15,17) Restore the electrical supply to the appli-
ance and open a hot water outlet – preferably the
bath-tap – ensuring a high flow rate. The appli-
ance will now fire and go to maximum gas rate
(10.1mbar), if the pressure is wrong it should be
adjusted as instructed in 7.6 Once the check has
been concluded, close hot water outlet, isolate
appliance from electrical supply, remove ma-
nometer and tighten test nipple screw.
MINIMUM (1.5mbar)
Although burner pressure settings are factory
set, it is necessary to check them during commis-
sioning. Isolate boiler from the electrical supply,
attach a suitable manometer to the gas valve
outlet test nipple, (see fig. 15,17) and remove the
black plug connected to the modulating coil on
the gas valve. Restore the electrical supply to the
appliance and open a hot water outlet. The
appliance will now fire and go to minimum gas
rate (1.5mbar), if the pressure is wrong it should
be adjusted as instructed in 7.6. Once the check
has been concluded, close hot water outlet, iso-
late appliance from electrical supply, refit plug to
modulating coil, remove manometer and tighten
test nipple screw.
HEATING MINIMUM (1.9mbar)
Although burner pressure settings are factory set,
it is necessary to check them during
commissioning. Isolate boiler from the electrical
supply, attach a suitable manometer to the gas
valve outlet test nipple (see fig. 15 & 17). Restore
the electrical supply to the appliance and ensure
all controls are calling for heat, turn the appliance
mode selector switch to heating and hot water,
the appliance will now fire. Once the burner has
lit, open – for a few seconds only – a hot water
outlet, the burner will now remain on minimum
output (1.9mbar) for 30 seconds. If the pressure
is wrong it should be adjusted as instructed in
7.6. Once the check has been concluded, isolate
appliance from electrical supply, remove
manometer and tighten test nipple screw.
HEATING MAXIMUM
There is no range rating facility on the appliance.
The appliance automatically adjusts its output
tooptimise efficiency.
After adjustment to the gas valve, the protective
cap should be re-sealed.
5.9 FINAL FLUSHING OF THE HEATING SYSTEM
The system should be flushed in accordance with
BS7593. Turn on the boiler for central heating
and allow the boiler and system to reach tem-
perature. Turn off the boiler and drain the system
whilst still hot.
Refill the boiler and heating system as described
in 5.3.
Although not necessary for correct operation of
the boiler, an inhibitor may be added at this point.
Contact the inhibitor manufacturer for further in-
formation concerning application and dosage.
5.10 SETTING THE BOILER OPERATING TEM-
PERATURE
The flow outlet temperature can be adjusted from
40ºC. - 80ºC. via the potentiometer located be-
hind the mode selector switch, the potentiometer
has three temperatures sectors.
●Sector 1. 40ºC - 55ºC
●Sector 2. 55ºC - 65ºC
●Sector 3. 65ºC - 80ºC
When the potentiometer is set within sector 2 the
appliance will automatically raise the outlet tem-
perature to maintain comfort levels during cold
weather conditions. To adjust the heating
potentiometer proceed as follows.
SECTOR 1
Ensure the appliance has been set to hot water
and heating mode, remove the mode selector
switch, and gently rotate the potentiometer clock-
wise, until the green LED on the appliance fascia
flashes, now rotate the potentiometer anti-clock-
wise by a few degrees, the potentiometer is now
in sector 1. Replace mode selector switch.
SECTOR 2
Ensure the appliance has been set to hot water
and heating mode, remove the mode selector
switch, and gently rotate the potentiometer clock-
wise, until the green LED on the appliance fascia
flashes, the potentiometer is now in sector 2.
Replace mode selector switch.
SECTOR 3
Ensure the appliance has been set to hot water
and heating mode, remove the mode selector
switch, and gently rotate the potentiometer fully
clockwise until the stop is reached, the
potentiometer is now in sector 3. Replace mode
selector switch.
NOTE
When the potentiometer moves from sector 1 to
sector 2, the green LED will flash for 4 seconds.
When the potentiometer moves from sector 3 to
sector 2, the green LED will flash for 4 seconds.
5.11 SETTING THE SYSTEM DESIGN PRESSURE
The design pressure should be I minimum of 1
bar and a maximum of 1.5 bar.
The actual reading should ideally be 1 bar plus
the equivalent height in metres to the highest
point in the system above the base of the appli-
ance. (Up to the maximum of 1.5 bar total).
N.B. The safety valve is set to lift at 3 bar/ 30m/
45psig.
To lower the system pressure to the required
value, pull lever on head of safety valve to re-
lease water until the required figure registers
on the pressure gauge (see fig.1).