Installation
1. Cold water supply to be 22 mm nominal size.
2. Flush supply pipework before connection to remove all flux and debris prior to fitting the inlet
controls. Failure to do this may result in irreparable damage to the controls and will invalidate
the warranty.
3. The "MULTIBLOC" can be fitted in any orientation to suit the installation as long as it is fitted in
the correct flow direction. Check the flow arrows on the side of the body.
4. The expansion valve should be either horizontal or upright - if fitted inverted, debris may be
deposited on the seat and cause fouling of the seat when the valve operates. Check direction of
flow arrows.
5. The black plastic plugs in the body are pressure gauge connections to enable pressure
monitoring to be carried out, should the system develop a fault. It is recommended that these be
accessible (the pressure reducing valve has two - only one need be accessible).
6. Expansion relief drain pipework must be connected to a safe visible discharge point via a
tundish and the pipework must have a continuous fall.
7. The pressure reducing valve has two outlets, the second one is for a balanced cold water
supply, to a shower or a bidet (over rim type only, ascending spray type requires type
AA,AB or AD air gap) (Major shower manufacturers advise fitting a mini expansion vessel in
the balanced cold supply pipework to accomodate thermal expansion and prevent tightening of
shower controls) Using the balanced cold connection to feed bath taps can reduce the
flow available to the unvented cylinder. The balanced cold supply is blanked off.
NOTE: If the unit has been commissioned and is to be unused for more than 8 weeks it is
advisable to turn off the cold supply and draw off approximately 5 litre of water through a hot
tap. NB The cold supply must be opened prior to use.
The Benchmark Log Book enclosed with the cylinder should be completed after
commissioning the system and handed to the customer for future reference.
MAINTENANCE
Under normal circumstances the "MULTIBLOC" combination control valve should not require any
maintenance. However, annual inspection and / or cleaning of the integral line strainer, pressure
reducing valve, cartridge, expansion relief valve cartridge and seating may be necessary depending
on local water conditions.
Pressure reducing valve
1. Isolate cold water supply.
2. Unscrew the retaining nut of the valve.
The complete operating mechanism,
including the strainer can be removed.
3. Clean the filter mesh and the cartridge
under running water.
4. Replace cartridge ensuring that strainer is
correctly located and reassemble the unit.