
4
1. Information Disposal of packaging ............................................................................ 6
Symbols ................................................................................................. 6
Intended use .......................................................................................... 6
Product information ................................................................................ 7
■Type BW 301.B and BWC 301.B ........................................................ 7
■Type BWS 301.B (heat pump stage 2) ............................................... 7
■System examples ............................................................................... 8
2. Preparing for installation Designations in the system examples ................................................... 9
Primary circuit, type BW/BWC 301.B ..................................................... 10
■With water/water heat pump conversion kit: 1 primary pump ............. 10
Primary circuit, type BW 301.B + BWS 301.B (2-stage) ........................ 12
■With water/water heat pump conversion kit: 2 primary pumps ........... 12
■With water/water heat pump conversion kit: 1 common primary
pump ................................................................................................... 14
Requirements for on-site connections ................................................... 17
■1-stage (type BW 301.B, BWC 301.B) ............................................... 17
■2-stage (type BW 301.B + BWS 301.B) .............................................. 18
Siting and transport requirements .......................................................... 19
■Transport ............................................................................................ 19
■Installation room requirements ........................................................... 19
3. Installation sequence Positioning the heat pump ..................................................................... 21
Removing the top panel ......................................................................... 22
Making the hydraulic connections .......................................................... 22
■Connecting the primary circuit ............................................................ 22
■Connecting the secondary circuit ....................................................... 23
Electrical connection .............................................................................. 24
■Preparing the electrical connections ................................................... 24
■Installing the programming unit (type BW 301.B and BWC 301.B) .... 25
■Routing cables to the wiring chamber ................................................ 26
■Making the electrical connection of heat pump stage 1 (type
BW 301.B) and stage 2 (type BWS 301.B) ......................................... 27
■Overview of the electrical connections of the heat pump control unit
(type BW/BWC 301.B) ........................................................................ 28
■Main PCB (230 V~ components) ........................................................ 28
■Expansion PCB on main PCB (230 V~ components) ......................... 32
■Cross connect PCB (signal and safety connections) .......................... 36
■Controller and sensor PCB (sensors) ................................................. 38
■Connection of primary circuit flow/return temperature sensor, 2-
stage heat pump ................................................................................. 40
■Swimming pool heating ...................................................................... 40
Power supply ......................................................................................... 41
■Heat pump control unit power supply 230 V~ ..................................... 42
■Compressor power supply 400 V~ ..................................................... 42
■Power supply with power-OFF: Without on-site load disconnect ....... 43
■Power supply with power-OFF: With on-site load disconnect ............ 44
■Mains power supply in conjunction with on-site power consumption . 47
■Smart Grid .......................................................................................... 47
■Phase monitor (if installed) ................................................................. 49
Make connections at terminals X3.8/X3.9 ............................................. 50
Closing the heat pump ........................................................................... 50
Checking the diaphragm grommets ....................................................... 51
4. Commissioning, inspec-
tion, maintenance
Steps - commissioning, inspection and maintenance ............................ 52
5. Maintenance Overview of wiring chamber .................................................................. 67
■Type BW/BWC 301.B ......................................................................... 67
■Type BWS 301.B ................................................................................ 68
Index
Index
5516461