Verus Engineering EJ 25 AVCS Manual

EJ 25 AVCS Heat Shield Cover
Install Manual
Author: Eric Hazen
Release Date: 2018/09/17
Approvals:E. Hazen, P. Lucas
Document Revisions
Rev
Date
Author
Description
01
2018/09/17
E. Hazen
Initial release of install manual
Confidential: Property of Verus Engineering. Not for Distribution outside intended recipient list.
Verus Engineering
sales@verus-engineering.com

2 3/6/2016
Author: Eric Hazen
Date: 2018/09/17
Recipients: Public
ENGINEERING | NORTH AMERICA
REVISION: R01
Confidential: Property of Verus Engineering. Not for Distribution outside intended recipient list.
Verus Engineering
sales@verus-engineering.com
AVCS Heat Shield Cover –Install Manual
CONTENTS
1. Introduction ....................................................................................................................................... <3>
1.1. Overview .................................................................................................................................... <3>
1.2. Difficult....................................................................................................................................... <3>
1.3. Time Required............................................................................................................................ <3>
1.4. Tools Needed ............................................................................................................................. <3>
1.5. AVCS Heat Shield Components.................................................................................................. <3>
2. Heat Shield Assembly .................................................................................................................... <4-8>
3. Heat Shield Install ......................................................................................................................... <8-16>

3 3/6/2016
Author: Eric Hazen
Date: 2018/09/17
Recipients: Public
ENGINEERING | NORTH AMERICA
REVISION: R01
Confidential: Property of Verus Engineering. Not for Distribution outside intended recipient list.
Verus Engineering
sales@verus-engineering.com
AVCS Heat Shield Cover –Install Manual
1. Introduction
1.1. Overview: Detailed instructions on installing the Verus Engineering AVCS Heat Shield Cover
for the EJ 25 STI engine.
1.2. Difficulty: Easy
1.3. Time Required: 1-1.5 hour
1.4. Tools Needed:
1.4.1. 10mm Wrench
1.4.2. 10mm Socket
1.4.3. Ratchet
1.4.4. Extensions
1.4.5. 9mm Deep Socket
1.4.6. Jack and jack stands
1.4.7. Screwdriver or plastic push pin remover
1.5. Dive Plane Components
1.5.1. (2) Heat Shield Bracket
1.5.2. (2) Gold Foil Pieces
1.5.3. Hardware Bag
1.5.3.1. (3) M6 x 1.0 Hex Head Cap Screw (HHCS), 12mm Long –Stainless
1.5.3.2. (1) M6 x 1.0 HHCS, 20mm Long –Stainless
1.5.3.3. (4) M6 x 12mm Small Washer - Stainless
1.5.3.4. (4) M6 x 18mm Fender Washer –Stainless
1.5.3.5. (1) M6 Locking Push Nut
1.5.3.6. (1) M6 x 8mm Aluminum Spacer

4 3/6/2016
Author: Eric Hazen
Date: 2018/09/17
Recipients: Public
ENGINEERING | NORTH AMERICA
REVISION: R01
Confidential: Property of Verus Engineering. Not for Distribution outside intended recipient list.
Verus Engineering
sales@verus-engineering.com
AVCS Heat Shield Cover –Install Manual
2. Heat Shield Assembly
2.1. We begin the installation by assembling the heat shield.
2.2. We will start with the small bracket, as it is a bit easier to install the gold foil.
2.3. Remove the plastic protective film.
2.4. Clean the bracket with a microfiber tower and some rubbing alcohol or acetone if you have
some, if not, water will be sufficient.

5 3/6/2016
Author: Eric Hazen
Date: 2018/09/17
Recipients: Public
ENGINEERING | NORTH AMERICA
REVISION: R01
Confidential: Property of Verus Engineering. Not for Distribution outside intended recipient list.
Verus Engineering
sales@verus-engineering.com
AVCS Heat Shield Cover –Install Manual
2.5. Remove the adhesive backing from the gold foil and install it on the bracket as shown below.
Firmly press the gold foil down from one side to the other, to reduce wrinkles in the foil.
2.6. Moving onto the larger piece, use the same process as the small shield. Remove the
protective film.
2.7. Clean the component quickly.

6 3/6/2016
Author: Eric Hazen
Date: 2018/09/17
Recipients: Public
ENGINEERING | NORTH AMERICA
REVISION: R01
Confidential: Property of Verus Engineering. Not for Distribution outside intended recipient list.
Verus Engineering
sales@verus-engineering.com
AVCS Heat Shield Cover –Install Manual
2.8. Apply the gold foil to the bracket. This component is quite a bit more difficult than the small
bracket. What we found to work the best, is lining up the front of the bracket with the gold
foil as well as the slot cut out.
2.9. Cleanly push the gold foil down on the top of the shield.
2.10. Push the gold foil down on the bent sides of the shield and fully install the gold foil.

7 3/6/2016
Author: Eric Hazen
Date: 2018/09/17
Recipients: Public
ENGINEERING | NORTH AMERICA
REVISION: R01
Confidential: Property of Verus Engineering. Not for Distribution outside intended recipient list.
Verus Engineering
sales@verus-engineering.com
AVCS Heat Shield Cover –Install Manual
2.11. Now we need to pre-install the bolt and spacer for an easier install.
2.12. Grabbing the 20mm long HHCS, and either a small or large washer, place it through the
slot as shown below. You can use either the large diameter washer, or small diameter
washer (shown here); we supply enough washers for either preference.
2.13. Flip the cover over, and install the 8mm spacer and push nut to keep it hold on by using
a 9mm deep socket.
2.14. Below is a photo of the bracket ready for install.

8 3/6/2016
Author: Eric Hazen
Date: 2018/09/17
Recipients: Public
ENGINEERING | NORTH AMERICA
REVISION: R01
Confidential: Property of Verus Engineering. Not for Distribution outside intended recipient list.
Verus Engineering
sales@verus-engineering.com
AVCS Heat Shield Cover –Install Manual
3. Heat Shield Install On Car –Pictures courtesy of Pure Tuning!
3.1. Verus Engineering is not responsible for damage to you or your vehicle by following this
manual and/or installing Verus Engineering products.
3.2. It is wise to have the car fairly cool for this install as you are working near and around the
engine and exhaust components of the car.
3.3. We begin by gaining access to the bottom of the engine; we can do so by jacking the car up
or lifting it on a lift. Use proper safety procedures for each route.
3.4. Remove the engine’s plastic underbody cover (belly pan) by remove multiple plastic push
pins and bolts. This plastic cover is pointed out in the below photo.

9 3/6/2016
Author: Eric Hazen
Date: 2018/09/17
Recipients: Public
ENGINEERING | NORTH AMERICA
REVISION: R01
Confidential: Property of Verus Engineering. Not for Distribution outside intended recipient list.
Verus Engineering
sales@verus-engineering.com
AVCS Heat Shield Cover –Install Manual
3.5. With the engine belly pan removed, you’ll have access to the engine, as shown below.
3.6. Remove the factory AVCS cover by removing the 10mm bolt (yellow arrow) and unclipping
the plastic clip towards the back (red arrow).

10 3/6/2016
Author: Eric Hazen
Date: 2018/09/17
Recipients: Public
ENGINEERING | NORTH AMERICA
REVISION: R01
Confidential: Property of Verus Engineering. Not for Distribution outside intended recipient list.
Verus Engineering
sales@verus-engineering.com
AVCS Heat Shield Cover –Install Manual
3.7. The AVCS cover should be free and removed at this point.
3.8. Remove the vehicle side ground to improve access when installing the heat shield.

11 3/6/2016
Author: Eric Hazen
Date: 2018/09/17
Recipients: Public
ENGINEERING | NORTH AMERICA
REVISION: R01
Confidential: Property of Verus Engineering. Not for Distribution outside intended recipient list.
Verus Engineering
sales@verus-engineering.com
AVCS Heat Shield Cover –Install Manual
3.9. Place the heatshield in line (perpendicular to its installed position) with the car between the
exhaust manifold and head.
3.10. As you slide the shield into position you will rotate it 90deg counter clockwise watching
the inside edge clearance to other hardware.

12 3/6/2016
Author: Eric Hazen
Date: 2018/09/17
Recipients: Public
ENGINEERING | NORTH AMERICA
REVISION: R01
Confidential: Property of Verus Engineering. Not for Distribution outside intended recipient list.
Verus Engineering
sales@verus-engineering.com
AVCS Heat Shield Cover –Install Manual
3.11. Once you have the shield roughly in place you will loosely thread in the 10mm hex head
bolt with spacer on the top side into an unused bolt hole on the AVCS solenoid (blue
arrow). Do not tighten this bolt yet. (*Note, hardware has updated since install photos*)
3.12. Install the small bracket supplied with the shield using the remaining supplied
fasteners and long OE bolt into place. Do not tighten these bolts completely yet.

13 3/6/2016
Author: Eric Hazen
Date: 2018/09/17
Recipients: Public
ENGINEERING | NORTH AMERICA
REVISION: R01
Confidential: Property of Verus Engineering. Not for Distribution outside intended recipient list.
Verus Engineering
sales@verus-engineering.com
AVCS Heat Shield Cover –Install Manual
3.13. Take a look at the shield placement and make sure it is square and lined
up. Hold it in place and first tighten the AVCS control valve bolt on the back of
the shield.

14 3/6/2016
Author: Eric Hazen
Date: 2018/09/17
Recipients: Public
ENGINEERING | NORTH AMERICA
REVISION: R01
Confidential: Property of Verus Engineering. Not for Distribution outside intended recipient list.
Verus Engineering
sales@verus-engineering.com
AVCS Heat Shield Cover –Install Manual
3.14. Tighten the captive 10mm hex bolt at the bottom of the shield (hardware has
updated since initial install). This was the first fastener you installed.
3.15. Ensure the shield is square with the timing cover and then finally tighten the
fasteners on the outside bracket.
3.16. Recheck all the recently installed fasteners to make sure they are tight.
3.17. For those with an upgraded header on 2015+ STI we recommend attaching
the passenger side ground wire engine side to the valve cover lower center bolt
as shown below.

15 3/6/2016
Author: Eric Hazen
Date: 2018/09/17
Recipients: Public
ENGINEERING | NORTH AMERICA
REVISION: R01
Confidential: Property of Verus Engineering. Not for Distribution outside intended recipient list.
Verus Engineering
sales@verus-engineering.com
AVCS Heat Shield Cover –Install Manual
3.18. Reinstall front belly pan.
3.19. Congratulations on installing the Verus Engineering AVCS heat shield.
3.20. Please send any questions, comments, concerns, or photos to Verus Engineering via e-
mail; sales@verus-engineering.com.

16 3/6/2016
Author: Eric Hazen
Date: 2018/09/17
Recipients: Public
ENGINEERING | NORTH AMERICA
REVISION: R01
Confidential: Property of Verus Engineering. Not for Distribution outside intended recipient list.
Verus Engineering
sales@verus-engineering.com
AVCS Heat Shield Cover –Install Manual
Table of contents