Vertiv SmartRow DCX User manual

Vertiv™ SmartRow™ DCX
Installation Manual

(Undefined variable: Lg_3phase.1 - Company Name) | (Undefined variable: Lg_3phase.5 - Document Name)
Technical Support Site
If you encounter any installation or operational issues with your product, check the pertinent section of this
manual to see if the issue can be resolved by following outlined procedures.
Visit https://www.Vertiv.com/en-us/support/ for additional assistance.
The information contained in this document is subject to change without notice
and may not be suitable for all applications. While every precaution has been
taken to ensure the accuracy and completeness of this document, Vertiv
assumes no responsibility and disclaims all liability for damages resulting from
use of this information or for any errors or omissions. Refer to other local
practices or building codes as applicable for the correct methods, tools, and
materials to be used in performing procedures not specifically described in this
document.
The products covered by this instruction manual are manufactured and/or sold
by Vertiv This document is the property of Vertiv and contains confidential and
proprietary information owned by Vertiv. Any copying, use or disclosure of it
without the written permission of Vertiv is strictly prohibited.
Names of companies and products are trademarks or registered trademarks of
the respective companies. Any questions regarding usage of trademark names
should be directed to the original manufacturer.

TABLE OF CONTENTS
1 Important Safety Instructions 5
2 Glossary of Symbols 7
3 Introduction 9
3.1 Operational Overview 9
3.2 Vertiv™ SmartRow™ DCX Components 9
3.3 Liebert® CRV Notes 10
4 Application Guidelines 11
4.1 Environmental Conditions 11
4.2 Cooling System Design 11
4.3 Heat Load Calculation 13
4.4 Vertiv™ SmartRow™ DCX Equipment Placement within the Row 14
4.4.1 Cooling Unit and Rack Placement 14
4.4.2 UPS System 14
4.4.3 Row Length 15
4.5 IT Equipment Deployment and Wiring 15
4.6 Settings for the Vertiv™ Liebert® iCOM™ on the Liebert® CRV Cooling Unit 16
5 Preparation 17
5.1 Clearance Requirements 17
5.2 Inspection 17
5.3 Unloading the Vertiv™ SmartRow™ DCX 18
5.4 Required Setup Tools and Equipment 18
6 Installation 19
6.1 Assembly Sequence Overview 19
6.1.1 Staging the Vertiv™ SmartRow™ Equipment 19
6.1.2 Installing the Vertiv™ SmartRow™ Equipment 19
6.1.3 Connecting the Equipment 20
6.1.4 Installing Expansion Channels 20
6.1.5 Finalizing Installation 20
6.2 Optional Vertiv™ SmartRow™ DCX Control Panel and Fire Suppression System—Overview 20
6.3 Vertiv™ SmartRow™ DCX Control Panel and Fire Suppression System Component Locations 21
6.3.1 Control Panel and Fire Suppression System Component Operation 22
6.4 Recovering from EPO Circuit Activation 24
6.5 Recovering from a Fire Suppression System Activation 24
6.6 System Set-up and Commissioning 24
6.7 Fire Detection and Suppression System Operation Overview 25
6.8 Restarting after Vertiv™ SmartRow™ DCX Control Panel and Fire Suppression System Has Shut Down 25
7 Installation Checklist 27
7.1 Cooling and Power Component Installation Checklist 27
8 Troubleshooting 29
9 Maintenance 31
Vertiv | SmartRow™ DCX Installation Manual | 3

1 IMPORTANT SAFETY INSTRUCTIONS
SAVE THESE INSTRUCTIONS
This manual contains important instructions that must be closely followed during installation of this system to maintain
compliance with agency listings. Read all safety and operating instructions for all pieces of equipment before attempting to
operate the Vertiv™ SmartRow™ DCX. Adhere to all warnings on the system and in this manual. Follow all operating and
user instructions.
This product is designed for commercial/industrial use only. This product is not intended for use with life support or other
U.S. FDA designated “critical” devices. Maximum loads must not exceed those specified in this manual.
Install the equipment in a clean environment, free from moisture, flammable liquids, gases and corrosive substances. The
Vertiv SmartRow DCX must be deployed in an indoor environment that is maintained year-round between 50°F and 85°F
dry bulb (10°C and 30°C) and less than 60°F dew point (16°C). It is not suitable to install outdoors or in unconditioned
spaces (warehouses, garages, etc). This will avoid undesirable condensate formation and ensure there is air available at
suitable conditions for ventilating the SmartRow system if the Automatic Emergency Ventilation Fans activate. Additionally,
systems using a remote condenser must be operated within these parameters:
The control system provides refrigerant head-pressure control for outdoor ambient temperatures as low as -30°F (-35°C),
provided that the total design range (from minimum to maximum) is 125°F (70°C) or less. For traditional DX applications,
Vertiv™Liebert Lee-Temp kits are required only when the design temperature ranges exceed 125°F (70°C).
•Vertiv™ Liebert® MC condensers—above -20°F (-29°C)
•Liebert MC condensers with Liebert Lee-Temp kits—above -30°F (-35°C)
This product must be connected to and powered by suitable AC supplies, rated in accordance with the unit’s serial tag. It
must be properly grounded and protected by appropriately sized circuit breakers.
NOTE: The Vertiv SmartRow DCX must be installed on a flat, level surface for proper assembly and operation.
Vertiv recommends using shielded cables for all external communication interfaces.
Ensure that the Vertiv SmartRow DCX has proper ventilation. Never block or insert objects into the ventilation holes or other
openings. Maintain minimum clearances as specified in this manual (see Table 5.1 on page17).
WARNING! Risk of handling heavy unit. Can cause equipment damage, injury or death. Read all instructions
before beginning.
WARNING! Risk of top-heavy unit falling over. Improper handling can cause equipment damage, injury or
death.
Only properly trained and qualified personnel wearing appropriate safety headgear, gloves, shoes and glasses should
attempt to move, lift, remove packaging from or prepare the unit for installation.
Read all instructions before attempting to move, lift, remove packaging from or preparing unit for installation.
Vertiv | SmartRow™ DCX Installation Manual | 5

Vertiv | SmartRow™ DCX Installation Manual | 6
This page intentionally left blank.

2 GLOSSARY OF SYMBOLS
Hazardous Voltage Present
Note following instructions
Consult user manual for additional information
Indicates weight
Indicates ground connection
Indicates alternating current
Vertiv | SmartRow™ DCX Installation Manual | 7

Vertiv | SmartRow™ DCX Installation Manual | 8
This page intentionally left blank.

3 INTRODUCTION
The Vertiv™ SmartRow™ DCX is part of the SmartRow™ platform from Vertiv. The system includes integrated cooling and
power systems. Assembly is a matter of connecting the expansion channels and cabinets, then making electrical and piping
connections.
The basic configuration of the Vertiv SmartRow DCX is a dual-expansion-channel, closed-loop system that provides a room-
neutral solution.
The Vertiv SmartRow DCX must be installed in an indoor, climate-controlled environment. The unit will not protect
electronic equipment if it is installed in an environment subject to extreme temperatures or humidity.
This manual is to be used in conjunction with existing Vertiv product manuals for each component and with site-specific
documentation and drawings. User and installation manuals ship with the equipment and are also available at
www.vertiv.com.
The Vertiv SmartRow DCX is a flexible system that allows customization of rack, power and cooling systems within the
limits of the component parts.
3.1 Operational Overview
The Vertiv SmartRow DCX is an enclosed system to house and cool electronic equipment. The Vertiv SmartRow DCX racks
may house critical IT equipment, optional rack power distribution units and optional, rack-mounted UPS units.
Cooling air is supplied in the row by Liebert® CRV thermal-management units and conveyed to the racks via front
expansion channels. Heated exhaust air from the racks returns to the Liebert CRV through rear expansion channels. An
automatic, emergency ventilation fan system is included to exhaust air in the event of a loss of primary mechanical cooling.
UPS-protected conditioned power is provided to each equipment rack using the Vertiv™ Liebert® MBX mounted overhead
and by rack PDUs mounted inside each rack.
3.2 Vertiv™ SmartRow™ DCX Components
Required components differ based on whether the Vertiv SmartRow DCX includes power and/or redundancy options.
•Vertiv SmartRow DCX Expansion Channels—for each Vertiv™ DCX rack, Liebert® CRV and UPS.
•Liebert® MBX—power-distribution system.
•Liebert® EXM UPS—modular, scalable, with wrap-around BDC and internal or external batteries.
•Liebert® CRV—in-row cooling unit specially configured for use in the Vertiv SmartRow DCX.
•Vertiv™ DCE Rack—network (800mm wide) and server (600mm wide) rack configurations.
•Fire Detection and Suppression —integrated fire detection and suppression cabinet that is sized per design
(optional).
Vertiv | SmartRow™ DCX Installation Manual | 9

Figure 3.1 Vertiv™ SmartRow™ DCX components
3.3 Liebert® CRV Notes
•Does not include reheat or humidifier
•Includes a condensate pump, drain field-installed.
•Factory-installed leak detection
Vertiv | SmartRow™ DCX Installation Manual | 10

4 APPLICATION GUIDELINES
The pre-engineered Vertiv™ SmartRow™ DCX micro-data center delivers highly predictable, repeatable performance in a
variety of applications. This platform maximizes the flexibility in equipment configuration to meet the requirements of a
given application without complicating the overall selection, design or deployment process.
The Vertiv SmartRow DCX system architecture eases the dependence on the site, allowing it to be deployed on raised and
non-raised floors within traditional data centers and in non-traditional IT spaces. When tailoring and deploying a Vertiv
SmartRow DCX for a given application, be sure to follow all of the following guidelines.
When selecting a Vertiv SmartRow DCX system, be sure to exceed the minimum heat-load requirements for the row, do not
exceed the maximum UPS and cooling capacities and select a UPS and busway that offer capacity expansion that is
sufficient to support future growth, if desired. Also, be sure that the initial placement of the cooling units within the row
allows for additional racks and cooling units to be added without having to relocate the existing equipment.
4.1 Environmental Conditions
The Vertiv SmartRow DCX must be deployed in an indoor environment that is maintained year round between 50°F and
85°F (10°C and 30°C) dry bulb and less than 60°F dew point (16°C). It is not suitable for installation outdoors or in
unconditioned spaces (loading docks, unconditioned warehouses, garages, etc). A properly conditioned environment avoids
undesirable condensate formation and ensures that there is air available at suitable conditions for ventilating the SmartRow
system if the Automatic Emergency Ventilation Fans activate.
4.2 Cooling System Design
Adhere to the following guidelines when tailoring a Vertiv™ SmartRow™ DCX cooling system for a particular application.
The automatic, emergency backup ventilation fans are nominally rated for 1,000 cfm. They are designed to provide time to
perform an orderly shutdown of the protected system. Duration of this time is dependent on the size and environmental
conditions of the room external to the Vertiv SmartRow DCX.
NOTICE: If the Vertiv SmartRow DCX is installed in a dedicated room and the airflow inlet and outlet openings are not
provided, the effectiveness of the ventilation system will degrade as the room warms. Providing fresh air relief to the room
and ducting the fan exhaust out of the space will extend run time. Large rooms may be able to run for the full duration of the
UPS battery run time before elevating the room temperature, not requiring the heat to be ducted out.
The Liebert® CRV 600 Series row-based cooling units are 600mm wide and includes 20kW, CRV 35-kW and 40-kW
models.
Vertiv | SmartRow™ DCX Installation Manual | 11

System Type Liebert® CRV Model Nominal Cooling Capacity Minimum Heat Load
percooling unit1
Maximum Capacity
percooling unit2
Air-Cooled3
CR020RA 20 kW 4.8 kW 24.8kW
CR035RA 35 kW 9 kW 39.7 kW
Water/Glycol4
CR020RW 20 kW 4.7 kW 22.9 kW
CR035RW 35 kW 8.7 kW 37.0 kW
Chilled Water5CR040RC 40 kW 6.0 kW 46.6 kW
1. Minimum heat load based on 20% net sensible cooling capacity at 80°F (27°C) return air temperature, 52°F dew point (11°C).
2. Maximum capacity based on 100% net sensible cooling capacity at 100°F (38°C) return air temperature, 52°F dew point (11°C).
3. Air-cooled capacities based on 105°F (41°C) outdoor Liebert® MC condenser matchup.
4. Water-gylcol capacities based on 10% propylene-glycol concentration with matching 105°F (41°C) outdoor drycooler matchup and
pump package.
5. Chilled-water capacities based on 45°F (8°C) entering water conditions with 10°F (6°C) rise, always use site-specific water conditions
when determining cooling unit net sensible capacity.
Table 4.1 Vertiv™ SmartRow™ DCX quick-reference cooling-unit capacities
UPS Capacity
Heat Dissipation (kWh)
Cooling Air Flow
(CFM)
208V 4W+G UPS input
without input transformer
480V 3W+G UPS input
w \input transformer
Liebert EXM 100kVA 5.5 8.6 339
Liebert EXM 80kVA 4.4 7.2 271
Liebert EXM 60kVA 3.3 5.3 203
Liebert EXM 40kVA 2.2 3.8 136
Liebert EXM 20kVA 1.1 1.8 68
Table 4.2 Liebert® EXM UPS quick-reference heat dissipation and air flow
Number of Racks* per Liebert CRV Minimum (Rmin) Maximum (Rmax)
CRV 600: 20 kW 2 7
CRV 600: 35/40 kW 3 8
*Server (600mm wide) and Networking (800mm wide) racks are treated equally and are generically referred toas“racks.”
Consult the factory if you need to deviate from these limits.
Table 4.3 Minimum and Maximum Number of Racks per Liebert CRV Cooling Unit
Vertiv | SmartRow™ DCX Installation Manual | 12

4.3 Heat Load Calculation
When determining the number of cooling units required to support the SmartRow, make sure to include the total IT
equipment and UPS heat dissipation, along with parasitic room losses. The amount of heat that an IT device rejects may be
very different than the power it consumes. This is common with PoE (Power over Ethernet) switches. Always reference the
heat-dissipation value, not power consumed, on the IT device's specification sheet.
When a UPS system is located within the Vertiv SmartRow DCX and conditioned by the row-based air conditioners, all of
the power leaving the UPS should be fed to the rack-mounted IT equipment. Consult the factory before using the integral
UPS system to power equipment outside of the row.
Figure 4.1 Capacity calculation template
1.) Rack Mounted Heat Load* _______ kW
2.) UPS Heat Load _______ kW
3.) Room Heat Load _______ kW
4.) Total Heat Load, S _______ kW
5.) Maximum Capacity per Cooling Unit _______ kW (From Table 4.1 on the previous page)
6.) Minimum Quantity of Liebert® CRV Cooling Units, = ______ Cooling units (Round up to whole number)
7.) Add 1 if desire N+1 cooling redundancy, + ______ (Enter 0 or 1)
8.) Total Quantity of Liebert CRV Cooling Units in Vertiv
SmartRow DCX, = ______ Cooling units
9.) Minimum Heat Load per Liebert CRV, x _______ kW (From Table 4.1 on the previous page)
10.) Minimum Constant Rack Mount Heat Load, = _______ kW (UPS heat load does not count toward
minimum)
11.) Total Quantity of Liebert CRV Cooling Units in Vertiv
SmartRow DCX ______ Cooling units (From Row 8 above)
12.) Minimum number of racks per CRV (Rmin), x ______ Racks (From Table 4.3 on the previous page)
13.) Minimum number of Vertiv SmartRow DCX racks, = ______ Racks
14.) Consult Table 4.3 on the previous page for Maximum Rack
Limitations. ______
If designing for N+1 cooling redundancy, be sure that all racks are within the region of influence of 2 or more Liebert CRVs.
*Enter heat dissipation, not power consumption. Contact factory if powering IT equipment outside of the Vertiv SmartRow DCX.
Vertiv | SmartRow™ DCX Installation Manual | 13

4.4 Vertiv™ SmartRow™ DCX Equipment Placement within the Row
4.4.1 Cooling Unit and Rack Placement
•Server (600mm wide) and Networking (800mm wide) racks are treated equally and generically referred to as
“racks.”
•When determining the location for Liebert® CRVs within the row, they should be evenly spaced within the rack
lineup to maintain uniform airflow distribution, assuming that the heat-load density is fairly uniform across all of
the racks. If there are a couple of racks within the row with a higher concentration of heat, Liebert® CRVs may
be placed closer to that equipment.
•Do not place two Liebert CRV cooling units next to each other.
•UPS placement does not influence the placement of the cooling units due to the relatively low heat and air-flow
demands of the UPS system.
•If the cooling system is designed for N+1 redundancy, be sure that each rack is within the region of influence of
2 or more Liebert CRVs with sufficient capacity. This will ensure that if any cooling unit fails, another unit will be
able to condition the IT equipment.
•Do not place a Liebert CRV at the end of a row next to a UPS because this would put the Liebert CRV too far
from the rack-mounted IT equipment (see Do not locate Liebert CRV at end of row next to UPS system below).
Figure 4.2 Do not locate Liebert CRV at end of row next to UPS system
4.4.2 UPS System
•Two UPS systems can be located next to each other.
•Three-phase, row-based UPS systems must be placed at the left end of the row (when viewed from the front,
cold side) to ease addition of battery cabinets to the UPS system in the future.
•Battery cabinets can be remotely located, but they will not be conditioned by the row-based cooling system.
Vertiv | SmartRow™ DCX Installation Manual | 14

Figure 4.3 Recommended: UPS system at left-end of row
4.4.3 Row Length
When calculating the row length of the Vertiv™ SmartRow™ DCX, include the following distances between the various pieces
of row-based equipment to accurately account for the gasketing and baying brackets. Refer to the Submittals for complete
clearance requirements.
Neighboring Equipment Distance Between
Rack - Rack
10mm (0.40 in)
Rack - Liebert® CRV
Rack - UPS, BDC or Battery cabinet
Liebert CRV - UPS, BDC or Battery Cabinet
UPS - BDC
28mm (1.10 in)UPS - Battery Cabinet
Redundant UPS Systems
Table 4.4 Included spacing between system
equipment
4.5 IT Equipment Deployment and Wiring
•Follow industry best practices when deploying IT equipment within the Vertiv™ SmartRow™ DCX.
•To maintain good cold-hot air separation, use blanking panels in all unoccupied RU space.
•Neatly manage all fiber and Ethernet cabling to avoid air-flow restrictions.
•Never route any type of cable within or through the front or rear expansion channels (ECs). Doing so will restrict
air flow and prevent the ECs from being removed from the row equipment.
•When loading IT equipment in the racks, try to distribute the load evenly throughout the row. If there is a higher
density rack, that rack should be closest to a Liebert® CRV.
Vertiv | SmartRow™ DCX Installation Manual | 15

4.6 Settings for the Vertiv™ Liebert® iCOM™ on the Liebert® CRV Cooling Unit
•All of the Liebert CRV cooling units are to be configured in Teamwork Mode 3 with the controlling sensors set
to use the 2T rack-inlet temperature readings.
•The low end of the Liebert CRV fan-speed modulation range is raised at the factory. Do not field-adjust.
•Do not run the Liebert CRV in a staged (staggered) or stand-by configuration. All Liebert CRVs must be
operational at the same time. Ensure your IT equipment dissipates the minimum heat load required by the
entire cooling system on day one.
•For questions on navigating the Liebert iCOM control system call 800-543-2778 for Liebert® Environmental
Technical Support.
Vertiv | SmartRow™ DCX Installation Manual | 16

5 PREPARATION
The application and installation location should be determined and prepared before the Vertiv™ SmartRow™ DCX is
delivered. Proper planning will permit installation of the required power and coolant connections and ensure proper
clearances. The installation location must have:
•An indoor, climate-controlled environment with the ambient temperature year round between 50°Fand85°F
dry bulb (10°C and 30°C) and less than 60°F (16°C) dew point.
•Sufficient height and clearance from ceilings, walls, fixtures and overhead sprinkler nozzles for the Vertiv
SmartRow DCX, including its emergency fans and power distribution.
IMPORTANT! The Vertiv SmartRow DCX must be installed on a flat, level surface to maintain proper spacing and
provide tight seals. Leaving gaps in the field-applied gaskets will reduce cooling efficiency and increase energy use.
•Suitable location for outdoor Liebert® MC condenser, where the equivalent refrigerant piping length will not
exceed values listed in the Liebert® CRV Installation Manual (air-cooled systems).
•Adequate heat rejection coolant supply for the Liebert CRV (chilled water or water/glycol-cooled systems).
•Input power sufficient for:
•Each Liebert CRV—each requires a separate input-power feed.
•Liebert® EXM - ships as single-input configuration, but may be wired as dual-input.
NOTE: For details about any component’s requirements, refer to that unit’s user manual:
•Liebert® CRV Installation Manual is SL-11975.
•Liebert CRV with Liebert® iCOM™ User Manual is SL-11987.
•Liebert iCOM User Manual is SL-11987.
•Liebert® EXM 208V User Manual is SL-25650
•Vertiv™ DCE Rack System User Manual is SL-11992
•Liebert MBX Busway Track System User Manual is SL-70371
These are delivered with the unit and are available at http://www.vertiv.com/en-us/support/.
5.1 Clearance Requirements
See Vertiv SmartRow DCX dimension details in submittal drawings contained in Technical Illustrations on page33.
Clearances Minimum, in. (mm)
Liebert EXM UPS system front and back 36 (915)
Liebert CRV cooling unit front and back 36 (915)
Closest building sprinkler to any surface 18 (458)
Between emergency fan module and parallel surface 16 (407)
Table 5.1 Vertiv SmartRow DCX system clearances
5.2 Inspection
Upon receiving a Vertiv™ SmartRow™ DCX, examine the packaging for any signs of mishandling or damage. If any damage
is found, notify your local Vertiv™ representative and the carrier immediately.
Vertiv | SmartRow™ DCX Installation Manual | 17

5.3 Unloading the Vertiv™ SmartRow™ DCX
Before unloading the Vertiv SmartRow DCX, refer to the manual for each component, particularly the Liebert® CRV, Liebert®
EXM and Liebert® DCE Racks. These manuals are shipped with the Vertiv SmartRow DCX and are available at
www.vertiv.com.
Read each manual thoroughly. They include handling instructions and safety notices that must be followed when unpacking,
installing, operating and maintaining the Vertiv SmartRow DCX.
Adhere to all warnings, cautions and installation, operating and safety instructions on the units and in their manuals. Only
properly trained and qualified personnel should move, install, operate or service this equipment.
5.4 Required Setup Tools and Equipment
The following tools are needed to set up a Vertiv SmartRow DCX:
•Standard and metric socket sets
•Phillips-head screwdriver
•Flat-blade screwdriver
•Forklift or pallet jacks
•Utility knife
•Carpenter’s level, 3 feet long or longer
•Battery-powered drill with T30, Phillips, and Flat-blade bits
•Sheet-metal hole saw or punch kit (for conduit entries)
Vertiv | SmartRow™ DCX Installation Manual | 18

6 INSTALLATION
6.1 Assembly Sequence Overview
1. Equipment is delivered and de-trashed by Vertiv™ SmartRow™ Delivery Service Provider.
2. Stage equipment for installation.
3. Place and level all row-based equipment in the lineup you want according to the user/installation manuals.
4. Install Liebert® MBX system.
5. Install expansion channels.
6. Make all Vertiv™ SmartRow™ DCX connections as required.
6.1.1 Staging the Vertiv™ SmartRow™ Equipment
1. Thoroughly inventory the equipment received.
2. Place each piece of row equipment in its designated location.
3. Stage the expansion channels (ECs) around the perimeter of the room taking care to position the ECs with the
equipment they will be attached to.
4. Each EC contains a box of hardware specific to each EC. Take care to keep the hardware boxes with their
respective EC.
6.1.2 Installing the Vertiv™ SmartRow™ Equipment
1. Refer to the user/installation manual for all row-based equipment for specific installation instructions.
2. Referring to the Vertiv™ SmartRow™ DCX submittal drawings and starting with the UPS (if applicable), install
the equipment in the lineup.
3. For proper alignment, install the gasketing and spacers included with the UPS equipment.
Tip: Adjust all equipment leveling feet until the casters are just off the floor. This will ensure proper fit of the
skirting, installed later if supplied. This will also assist in leveling if the floor is uneven.
4. Use the provided hardware, included in the Vertiv SmartRow DCX spacer kit, to bolt together the 3-phase UPS,
BDC and battery cabinet.
5. Use the provided power- and control-wiring harnesses for the cabinet cabling.
6. Install any top plenums required by the UPS cabinets.
7. Install the Liebert® CRV and Liebert® DCE racks in the order shown on the submittal drawings. Use the
gasketing and cluster kits for proper alignment.
8. After all cabinets are installed, level the tops from end to end, and then front to back. Make sure the cabinets
are completely level in both directions when finished.
9. Install the Liebert® MBX mounting brackets on top of each Vertiv™ DCE rack. Consider locations of BDC
cabling, busplug rack cabling and Liebert CRV connections during bracket installation.
10. Assemble and mount the Liebert MBX according to the Liebert MBX installation manual SL-70371.
11. Mount the Vertiv SmartRow network switch (vNSA) and Vertiv SmartRow DCX and fan control box and make
control wiring connections.
Vertiv | SmartRow™ DCX Installation Manual | 19

6.1.3 Connecting the Equipment
Refer to the user/install manuals for each piece of equipment as required.
1. Make all connections to the UPS BDC cabinets (input power and Liebert® MBX).
•The UPS requires an upstream over-protection device (a circuit breaker or manual isolation switch.
•Install the protection device per local codes and agency requirements.
2. Make all power, coolant and drain connections to the Liebert® CRV equipment.
3. Connect the Liebert® MC Condenser (if applicable) control wire to the Liebert CRVs and route the wire to the
condenser based on the site-specific application.
4. Using the provided adapter cables, connect power to the Vertiv™ SmartRow™ vNSA and Vertiv™ SmartRow™
fan controller from the Liebert MBX busplug.
NOTICE
Risk of improper power input.
Improper power input can cause equipment damage or degrade performance.
6.1.4 Installing Expansion Channels
Refer to Technical Illustrations on page33 for detailed expansion channel installation instructions.
6.1.5 Finalizing Installation
1. Install busplugs into the overhead Liebert MBX and align them with the Vertiv™ DCE racks that they power.
2. Connect the rack PDU plugs into the busplugs.
3. The 2T temperature sensors are pre-wired to each rack. Connect the sensors to the Liebert® CRVs in the row
and correctly set the 2T sensor DIP switches per the supplied instructions.
4. Cable the Liebert CRV iCOM and monitoring card to the Vertiv™ SmartRow™ network switch.
5. Cable the UPS monitoring card to the Vertiv SmartRow network switch.
NOTICE
Do not run any cables in the expansion channels. Doing so will reduce the airflow and eliminate the ability to
remove the expansion channels. The expansion channels should not be removed unless absolutely necessary.
6.2 Optional Vertiv™ SmartRow™ DCX Control Panel and Fire Suppression System—Overview
The Vertiv SmartRow DCX must be installed in compliance with all applicable national, state and local fire codes. An
emergency power off (EPO) switch is provided as one means of meeting regulations. Additional field-supplied connections
to the system may be required, depending on the applicable regulations, the equipment configuration and the user’s
operational preference.
The optional Vertiv SmartRow DCX Control Panel and Fire Suppression System has been fully tested and certified at the
factory.
The Vertiv SmartRow DCX Control Panel and Fire Suppression System is shipped with wiring that, if required by local fire
code, must be field-connected to the shutdown circuits of the Liebert® CRV and any connected UPS systems.
Under NFPA regulations, systems protected by a clean fire-suppression agent can be left with the UPS and HVAC systems
operational at the discretion of the owner and local fire officials.
Vertiv | SmartRow™ DCX Installation Manual | 20