manuals.online logo
Brands
  1. Home
  2. •
  3. Brands
  4. •
  5. Westell
  6. •
  7. Switch
  8. •
  9. Westell A99-BAI-ACSF-UGKIT Configuration guide

Westell A99-BAI-ACSF-UGKIT Configuration guide

WESTELL.COM
Ethernet Switch Upgrade Kit Install Instructions
A99-BAI-ACSF-UGKIT
Step-by-Step Process
The following instructions describes how to eld install a second 6
port Ethernet switch into Access Point cabinet, part number
A99-APC1BAI-ACSF.
Note: Access Point cabinets, part number A99-APC1BAI-ACSF that
are revision V and below must have the 2nd Ethernet switch installed
in the vacant AP2 radio location. Each method is described within this
document.Access Point cabinets, part number A99-APC1BAI-ACSF that
are revision W and above can have the 2nd Ethernet switch installed
above the rst Ethernet switch using the existing DIN rail.
Contents include one each of the following:
• 6 port GigE Ethernet switch, part number A90-ESP8266G
• 1 Gig 20Km 1310 Nm SFP, part number A90-SFP01G-20-31
• 2 meter LC to LC SM ber patch cord
• 20” Red 14 AWG wire
• 20” Black 14 AWG wire
• 60” Green 14 AWG wire
• 20” spiral sleeving
Cauon:
Remove Power Before Aempng to Service
• Prepare the frame ground wire
• Strip 1/4” of insulation from the green frame ground wire
Step B: Wire power & frame ground to the Ethernet
Switch
• Important - Remove Power - from the cabinet before service
• Attached the power and frame ground wires to the Ethernet
Switch
• Attach the red 14 AWG wire to the +-V input of the A PWR
connector
• Attach the black 14 AWG wire to the G input of the A PWR
connector
• Attach the green 14 AWG wire to the FG input of the A PWR
connector
Step C1: Install 2nd Ethernet Switch using plate
method for part number A99-APC1BAI-ACSF
revision V and below.
Step A: Prepare the power & frame ground wires
• Prepare the power cord
• Strip 1/4” of insulation from the red and black wires
• Cut the spiral sleeving to 16” and install over red and black wires
Page 1 of 3
*Note: This upgrade kit is only applicable with BA AC cabinet part number A99-APC1BAI-ACSF revision W and above.
WESTELL.COM
Ethernet Switch Upgrade Kit Install Instructions
A99-BAI-ACSF-UGKIT
Page 2 of 3
Copyright © 2016 by Westell, Inc. All Rights Reserved. Westell, ClearLink, Kentrox, and Optima
Management System are registered trademarks of Westell, Inc. All other names are trademarks of their
respective owners. Information is correct at time of printing and is subject to change without notice.
Westell, Inc. is an Equal Opportunity/Afrmative Action employer.
WESTELL.COM
Ethernet Switch Upgrade Kit Install Instructions
A99-BAI-ACSF-UGKIT
Step 2: Install the second Ethernet switch over the rst and re-
install the DIM rail stop
Step D: Connect power and frame ground
• Route and connect the green 14 AWG wire from the Ethernet
switch to the frame ground of the cabinet
• Route and connect the black 14 AWG wire from the Ethernet
switch to the bottom row terminal strip (GND) of the DC power
supply. Install in an open position next to the existing black wire
Step E: Verify work and re-apply power
• Double check the installation and wiring of the second
Ethernet switch
• Re-apply power to the cabinet
Customer & Technical Services
If Technical or customer assistance is required, contact Westell by
calling or using one of the following options:
• Call: (800) 377-8766
• Email: support@westell.com
Warranty & Repairs
Westell warrants this product to be defect-free at shipment time.
Westell also warrants this product to be fully functional for the
time period specied by the terms and conditions governing the
sale of the product. Equipment repairs/modication attempts by
an unauthorized person will void the warranty.
030-300732 rB 04/29/16
Page 3 of 3
Step C2: Install 2nd Ethernet Switch using plate
method for part number A99-APC1BAI-ACSF
revision W and above.
Step 1: Remove the existing end stop from the Ethernet DIN rail
• Route and connect the red 14 AWG wire from the Ethernet
switch to the top row terminal strip (48DC) of the DC power
supply. Install in an open position next to the existing red
wire

Popular Switch manuals by other brands

Atop EHG75 series user manual

Atop

Atop EHG75 series user manual

Cabletron Systems SmartCell 6A000 user guide

Cabletron Systems

Cabletron Systems SmartCell 6A000 user guide

Samson 4746 Mounting and operating instructions

Samson

Samson 4746 Mounting and operating instructions

BAZZ SWTCHWFW1 instructions

BAZZ

BAZZ SWTCHWFW1 instructions

Vimar Eikon instruction sheet

Vimar

Vimar Eikon instruction sheet

Dungs CPI 400 installation manual

Dungs

Dungs CPI 400 installation manual

Articona 567889 Quick installation guide

Articona

Articona 567889 Quick installation guide

D-Link DES-1018DG manual

D-Link

D-Link DES-1018DG manual

KROHNE OPTISWITCH 5200C operating instructions

KROHNE

KROHNE OPTISWITCH 5200C operating instructions

Sonoff DIY BASIC Series user manual

Sonoff

Sonoff DIY BASIC Series user manual

Vega VEGAVIB 63 operating instructions

Vega

Vega VEGAVIB 63 operating instructions

PCB Piezotronics IMI SENSORS EX686B01 Installation and operating manual

PCB Piezotronics

PCB Piezotronics IMI SENSORS EX686B01 Installation and operating manual

Perle RPS820 quick start guide

Perle

Perle RPS820 quick start guide

Moxa Technologies PT-G7509 Hardware installation guide

Moxa Technologies

Moxa Technologies PT-G7509 Hardware installation guide

Cisco CBS Series Get to know

Cisco

Cisco CBS Series Get to know

Giacomini K500 quick start guide

Giacomini

Giacomini K500 quick start guide

Emerson XWEB300D Installation

Emerson

Emerson XWEB300D Installation

Conrad 97 21 56 operating instructions

Conrad

Conrad 97 21 56 operating instructions

manuals.online logo
manuals.online logoBrands
  • About & Mission
  • Contact us
  • Privacy Policy
  • Terms and Conditions

Copyright 2025 Manuals.Online. All Rights Reserved.