Trinity Highway QuadGuard M Wide User manual


QuadGuard
®
is a registered trademark of Energy Absorption Systems, Inc. Part No. 626824
© 2021 Trinity Highway Products, LLC
TrinityHighway.com 1 Revision D March 2021
QuadGuard® M Wide
The QuadGuard
®
M Wide has been tested pursuant to American Association of State Highway and
Transportation Officials (“AASHTO”) Manual for Assessing Safety Hardware (“MASH”)
specifications. The Federal Highway Administration (“FHWA”) has determined that the QuadGuard
®
M Wide is eligible for Federal-aid reimbursement on the National Highway System.
Product Description
Assembly Manual
15601 Dallas Parkway
Suite 525
Addison, Texas 75001
Warning:
The local highway authority, distributors, owners, contractors,
lessors, and lessees are RESPONSIBLE for the assembly, maintenance, and
repair of the QuadGuard
®
M Wide. Failure to fulfill these RESPONSIBILITIES
with respect to the assembly, maintenance, and repair of the QuadGuard
®
M
Wide could result in serious injury or death.
Important:
These instructions are for standard assembly specified by the
appropriate highway authority. In the event the specified system assembly,
maintenance, or repair would require a deviation from standard assembly
parameters, contact a Trinity Highway representative. This system has been
deemed eligible for reimbursement by the FHWA on the National Highway System
under strict criteria utilized by that agency.
This manual must be available to the worker overseeing and/or assembling the product at
all times. For additional copies, contact Trinity Highway directly at (888) 323-6374 or visit
TrinityHighway.com.
The instructions contained in this manual supersede all previous versions. The instructions,
illustrations, and specifications are based on the latest QuadGuard
®
M Wide information available
to Trinity Highway at publication. We reserve the right to make changes at any time. Please visit
TrinityHighway.com/Product/ to confirm the latest revision.

TrinityHighway.com 2 Revision D March 2021
Table of Contents
Customer Service Contacts .......................................................................................................... 3
Important Introductory Notes ........................................................................................................ 3
Safety Symbols ............................................................................................................................. 4
Safety Rules for Assembly ............................................................................................................ 4
Limitations and Warnings .............................................................................................................. 5
System Overview .......................................................................................................................... 6
Inspect Shipping...................................................................................................................... 6
System Components ............................................................................................................... 7
Determine Transition Type .................................................................................................... 1 2
Recommended Tools .................................................................................................................. 13
Site Preparation/Foundation ....................................................................................................... 15
Foundation/Anchoring ........................................................................................................... 16
Trinity Highway Approved Adhesive Anchoring System ............................................................. 17
Vertical Anchors .................................................................................................................... 17
Anchor Assembly Cautions ................................................................................................... 18
Horizontal Anchors ................................................................................................................ 19
System Assembly ....................................................................................................................... 22
QuadGuard® M Wide Final Inspection Checklist ......................................................................... 36
Maintenance and Repair ............................................................................................................. 37
Inspection Frequency ............................................................................................................ 37
Visual Drive-By Inspection .................................................................................................... 37
Walk-Up Inspection Checklist ............................................................................................... 37
Post-Impact Instructions ........................................................................................................ 38
Parts Ordering Procedure ........................................................................................................... 40
Drawings ..................................................................................................................................... 42
QuadGuard® M Wide Tension Strut Backup QFMTSCVR-U ............................................. 42
Concrete Pad618686 ......................................................................................................... 43
TS Concrete Pad 8” w/Rebar618686 ................................................................................ 44
TS Concrete Pad 8” wo/Rebar618686 .............................................................................. 45
Tension Strut Backup 627528 ........................................................................................... 46
Monorail Assembly625637 ................................................................................................ 47
Diaphragm Assembly 627534 ........................................................................................... 48
Shim Kit627518 ............................................................................................................... 51
Fender Panel Assembly608241 ........................................................................................ 52
Nose Assembly 627522 ..................................................................................................... 53
End Shoe Transition 627729 ............................................................................................. 54
31” W-Beam Guardrail TransitionQFMTSCVR-TWLR ...................................................... 55
Thrie-Beam TransitionQFMTSCVR-TTLR ......................................................................... 56
Safety Shape Barrier Transition QFMTSCVR-T4LRF ....................................................... 57
Single Slope TransitionQFMTSCVR-T6LRF ..................................................................... 58
QuadGuard M Wide TS w/BlockQFMTSCVR-UVB ........................................................... 59
Vertical Barrier Transition QFMTSCVR-ESLR .................................................................. 60
TS Concrete Pad w/Block QFMTSCVR-UVB .................................................................... 61

TrinityHighway.com 3 Revision D March 2021
Customer Service Contacts
Trinity Highway is committed to the highest level of customer service. Feedback regarding the
QuadGuard
®
M Wide, its assembly procedures, supporting documentation, and performance is
always welcome. Additional information can be obtained from the contact information below:
Trinity Highway
Telephone (888) 323-6374 (USA)
+1 312 467-6750 (International)
Contact Link TrinityHighway.com/Contact
Important Introductory Notes
Proper assembly of the QuadGuard
®
M Wide is critical to achieve performance. The QuadGuard
®
M Wide has been deemed eligible by the FHWA per MASH criteria. These instructions should be
read in their entirety and understood before assembling the QuadGuard
®
M Wide. These
instructions are to be used in conjunction with the assembly of QuadGuard
®
M Wide and are for
standard assemblies only as specified by the applicable highway authority. If you need additional
information, or have questions about the QuadGuard
®
M Wide, please contact the highway
authority that has planned and specified this assembly and, if needed, contact Trinity Highway’s
Customer Service Department. This product must be assembled in the location specified by the
appropriate highway authority. If there are deviations, alterations, or departures from the
assembly protocol specified in this manual, the device may not perform as tested.
Important:
DO NOT use any component part that has not been specifically
specified herein for the QuadGuard
®
M Wide during the assembly or repair of this
system (pp. 7 – 11 / 40 - 41).
This product has been specified for use by the appropriate highway authority and has been
provided to that user who has unique knowledge of how this system is to be assembled. No
person should be permitted to assist in the assembly, maintenance, or repair of this system that
does not possess the unique knowledge described herein. These instructions are intended for
an individual qualified to both read and accurately interpret them as written. These instructions
are intended only for an individual experienced and skilled in the assembly of highway products
that are specified and selected by the highway authority.
A Manufacturer’s Drawing Package will be supplied by Trinity Highway upon request. Each
system will be supplied with a specific drawing package unique to that system. Such drawings
take precedence over information in this manual and shall be studied thoroughly by a qualified
individual who is skilled in interpreting them before the start of any product assembly.

TrinityHighway.com 4 Revision D March 2021
Safety Symbols
This section describes the safety symbols that appear in this QuadGuard
®
M Wide manual. Read
the manual for complete safety and assembly information.
Symbol Meaning
Safety Alert Symbol:
Indicates Important, Caution, Warning, or Danger. Failure
to read and follow the Important, Caution, Warning, or Danger indicators could
result in serious injury or death to workers and/or bystanders.
Warning:
Read safety instructions thoroughly and follow the assembly directions
and suggested safe practices before assembling, maintaining, or repairing the
QuadGuard
®
M Wide. It is the responsibility of the installer to follow the instructions
contained in this manual. Failure to comply with these warnings could result in
increased risk of serious injury of death in the event of a vehicle impact.
Important:
Please keep up-to-date instructions for later use and reference by
anyone involved in the assembly of the product.
Safety Rules for Assembly
* Important Safety Instructions *
This manual must be kept in a location where it is readily available to persons who are skilled and
experienced in the assembly, maintenance, or repair of the QuadGuard
®
M Wide. Additional
copies of this manual are available from Trinity Highway by calling (888) 323-6374 or by visiting
TrinityHighway.com/Product/. Please contact Trinity Highway if you have any questions
concerning the information in this manual or about the QuadGuard
®
M Wide.
It is the responsibility of the installer to use appropriate safety precautions when operating power
equipment, mixing chemicals, and when moving heavy equipment or QuadGuard
®
M Wide
components. Safety articles including but not necessarily limited to work gloves, eye protection,
safety-toe shoes, and back protection should be used.
Warning:
It is the responsibility of the installer to use all safety measures
incorporating appropriate traffic control devices specified by the highway authority.
These measures must be used to protect all personnel while at the assembly,
maintenance, or repair site.
Warning:
Failure to comply with these warnings could result in increased risk of
serious injury or death in the event of a vehicle impact.
Warning:
Use only Trinity Highway parts on the QuadGuard
®
M Wide for
assembly, maintenance, or repair. The use of component parts not specified herein
is strictly prohibited. A QuadGuard
®
M Wide using parts other than those
specified herein has not been tested. Failure to follow this warning could result in
increased risk of serious injury or death in the event of a vehicle impact.

TrinityHighway.com 5 Revision D March 2021
Limitations and Warnings
Trinity Highway contracts with independent crash testing facilities to test and prepare a crash test
report for FHWA review.
The QuadGuard® M Wide has been deemed eligible for reimbursement by the FHWA per
AASHTO requirements and guidelines of MASH. These tests evaluate product performance
defined by AASHTO involving lightweight cars (approx. 2420 lb. [1100 kg]) and full size pickup
trucks (approx. 5000 lb. [2270 kg]). A product can be certified for multiple Test Levels. The
QuadGuard® M Wide is certified to the Test Level(s) as shown below:
Test Level 3: 62 mph [100 kph]
These AASHTO directed tests are not intended to represent the performance of systems
when impacted by every vehicle type or every impact condition existing on the roadway.
This system is tested only to the test matrix criteria of MASH as approved by FHWA.
Trinity Highway expressly disclaims any warranty or liability for injury or damage to persons or
property resulting from any impact, collision or harmful contact with products, other vehicles, or
nearby hazards or objects by any vehicle, object or person, whether or not the products were
assembled in consultation with Trinity Highway or by third parties.
The QuadGuard® M Wide is intended to be assembled, delineated, and maintained within specific
state and federal guidelines. It is important for the highway authority specifying the use of a
highway product to select the most appropriate product configuration for site specifications. The
customer should be careful to properly select, assemble, and maintain the product. Careful
evaluation of site layout, traffic speed/type, direction, and visibility are some of the elements that
require evaluation by the highway authority in the selection of a highway product. For example,
curbs could cause an untested effect on an impacting vehicle.
After an impact occurs, the debris from the impact should be removed from the area immediately
and the specified highway product should be evaluated and restored to its original specified
condition or replaced as the highway authority determines as soon as possible.
Warning: Do not assemble, maintain, or repair the QuadGuard® M Wide until you
have read this manual thoroughly and completely understand it. Please contact
Trinity Highway if you do not understand these instructions (p. 3).
Warning: It is the responsibility of the installer to ensure that all Danger, Warning,
Caution, and Important statements within the QuadGuard® M Wide manual are
completely followed. Failure to follow this warning could result in serious injury or
death in the event of a collision.

TrinityHighway.com 6 Revision D March 2021
System Overview
The QuadGuard® M Wide is a re-directive, non-gating crash cushion for roadside features of
69” [1753 mm] or less in width with use of approved transitions. It consists of energy-absorbing
cartridges surrounded by a framework of Quad-Beam Fender Panels.
Important: Trinity Highway makes no recommendation whether use or
reuse of any part of the system is appropriate or acceptable following an
impact. It is the sole responsibility of the project engineer and/or the local
highway authority and its engineers to make that determination. It is critical
that you inspect this product after assembly is complete to make certain that
the instructions provided in this manual have been strictly followed.
The QuadGuard® M Wide utilizes two types of cartridges in a “staged” configuration that are
designed and tested to address vehicles as defined by MASH for both lighter cars and heavier,
high center-of-gravity vehicles.
Impact Performance
The six (6) Bay QuadGuard® M Wide has successfully passed the requirements stipulated in
MASH with both the light car and pickup trucks at speeds of up to 62 mph [100 kph] at redirection
angles up to 25 degrees.
During head-on impact testing, within MASH criteria, the QuadGuard® M Wide has been shown
to telescope rearward to absorb the energy of impact. When impacted from the side, within the
applicable MASH criteria, it has been shown to redirect the vehicle back toward its original travel
path and away from the highway feature.
Warning: It is the sole responsibility of the project engineer and/or local highway
authority and its engineer to ensure that the QuadGuard® M Wide and delineation
used meet all federal, state, specifying agency, and local specifications.
Warning: It is the sole responsibility of the project engineer and/or local highway
authority and its engineer to ensure that the QuadGuard® M Wide meets all
appropriate Manual on Uniform Traffic Control Devices (“MUTCD”) and local
standards.
Inspect Shipping
Check the received parts against the shipping list supplied with the system before deploying the
QuadGuard® M Wide. Make sure all parts have been received (pp. 40 - 41).
Important: The Manufacturer’s Drawing Package supplied with the QuadGuard®
M Wide must be used with these instructions for proper assembly and should take
precedence over these general instructions.
Warning: Do NOT modify the QuadGuard® M Wide in any way.

TrinityHighway.com 7 Revision D March 2021
System Components
Below is a list of system components that may be used in your particular QuadGuard
®
M Wide
configuration. Verify parts delivered and system details with the BOM (Bill of Materials) and
system drawings shipped with your system. Please call Trinity Highway if you have any system
questions (p. 3).
Note:
Components are not shown to scale.
Tension Strut Backup 69” Diaphragms 2 - 6 Diaphragm #1
627511 Varies 627532
Fender Panel Side Panel, Wide Bracket, Cartridge Support
TS B/U
611832 611900 605447
End Cap, Monorail Bracket, Cartridge Support Locking Bar, Cartridge
Support
608136 605446 611266

TrinityHighway.com 8 Revision D March 2021
Monorail Guide Monorail, 2 Bays, QG, G Monorail, 3 Bays, QG, G
611368 611375 611379
Hinge Plate, Fender Panel Hinge Plate, Full Length Hinge Pin, Dia, Full Length
610172 627524 627525
Tel ST 1 3/4X1 3/4X12 GAX10
Tel ST 2X2X12 GAX10 Pipe, 3/4 Schedule 80X2 5/16
615756 615765 626819
Shim, 12GAX3 5/8X8 Bracket, Angle, 2X1, W/Holes Bracket, Pull-Out
614062 626817 605535

TrinityHighway.com 9 Revision D March 2021
Bracket, Cart, Hold Down Bracket, Cart Support, Nose Washer, Bar, 10GAX2X14
626815 626816 626818
Nose, L, QG M Wide Nose, R, QG M Wide
627513 627514
Bolt, Hex, 1/4X3/4, G5 Bolt, Hex, 1/4X1, G5 Bolt, Hex,3/8X1,G5
113518 113508 113596
Bolt, Hex, 3/8X3 1/2, G5 Bolt, Hex, 5/8X2, G5 Bolt, Hex, 5/8X3 1/2, G5
113612 118570 113660

TrinityHighway.com 10 Revision D March 2021
Bolt, Hex, 5/8X4, G5 Bolt, Hex, 5/8X5, G8, P, F/T Flat Screw 5/8X8 1/2,G8
113666 119163 116879
Bolt, Hex, 3/4X2, G8 Rail Bolt, 5/8X2 Stud, 3/4X7, G5
113555 003400 117542
Nut, Hex, 1/4 Nut, Hex, 3/8 Rail Nut, Hex, 5/8
115946 115960 003340
Nut, Hex, 5/8 Nut, Heavy Hex, 3/4 Washer, Lock 3/8 G
003354 003704 118092
Washer, Lock, 5/8 Washer, Lock, 3/4 Washer, Flat 3/8X1
118100 118089 118036

TrinityHighway.com 11 Revision D March 2021
Washer, Fender, 3/8X2 Washer, Flat, 5/8X1 3/4 Washer, Flat, 3/4X2,Hvy
118038 003300 118027
Die Spring, 1 1/2 ODX3/4X6 Mushroom Washer Approved Adhesive
117458 617045 118710
Cartridge Assy, Type I Cartridge Assy, Type II
606027 606029

TrinityHighway.com 12 Revision D March 2021
Determine Transition Type
Note:
A proper Transition Panel or Side Panel must be used on each side of the Backup. A Side
Panel is not needed when a Transition Panel is used. Several types of transitions are available
for use with the QuadGuard M Wide (Figures 1 – 7). The correct Panel(s) to use will depend on
the direction of traffic and what type of barrier or road feature the QuadGuard
®
M Wide is shielding.
Contact Customer Service prior to deployment if you have any questions (p. 3).
Important:
The QuadGuard M Wide is available with transitions to concrete
barrier, guardrail, and other roadside features. Contact Customer Service for any
transition questions (p. 3).
Figure 1
No Transition
(Unidirectional only)
Figure 4
Single Slope Barrier, 6” Offset
Figure 3
Safety Shape Barrier, 4” Offset
Figure 6
Vertical Wall
Figure 5
Quad to Thrie-Beam Guardrail
Figure 2
Vertical Wall No Transition
(
Unidirectional onl
y)

TrinityHighway.com 13 Revision D March 2021
Recommended Tools
Documentation
Manufacturer’s Assembly Manual
Manufacturer’s Drawing Package
Personal Protective equipment
Eye Protection
Gloves
Safety-toe Shoes
Protective Clothing
Reflective Vest
Cutting equipment
Rotary Hammer Drill
Rebar cutting bit
Concrete drill bits – 7/8” [22 mm] (Double-Fluted)
Grinder, Hacksaw or Torch (optional)
Important:
Trinity Highway recommends using double-fluted drill bits to achieve
optimum tensile strength when applying an approved adhesive anchoring system
(p. 17).
Figure 7
Quad to W-Beam Guardrail

TrinityHighway.com 14 Revision D March 2021
Hammers
Sledgehammer
Standard hammer
Wrenches
Heavy duty 1/2” drive impact wrench
1/2" drive sockets: 7/16”, 9/16”, 15/16”, 1 1/16”, 1 1/8”, 1 1/4”
1/2" drive Deep well sockets: 15/16”, 1 1/4”
1/2" drive Ratchet and attachments
1/2" drive Breaker bar – 24” long
1/2" drive Torque wrench: 200 ft-lb
Combination wrench(s): 7/16”,9/16”, 15/16”, 1 1/8”
Hex Key (Allen) wrench: 3/8”
Important: Trinity Highway makes no recommendation whether use or
reuse of any part of the system is appropriate or acceptable following an
impact. It is the sole responsibility of the project engineer and/or the local
highway authority and its engineers to make that determination. It is critical
that you inspect this product after assembly is complete to make certain that
the instructions provided in this manual have been strictly followed.
Miscellaneous
Traffic control equipment
Lifting and moving equipment (A lifting device is preferred although a forklift can be used.)
Minimum 5,000 lb. capacity required.
Air Compressor (100 psi minimum) and Generator (5 kW)
Long pry bar
Drift pin 12” [300 mm]
Center punch
Tape measure 25’ [7.5 m]
Chalk line
Concrete marking pencil
Steel bristled tube brush for cleaning 7/8” drilled boreholes
Rags, water, and solvent for touch-up
Note: The provided list of tools is a general recommendation and should not be
considered an extensive list. Depending on specific site conditions and the complexity of
the assembly specified by the appropriate highway authority, the required tools may vary.
Decisions as to what tools are needed to perform the job are entirely the responsibility of
the specifying highway authority and the authority’s selected contractor performing the
assembly of the system at the authority’s specified assembly site.

TrinityHighway.com 15 Revision D March 2021
Site Preparation/Foundation
A QuadGuard
®
M Wide, for permanent applications, should be assembled on an existing or freshly
placed and cured concrete base (28 MPa [4000 psi] minimum). Location and orientation of the
concrete base and attenuator must comply with project plans or as otherwise determined by the
local highway authority.
Recommended dimension and reinforcement specifications for new concrete foundations are
provided in Trinity Highway concrete foundation drawings, supplied with the system. The system
may also be assembled on reinforced or non-reinforced concrete roadway (minimum 8” [200 mm]
thick). Deployment cross-slope shall not exceed 8% and should not twist more than 2% over the
length of the system; the foundation surface shall have a light broom finish.
Warning:
It is the responsibility of the installer to ensure proper site grading for
the QuadGuard
®
M Wide
placement as dictated by the state or specifying agency
pursuant to the AASHTO Roadside Design Guide.
Caution:
Accurate placement of all steel rebar is critical to avoid interference with
the concrete anchor bolts.
Warning:
Location of the Backup in relation to nearby objects will affect the
operation of the attenuator. Upon impact, the Fender Panels telescope rearward
and extend beyond the rigid Backup as much as 30” [762 mm]. Position the Backup
so that the rear ends of the last Fender Panels are a minimum of 30” [762 mm]
forward of objects that would otherwise interfere with movement of the rearmost
Fender Panels. Failure to comply with this requirement is likely to result in system
performance which has not been crash tested pursuant to MASH criteria and may
also cause component damage which will necessitate maintenance or
replacement of the system.
Important:
QuadGuard
®
M Wide cannot be mounted on asphalt.
Figure 8
Cross-Slope
8% (5
○
) (12:1)
MAXIMUM
LEVELING PAD
(SHOWN EXAGGERATED
FOR CLARITY)

TrinityHighway.com 16 Revision D March 2021
Foundation/Anchoring
Important: It is the responsibility of the local DOT or appropriate highway
authority to ensure that this assembly conforms to the AASHTO Roadside Design
Guide.
Warning: It is the responsibility of the installer to ensure that your assembly
procedure meets all appropriate Occupational Safety and Health Administration
(“OSHA”) and local standards.
Concrete Installations
For concrete installations, the QuadGuard® M Wide should be installed only on an existing or
freshly placed and cured concrete base (4000 psi [28 MPa] minimum). Orientation of the concrete
base and the attenuator must comply with the project plans or as otherwise determined by the
resident project engineer or appropriate highway authority.
Recommended dimension and reinforcement specifications for new concrete pads can be found
on the standard drawings.
The QuadGuard® M Wide may be installed on any of the following foundations using the specified
anchorage:
Foundation A: Reinforced Concrete Pad or Roadway
Foundation: 6” [152 mm] (reinforced) with Anchor Block minimum thickness P.C.C.
Anchorage: Approved adhesive with 7” [178 mm] studs 5 1/2” [140 mm] embedment
Foundation B: Reinforced or Non-Reinforced Concrete Pad or Roadway
Foundation: 8” [203 mm] minimum thickness P.C.C.
Important: To prevent sliding during impact, the pad must be placed against or
tied to an existing structure. Additional below grade supports may also be
necessary as the project engineer directs.
Anchorage: Approved adhesive with 7” [178 mm] studs 5 1/2” [140 mm] embedment

TrinityHighway.com 17 Revision D March 2021
Trinity Highway Approved Adhesive Anchoring System
A Trinity Highway approved adhesive anchoring system is required to securely anchor crash
cushions. Each approved adhesive kit contains adhesive, studs, nuts and washers. Both vertical
and horizontal assemblies are possible using an approved adhesive anchoring system.
Vertical Anchors
Note: Read all Trinity Highway approved adhesive instructions before starting.
1) Prepare the Concrete Foundation
Warning: Do not allow anchoring adhesive to contact skin or eyes. See material
safety data sheet supplied with adhesive kit for first-aid procedures. Use only in
well-ventilated area. Do not use near open flame.
Warning: It is the responsibility of the installer to maintain a safe work area
including the use of standard work zone safety equipment & PPE: gloves, safety-
toe shoes, and eye / ear protection.
The anchor bolts (studs) that anchor the QuadGuard® M Wide Backup and/or Monorail
sections to the concrete foundation must be those shipped in the kit or of high strength steel
(120,000 psi [830 MPa] minimum tensile strength or equal). These studs must be set in
minimum 4000 psi [28 MPa] concrete. Allow the concrete to cure a minimum of seven days
before applying anchoring adhesive.
2) Drill Boreholes
Caution: It is the responsibility of the installer to consult OSHA silica
respiratory standard 29 CFR 1910.134 for debris removal from borehole(s)
and use Trinity Highway approved adhesive to achieve optimum tensile
strength. Do not use diamond drill bits for drilling boreholes.
Use the Monorail(s) and Tension Strut Backup as drilling templates. Use a rotary hammer drill
to drill the boreholes 7/8” [22 mm] diameter to the recommended depth. See the approved
adhesive instructions provided with adhesive kit. Check ensure each borehole is drilled to the
proper depth and aligned with the part to be anchored per Anchoring Information table.
Anchoring Information
Stud Size: Orientation Bit Size Minimum Depth Torque Medium
3/4”X7" Vertical 7/8” [22 mm] 5 3/4” [145 mm] Adhesive
Manufacturer Spec Concrete
3) Clean the Boreholes
Blow the concrete dust from the borehole using oil-free compressed air. Thoroughly brush it
with a 7/8” diameter steel bristle tube brush and then blow it out again. If the borehole is wet,
completely flush it with water while brushing and then blow it clean to remove all water using
oil-free compressed air.
Note: Use of the Trinity Highway approved vacuum drilling equipment is authorized to replace
the blowing and brushing requirement of Step 3.

TrinityHighway.com 18 Revision D March 2021
4) Apply Approved Adhesive
Fill the borehole 100% full.
Caution: Fill borehole 100% full so it is even with the pavement surface per
manufacturer’s instructions.
5) Add the Washers and Nuts
Place a flat washer onto the stud then thread a nut on until the end of
the stud is flush with the nut (Figure 9).
6) Insert Studs in Boreholes and Wait for Adhesive to Cure
Push the stud down through the part to be anchored and into the
borehole.
Caution: Do not disturb or load the stud until the approved
adhesive material has fully cured (reference instructions
supplied with the approved adhesive kit).
7) Torque the Nuts
Once the adhesive has fully cured, torque the nut to the adhesive
manufacturer’s recommended values.
Anchor Assembly Cautions
1) Steel rebar
If steel rebar is encountered while drilling an anchor bolt borehole, apply one of the following
solutions:
A) Use a rebar drill bit for the rebar only and then switch back to the concrete bit to finish
drilling into the underlying concrete until the proper borehole depth is reached.
Caution: Do not drill through rebar without first obtaining permission to do so
from the project engineer.
B) Drill a new borehole down at an angle past the rebar to the proper depth. Anchor the
stud by completely filling both boreholes with an approved adhesive.
Figure 9
Vertical Application
(Before Applied Torque)

TrinityHighway.com 19 Revision D March 2021
Horizontal Anchors
The horizontal approved adhesive kit is the same as the vertical kit.
Caution:
Fill borehole 100% full so it is even with the vertical concrete surface
per manufacturer’s instructions.
1) Follow the instructions supplied with your approved adhesive kit
Apply approved adhesive to each anchor per instructions.
2) Add the Washers and Nuts
Put washer and nut on stud so the nut is flush with end of stud.
3) Insert each Stud with Washer and Nut into Borehole
Push stud with washer and nut into borehole.
Important:
The stud should be flush with the top of the nut in both vertical and
horizontal applications prior to tightening (Figure 10).
Caution:
Do not disturb or load the stud until the approved adhesive material has
hardened (reference approved adhesive kit instructions for hardening times).
4) Torque the nuts
Once the adhesive has fully cured, torque nut(s) to the approved adhesive manufacturing
specification.
Figure 10
Horizontal Application
(Before Applied Torque)
CORRECT
INCORRECT
This manual suits for next models
1
Table of contents