Trendwood PATIO L THERMO SAUNA User manual

PATIO L THERMO SAUNA
INSTALLATION MANUAL

1
Instructions
Tape measure
Required tools
It is recommended to install the sauna above ground level to prevent the base frame of the sauna from coming into
direct contact with the ground. Install a water-resistant material, such as bitumen strips, between the base frame and
the base surface.
1.
Make sure that the surface on which you install the sauna is level and stable before and after installing the sauna.
Otherwise, the doors of the sauna may not open and close properly later on.
2.
During the first heating of the sauna, it must be constantly supervised, and the doors should be kept open, as the
stove emits a specific odor when first heated. Read more from the user manual for the sauna stove.
3.
The maximum permitted temperature in the steam room is +90 °C. If heated to a higher temperature, the sauna may
become overheated.
4.
In order to avoid damage caused by the weight of snow in winter, any snow should be removed from the roof of the
sauna. Keep in mind that the roof covering should not be damaged during snow removal.
5.
If your sauna has lighting, install a 3G 2,5 mm outdoor power cable and connect it in accordance with the
schematics on the plug socket coupler provided with the sauna. The power cable of the sauna must be connected to
a residual-current circuit breaker! Consult an electrician if necessary.
6.
Cutting knife Respirator
Pencil Battery drill Scissors
Level Nail gun Tin shears
Rubber mallet Circular saw Pliers
Hammer Gloves Hole saw Ø 100 mm
Hand saw Safety goggles Jigsaw
PATIO L THERMO SAUNA

400
857
2407
690x1860 690x1860 690x1860
1920 1920
690x1860
1920350
2410
560 660
500
485 485
600
500
600
500
2350
3880
3960
4040
690x1860
1912
Floor plan
Cross section
WALL 2 (front)
WALL B (right)
WALL C (partition)
2
WALL A (left)
WALL 1 (back)
WALL 2 (front)
WALL 1 (back)
PATIO L THERMO SAUNA

VR-1
5x90 screws
45 mm gap for
VR-1 drainage detail
fasten at
an angle
fasten at
an angle
fasten at
an angle
fasten at
an angle
fasten at
an angle
fasten at
an angle
fasten at
an angle
fasten at
an angle
AR-2
AR-1
AR-1
AR-4
AR-4
AR-4
AR-4
AR-1
AR-1
AR-2A
WALL B (right)
WALL 2 (front)
WALL 1 (back)
WALL A (left)
X
Y
326 326 326 326 326
281326326326 281
AR-4
AR-3
AR-3
AR-3
AR-3
AR-5
1990
355
2345
3860
3950
416
22
1884
AR-2A
45
95
STEP 1 - Base frame
Scheme 1.1
Marking Detail Image Note Pcs.Length
AR-1 45x95 Base Frame 43860
AR-2 12345
AR-2A 45x95 Base Frame 12345
AR-3 45x95 Base Frame 41910
AR-4 51905
AR-5 11810
45x95 Base Frame
45x95 Base Frame
45x95 Base Frame
Cutout!
Check diagonals: X=Y
X= 4594 mm
Y= 4594 mm
Marking Detail Image Note Pcs.Length
for base frame 70
VR-1 12165Drainage detail
Screw 5x90
3
Connect the base frame details according to Scheme 1.1.
Make sure that the frame is level and that the diagonals are equal (X = Y). Leave a 45 mm gap between two
AR-1 base frame details so that the water drainage detail VR-1 can be fitted between them.
Use a level, a battery drill, and 5x90 screws to join the base frame together.
1.1
Place the VR-1 drainage detail on top of the base frame. The bottom of the detail must be inclined outward.
No fixings are needed.
Caution! The detail has sharp edges; use gloves.
1.2
PATIO L THERMO SAUNA

963410296
03B
610 45 610 45 610
49
72
96
485 2910
81
485
01D
49
560 700 660
55
03D
75
STEP 2 - Walls
Marking Detail Image Note Pcs.Length
01 40x138 Wall Log Thermo 183880
EXTRA 23880
01B 40x96 Wall Log Thermo 13880
40x138 Wall Log Thermo
Height: 96 mm
01C 40x34 Wall Log Thermo Height: 34 mm 13880
01D Cutout! 1388040x138 Wall Log Thermo
02 40x138 Wall Log Thermo 342350
02B
Height: 102 mm 2235040x102 Wall Log Thermo
03 11920
03B 40x96 Wall Log Thermo 11920
40x138 Wall Log Thermo
Height: 96 mm, Cutout!
03D 40x138 Wall Log Thermo 11920Cutout!
4
05 40x138 Wall Log Thermo 14660
06 40x138 Wall Log Thermo 14560
07 40x138 Wall Log Thermo 28485
Hitting Block 2
EXTRA 40x138 Wall Log Thermo 4485
P-1 45x45 Corner Post 42190
P-2 32120
Marking Detail Image Note Pcs.Length
for every wall log 350Screw 6x180
for P-1 and P-2 corner posts 400Screw 4.5x70
25Screw 4.5x70
45x45 Corner Post
AT-1 for corner post installation 12~180045x45 Temporary Support
for AT-1 temporary supports
PATIO L THERMO SAUNA

6x180 screws
03D
01
02
WALL
B (right)
WALL 2 (front)
WALL 1 (back)
WALL A (left)
WALL C (partition)
02
01D
1920
1920
1920
6x180 screws
fix this post last,
when all wall logs
are installed
4.5x70 screws
02
06
05
01
07
07
02
P-1
P-2
P-1
P-1
P-2
P-2
WALL B (right)
WALL 2 (front)
WALL 1 (back)
WALL A (left)
WALL C (partition)
P-1
AT-1
AT-1
AT-1
AT-1
AT-1
AT-1
AT-1
AT-1
AT-1
AT-1
1830
1830
AT-1
4.5x70 screws
6x180 screws
45 mm
STEP 2 - Walls
Scheme 2.1
5
5 mm
OUTSIDE INSIDE
Scheme 2.2
Place the first row of wall logs on the base frame according to Scheme 2.1. Make sure that the wall logs protrude
5 mm outward from the base frame on all sides. Use 6x180 screws to fix the wall logs to the base frame.
Suggestion: Pre-drill the holes for the screws to prevent wall logs from splitting.
2.1
Place the second row of wall logs on top of the first row. Use a hitting block and a rubber mallet to set the logs
in place. Attach the second row to the first using 6x180 screws and a battery drill.
Suggestion: Pre-drill the holes for the screws to prevent wall logs from splitting.
2.2
Install corner posts in the inner corners. Leave a 45 mm gap at the bottom, between the corner posts and
the base frame. Use 4.5x70 screws and a drill to fix the corner posts to every wall log (Scheme 2.2).
Suggestion: Pre-drill holes for the screws to prevent the posts from splitting.
2.3
Vertically level the corner posts and temporarily attach AT-1 details to them
for support and to keep the posts in a level position.
Use a level, 4.5x70 screws, and a battery drill.
2.4
PATIO L THERMO SAUNA

0
7
07
07
07
07
02
02
02
02
02
02
fix this post last,
when all wall logs
are installed
07
06
01
01
01
01
01
01
01
07
07
07
07
07
07
07
07
07
07
07
07
07
07
07
06
06
06
06
06
06
06
05
05
05
05
05
05
05
05
02
02
02
02
02
02
02
02
02
02
02
02
1830
02
02
02
02
01
fix every log with
6x180 screws
Scheme 2.3
6
STEP 2 - Walls
For installation of walls, see the placement of the wall logs on the
"Wall Layout" scheme on page 7.
Continue to install the wall logs on top of each other according to the "Wall Layout" scheme on page 7.
Use 6x180 screws to connect all wall logs to each other and 4.5x70 screws to fix all logs to corner posts,
like shown in Scheme 2.3.
2.5
Remove the AT-1 temporary support details after all wall logs have been installed.2.6
PATIO L THERMO SAUNA

021
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
02
02
02
02
02
02
02
02
02
02
02
02
02
02
02
02
02B
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
02
02
02
02
02
02
02
02
02
02
02
02
02
02
02B
03C1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
03
03B
05
0506
0506
0506
0506
0506
05
0506
0506
0506
0506
0506
0506
0506
Wall A (left)
Wall C (partition)
1875
2350
2312
2350
2312
2176
560 700 660
View from the outside
View from the anteroom
06
02
02
02
1920
01D
01
01C
0707
0707
0707
0707
0707
0707
0707
0707
0707
0707
0707
0707
0707
0707
04B
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
Window
690x1860
Wall 2 (front)
01
485 2910 485
2244
1869
2176
3880
View from the outside
3880
01
01
01
01
01
01
01
01
01
01
01
01
01
01
01B
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
01
01
Window
690x1860
Door
690x1860
Window
690x1860
Wall 1 (back)
View from the outside
Wall B (right)
View from the outside
06
Door
690x1860
WALL LAYOUT
7
* Connect all wall logs together using 6x180 screws.
* Connect all wall logs to corner posts using 4.5x70 screws
PATIO L THERMO SAUNA

T-5
T-5
T-5
T-4
Top side of the ceiling beam
must be flush with the wall
Corner posts can remain lower
than the upper edge of the wall
4.5x70 screws
T-5
STEP 3 - Roof boards and ceiling
Scheme 3.1
Marking Detail Image Note Pcs.Length
KL-1 24x120 Roof Board 36+22370
01F 13880
T-1 45x95 Ceiling Beam 13880
40x30 Roof Block
Marking Detail Image Note Pcs.Length
for fixing T-2 beams 4Joist Hanger
45x97
T-2 45x95 Ceiling Beam 23878
T-3 45x45 Ceiling Beam 13880
T-4 45x95 Ceiling Beam 11870
T-5 45x95 Ceiling Beam 31825
DI-2 15x55 Ceiling Distance Board 41915
SPU Insulation Panel
30x600x1200
11
DI-3 15x55 Ceiling Distance Board 11870
DI-4 15x55 Ceiling Distance Board 31825
STP-1 15x90 Ceiling Board 48+21915Thermo spruce
Screw 5x40 50 for joist hangers
Screw 4.5x70 100 for beams and distance boards
Screw 3.5x50 10 for 01F roof block
Nail 70 mm 300 for KL-1 roof boards
Lost-head nail 40 mm 200 for STP-1 ceiling boards
for SPU insulation panels 3Foil Tape 10 m
Attach the T-4 and T-5 beams to the front and back walls. Leave ~2 mm gap at both ends. Make sure that the
top side of the beam is flush with the upper edge of the front and back walls. Use 4.5x70 screws and a drill to fix
the beams to the walls (Scheme 3.1).
3.1
8
Corner Bracket 60x60x60 2 for T-1 beam
for supporting T-2 beams
if necessary
4Plastic wedge
90x32x15
PATIO L THERMO SAUNA

T-2
565 mm610 mm 565 mm
565 mm610 mm565 mm
T-2
5x40 screws flush with the
beam's end
T-2
marked line
565 mm
Temporarily placed KL-1 roof board or
another straight detail to mark the
installation height of T-2 beams.
Markings for distance
between T-2 beams
T-4
610 mm 565 mm
Marking for installation
height of T-2 beams
T-4
Install plastic wedges under
the T-2 ceiling beams so that
they support the roof boards.
Scheme 3.2
STEP 3 - Roof boards and ceiling
Temporarily lay one KL-1 roof board or some other straight detail on top of the front and back walls. Mark the diagonal
that forms under the detail on the side walls with a pencil. These markings will determine the installation height of the
T-2 ceiling beams. Measure out the distance from the T-4 and the T-5 beams and mark the locations on both side
walls, like shown in Scheme 3.2. These markings will indicate the spacing between the T-2 ceiling beams.
3.2
Scheme 3.3
Attach the joist hangers to the T-2 ceiling beams, flush with the beams ends. Use 5x40 screws.3.3
Install the T-2 ceiling beams through the cutouts in Wall C (partition). Fasten them to the side walls in the
previously marked location through the joist hangers, like shown in Scheme 3.3.
Use 5x40 screws to fix the joist hangers to the beams and the walls.
The T-2 beams should support the roof boards in the middle of the sauna. If necessary, raise the beams
higher from the cutouts in Wall C (partition) and position them to the correct height using plactic wedges.
3.4
9
T-2
3.3
3.4
T-2
PATIO L THERMO SAUNA

4.5x70
screws
4.5x70 screws
angle bracket
60x60x60
5x40 screws
T-1
T-3
marked line
for T-3
beam height
01F
5x90 screws
4.5x70 screws
T-1
T-3
01F
Cut the last roof board to width
Install roof bords flush
with the side walls
70 mm nails
KL-1 Roof Boards
start from the right wall
Scheme 3.4
STEP 3 - Roof boards and ceiling
Install the roof boards flush with the side walls, starting from the right. Fix the roof boards with 70 mm nails to
the beams (8 nails per every roof board) with a hammer or a nailgun. Cut the last roof board to width using a
circular saw.
3.5
When all the roof boards are installed, fasten the T-1 beam under them, flush with the roof boards at the front,
like shown in Scheme 3.5. Use 60x60 angle brackets and 5x40 screws for fixing.
3.6
3.7 Measure the distance from the roof boards to the bottom edge of the T-1 beam and mark it on Wall 2 (front).
That line will indicate the installation height of the T-3 beam. Fix the T-3 beam in place with 4.5x70 screws.
Scheme 3.5
Install the 01F roof block on top of the roof boards, flush with the front edge. Fix with 5x90 screws.3.8
10
PATIO L THERMO SAUNA

corner
cutout
corner
cutout
4.5x70 screws
SPU
insulation
panel
SPU
insulation
panel
SPU
insulation
panel
Apply foil tape to
all edges and joints
ANTEROOM
STEAMROOM
SPU
insulation
panels
4.5x70 screws
40 mm nails
corner
cutout
corner
cutout
STP-1 Ceiling Boards
STP-1
DI-2
DI-2
DI-4
DI-4
Leave ~3 mm gap
ANTEROOM
STEAMROOM
40 mm lost- head nails
Scheme 3.7
Scheme 3.6
Cut the SPU insulation panels to the right size using a cutting knife. Make cutouts in the corners for corner
posts. Attach the panels to the ceiling beams using a few 4.5x70 screws. Tape all edges and joints with
foil tape to prevent heat loss, like shown in Scheme 3.6.
Place the ceiling distance boards on top of the insulation panels and fasten them to the ceiling beams
using 4.5x70 screws.
Install the ceiling lining boards on top of the distance boards. Leave ~3 mm gap between the ceiling boards and
walls on all sides. Use 40 mm lost-head nails (4 per every ceiling board) and a hammer or nail gun for fixing.
Make corner cutouts in the first and last ceiling boards for corner posts with a hand saw, and cut the last ceiling
board to width using a circular saw (Scheme 3.7).
STEP 3 - Roof boards and ceiling
3.9
3.10
3.11
11
~3 mm gap
T-4 ceiling beam
SPU insulation
DI-3
STP-1
Wall log
PATIO L THERMO SAUNA

6 mm
slope veneer
3 mm
slope veneer
9 mm
slope veneer
12 mm
slope veneer
3 mm
slope veneer
3.5x50 screws
Leave ~3 mm gap
Floor slope
PL-3 Floor Boards
PL-1
Floor Boards
PL-2 Floor Boards
Floor slope
3.5x50 screws
Install the floor boards starting from the right. Leave ~3 mm gap between the floor boards and walls at
all sides. Cut the last floor board to width using a circular saw.
Use 3.5x50 screws to fix the floor boards in place (Scheme 4.2).
Scheme 4.2
Place the slope veneers on the base frame in the steam room to give the floor a slope for water drainage.
Fixing the details to the base frame with screws is optional (Scheme 4.1).
Scheme 4.1
STEP 4 - Floor
Marking Detail Image Note Pcs.Length
3 mm Floor slope veneer 21905
11905
9 mm Floor slope veneer 11905
PL-1 24x120 Floor Board 18+21910
6 mm Floor slope veneer
Marking Detail Image Note Pcs.Length
for floor boards 240Screw 3.5x50
12 mm Floor slope veneer 11905
PL-2 24x120 Floor Board 18+21495
PL-3 24x120 Floor Board 18+2385
4.1
4.2
12
~3 mm gap
12 mm
slope detail
Wall log
PL-1
Base frame
PATIO L THERMO SAUNA

4.5x70 screws
A-1 A-1 U-1 U-2
UR-1
UR-2
UR-1
Frame pre-installed
at the factory
UR-2 UR-2
A-1
UR-2
A-1 A-1 A-1U-1
Connect the door and windows together by attaching the UR-1 and UR-2 frame details around them. Attach the
UR-1 and UR-2 frames with 4.5x70 screws (Scheme 5.2). The U-2 interior door frame is pre-installed at the factory.
Attention! When installing the window, make sure that the inclined frame is located indoors, at the bottom of the
window. The bottom side is marked with a sticker.
Scheme 5.1
Marking Detail Image Note Pcs.Length
U-1 Metal + Metal door handle 1
A-1 Window 88x690x1860 3
UR-1 45x45 Door/ Window frame 21950
Glass Door 88x690x1860
Marking Detail Image Note Pcs.Length
Screw 4.5x70
U-2 Glass Door 88x690x1860 1 Metal + Wooden door handle
UR-2 45x45 Door/ Window Frame 41380
5.2
Scheme 5.2
04B Width: 120 mm 1186940x120 Partition Wall End Board
13
for door and window frames 100
5.1
STEP 5 - Doors and windows
Lift and tilt the doors and windows diagonally into the openings (Scheme 5.2). Place them to their positions from inside the
sauna. For easier installation, remove the glass from the door hinges to reduce the weight of the doors.
INCLINED WINDOW FRAME
AT THE BOTTOM
ON THE INSIDE
INCLINED WINDOW FRAME
AT THE BOTTOM
ON THE INSIDE
STIKKER AT THE BOTTOM STIKKER AT THE BOTTOM
PATIO L THERMO SAUNA

4.5x70 screws
04B
A-1 A-1 U-1 A-1
metal handle
on the outside
and the inside
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
Ventilation hole
2350
2312
600
2176
3960
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
Ventilation hole
Ventilation hole
1700
3660
Wall 1 (back)
View from the outside
Wall B (right)
View from the outside
BASE FRAME
300
325
BASE FRAME
2260
1885
15. ROW
3. ROW
2. ROW
1750
195
STEP 5 - Doors and windows
Scheme 5.3
14
Fix the door and window frames to Wall 2 (front) from the outside. Place and fix the 04B detail between the
windows and the door. Use 4.5x70 screws for fixing (Scheme 5.3).
5.4
Attach the glass doors back to the hinges and fix the handles to the doors. The set includes two different handles that look the
same but are made of different materials. Make sure that the outer door has a metal and metal handle and the inner door has
a metal and wooden handle. A wooden handle must be installed on the inner door facing the steam room so that it does not
heat up while using the sauna. The difference in material can be detected by sound (tap on the handles).
5.5
STEP 6 - Ventilation
U-2 Ventilation Valve Ø100 1 wood
U-3 Ventilation Grid Ø100 7 metal
Screw 3x40 Black 24
Marking Detail Image Note Pcs.Length
Cut the ventilation holes in the exterior walls with a diameter of 100 mm using a hole saw or a jigsaw.
For recommended locations of ventilation openings see Scheme 6.1
6.1
Scheme 6.1
PATIO L THERMO SAUNA

STEAM ROOM ANTEROOM
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
Wall C (partition)
Door 690x1860
1875
2176
View from the anteroom
1920
350
BASE FRAME
210
Ventilation hole 2. ROW
195
STEP 7 - Ventilation
I
Scheme 6.3
Cover the openings with ventilation grids or valves, as shown in Scheme 6.3. Use 3.5x40 black screws for fixing.6.3
I - EXHAUST OPENING
Install the metal ventilation grid on the outside and the
wooden valve on the inside.
The exhaust opening with the valve inside is located under
the ceiling, and its purpose is to dry the steam room after
using the sauna. The ventilation valve should be closed
while using the sauna. Open the valve after using the
sauna to expel excess moisture through the opening.
For faster drying, leave the steam room door ajar after a
sauna session.
The ventilation valve can also be opened between steam
sessions if there are many people in the steam room at the
same time and excessive humidity or a lack of air occurs.
II - INLET
Install a metal ventilation grid inside and outside.
III - OUTLET
Install a metal ventilation grid inside and outside.
III
II
II
Cut the ventilation holes in the partition wall with a diameter of 100 mm using a hole saw or a jigsaw.
For recommended locations of ventilation openings see Scheme 6.2
6.2
Scheme 6.2
15
PATIO L THERMO SAUNA

Moisture
safety tape
Moisture
safety tape
Moisture
safety tape
Moisture
safety tape
Cut the last lining
boards to width
DI-1
STP-2
STP-2
STP-2
DI-1
40 mm
lost- head nails
3x40 screws
Tape all corners of the sauna with moisture safety tape before installing exterior moldings to prevent moisture and
rainwater from entering the sauna (Scheme 7.1).
Scheme 7.1
7.1
Scheme 7.2
Measure the height of the protruding part of the side walls and cut the DI-1 distance boards to the correct length if
necessary. Attach the distance boards to the walls using 3x40 screws.
Install the STP-2 outer lining boards on top of the DI-1 distance boards and the beams, starting from the
bottom. Cut the last lining board to the correct width. Use 40 mm lost-head nails to fasten the lining boards
(2 nails per board). See Scheme 7.2.
7.2
7.3
16
STEP 7 - Outer lining and moldings
Marking Detail Image Note Pcs.Length
STP-2 14x121 Outer Lining Board 75+3350
L-2 18x95 Roof and Corner Molding 102400
Marking Detail Image Note Pcs.Length
L-1 18x95 Roof Molding 24000Cut to length!
UL-1 18x95 Door Molding 13110
DI-1 4215015x55 Distance Board for Outer Lining
Cut to length!
UL-2 18x95 Door Molding 12870
UL-3 18x95 Door Molding 21925
UL-4 18x145 Door Molding 11830
UL-5 12x42 Door Molding 2~2200
for outer lining boards 150Lost- head nail 40 mm
for all corners 1Moisture safety tape 10 m
for distance boards and moldings 200Screw 3.5x40 Black
EXTRA 18x95 Roof Molding 14000
1Teknos Aqua Primer - Black
Cut to length!
PATIO L THERMO SAUNA

Cut to
length
Cut to
length
Cut to
length
Cut to
length
Cut to
length
Cut to
length
Cut to
length
L-1
L-1
L-2
L-2
L-2
UL-3
UL-5
UL-4
UL-3
UL-1
UL-2
WALL 2 (front)
UL-5
L-2
L-2
Corner
cutout
Corner
cutout
Cut to
length
Cut to
length
Cut to
length
L-2
L-2
L-2
L-2
L-2
WALL 1 (back)
10
10
8
28
20
10
1830
3110
821 35 10
20
10
10
2870
1925
STEP 7 - Outer lining and moldings
First, fix the L-2 roof moldings to the side walls. The moldings must be installed flush with the upper edges of the
side walls. Cut the moldings to length and fasten using 3x40 black screws.
Scheme 7.3
Make corner cutouts in L-2 corner moldings, as marked in Scheme 7.3. Cut to length and use 3x40 black screws to
fasten all the corner moldings.
7.4
7.6
Next, measure and cut to length the L-1 roof moldings at the front and fasten them to the roof block and T-1 beam.7.5
17
Install the moldings around the door and windows using 3x40 black screws.
For the correct overlay, see Scheme 7.4.
7.7
7.8
Scheme 7.4
Paint over all cut ends of the moldings with black Teknos Aqua Primer.
Scan the QR code for more detailed product information.
PATIO L THERMO SAUNA

Adjust side frame height
with adjustable legs
4.5x70 screws
WALL A (left)
Measure the length of the sauna bench
and mark the position of the side frame.
STEAM ROOM
WALL 1 (back)
465 mm
515 mm
420 mm
658 mm
515 mm142 mm
617 mm
931 mm
465 mm434 mm
515 mm
372
829
515
42045
45
412
STEP 8 - Sauna benches
Marking Detail Image Note Pcs.Length
Bench Module 600 mm 11793
Bench Module 500 mm 11320
Top - Wall A (left)
Marking Detail Image Note Pcs.Length
Bench Module 500 mm 11793Bottom - Wall A (left)
Bench Module 600 mm 1937
Top - Wall 1 (back)
Bottom - Wall 1 (back)
Bench Horizontal Support Set 45x45 1
Bench Side Frame 1Includes 3 adjustable legs
Extra Vertical Support 1 Includes 1 adjustable legs
for all supports 50Screw 4.5x70
Bench Module 500 mm 11911Anteroom
18
Measure the length of the sauna bench and mark the location of the side frame. Adjust the height of the side
frame through the adjustable legs. Fix the frame to Wall A (left) using 4.5x70 screws, like shown in Scheme 8.1.
8.1
Scheme 8.1
Bench Skirt 11793
Scheme 8.2
Measure the distance and fix the upper and lower bench supports to the walls in the steam room, according to
Scheme 8.2. Use 4.5x70 screws for fixing.
It is recommended to additionally use glue (not included) for fixing the sauna bench supports to the wall.
View from the front: View from the side:
8.2
PATIO L THERMO SAUNA

ANTEROOM
WALL 1 (back)
515 mm
420 mm
658 mm
657 mm
465 mm
4x70 screws
4x70 screws
4x70 screws
Leave 8 mm gap between
the lower bench and the skirt
Bench skirts side frame
Bench skirt middle frame
Bench skirt middle frame
8 mm
422
45 420
STEP 8 - Sauna benches
19
View from the front: View from the side:
Measure the distance and fix the bench supports to the walls in the anteroom, according to Scheme 8.4.
Use 4.5x70 screws for fixing.
It is recommended to additionally use glue (not included) for fixing the sauna bench supports to the wall.
8.5
Scheme 8.4
8.3
Set the bench skirt in place. Leave a 8 mm gap between the skirt and the lower bench. Fix the skirt side frames to the side walls
and the middle frame to the bottom bench, using 4x70 screws. See Scheme 8.3
8.4
Lift and place the bottom benches on top of the supports. If LED lighting under the sauna benches has been ordered
additionally (not included in the standard set), install the LED strips under the benches before placing them on top of the
supports. More detailed instructions are included with the lighting details.
Scheme 8.3
PATIO L THERMO SAUNA
Table of contents
Popular Plumbing Product manuals by other brands

SFA
SFA SANIACCESS 1 installation instructions

Officine Gullo
Officine Gullo ACUTAOG05 L Instructions for installation and use

Peerless Faucet
Peerless Faucet P46LF-M installation instructions

Olympia
Olympia L-7240 Installation and Maintenance

Helvex
Helvex IG-40 installation guide

Sanela
Sanela SLP 49RS Instructions for use

Laufen
Laufen ILBAGNOALESSI One 8.1197.2 Installation

DURAVIT
DURAVIT Sensor 1 SE1090007 Instructions for mounting and use

Acorn Safety
Acorn Safety S0706 Installation, operation and maintenance instructions

American Standard
American Standard Silhouette 7179.011 Specification sheet

Brizo
Brizo R62707 manual

Aria
Aria QL103 owner's manual