Rack & Stand manuals by other brands

Eagle Group
Eagle Group High Density Floor-Trak Assembly instructions

Adtec
Adtec Systema SW35S installation instructions

GABOR
GABOR LeviTouch DM-500 user manual

Konig & Meyer
Konig & Meyer 18933 quick start guide

Siemon
Siemon HD5 Series instructions

Teledyne Lecroy
Teledyne Lecroy HDO9000 Assembly instructions