funnel.
3. Power wiring: This machine is equipped with DC24 DC power. Due to
the large rated current, the power cable diameter requirement is
≥10mm².Recommended that professional electricians operate the
wiring or consult the relevant personnel of the company.
4. Pressure :The hydraulic pressure have already finish adjust before
shipping ,so user should not adjust it themselves to avoid overloading
the machine.
5. Lubricate the mold base: When the machine starts to shrink the tube,
first add lithium base grease or other suitable lubricant to the die holder
to fully lubricate the working friction surface.
6. Fuel tank ventilation: When starting the machine, ensure that the oil
filling screw plug is loose and ventilated to avoid the oil tank sealing and
the internal vacuum when the oil pump is working.
7. Air removal: During the initial refueling work, there will be some air in
the system and the equipment will run at the same time. Please follow
the steps below to exhaust:
8. Mold selection: When the user shrinks the tube, the corresponding mold
should be selected according to different hoses, wherein the head
number of the mold end face is the diameter of the inner hole of the
mold closed
(see Figure 8-1).
8-1
9. Size adjustment: The final crimping size of the pipe can be adjusted by
size adjustment. The regulator is used in the same way as the
micrometer. The fixed length is 1mm and the moving ruler is 0.02mm.
After selecting the appropriate mold, the regulator can be used to
achieve the final Control the size.