Installation
1. Before installing MultiDOT, fully install BCM and
ensure it is connected to the internet.
(Both the LEDs on BCM should be on and not ashing)
2. Scan the QR code on BCM to enter the app.
(Or navigate to app.vericon.co.uk and input the BCM’s serial number)
3. Scroll across the tabs to locate the “Devices”
tab.
4. Click “Install New Device”.
5. Input MultiDOT’s serial number.
6. Follow the on-screen instructions.
7. Remove the battery pull tab.
Installation
8. When the app asks, hold down the join button
inside MultiDOT until the LED begins
to ash (around 5 seconds).
9. Once the app shows that MultiDOT is
connected, hold MultiDOT in the desired
location and press the join button. Ensure the
LED comes on and does not ash. If the LED
ashes, refer to the troubleshooting steps.
10. Attach the backplate to the wall or back box.
11. Clip MultiDOT to the backplate.
Where should MultiDOT be situated?
MultiDOT should be placed near any areas which
have an issue with mould, damp or condensation.
Why does the LED ash after joining when the join
button is pressed?
MultiDOT may be too far away to connect to
BCM. Bring MultiDOT closer to the BCM and press
the button again to make the LED come on and
not ash. Retry the original desired location, if it
still does not work, nd an alternative location.
For more troubleshooting, please visit our website
FAQ and Troubleshooting