whl-445 Rev. 000 Rel. 014 Date 7.21.20
5
C. Field Wiring 30
D. Line Voltage Wiring for Standard Boiler 30
E. Alarm Connections 31
F. Low Voltage Connections for Standard Boiler 31
G. Thermostat 31
H. Outdoor Sensor 31
I. Indirect Sensor 31
J. Optional 0-10 Volt Building Control Signal 31
K. Optional High Gas Pressure Switch 32
L. Optional Low Gas Pressure Switch 32
M. Optional Flow Switch 32
N. Optional UL353 Low Water Cut-O Interface Kit 32
O. Wiring of Cascade System Communication Bus 32
P. Cascade Master Pump and Sensor Wiring 33
Q. Cascade Follower Pump and Sensor Wiring 33
Part 8 - Gas Connections 35
A. Gas Piping 36
B. Gas Table 36
C. Check Inlet Gas Pressure 37
D. Boiler Gas Valve 38
Part 9 - Start-Up Preparation 39
A. Check / Control Water Chemistry 39
B. Check for Gas Leaks 39
C. Freeze Protection (When Used) 39
D. Fill and Test Water System 39
E. Purge Air from Water System 40
F. Check Thermostat Circuit(s) 40
G. Condensate Removal 40
H. Final Checks Before Starting Boiler 40
I. Setting Up a Single Boiler 40
J. Setting Up a Cascaded System 41
K. Lockout Condition 41
L. Cascade System Programming 41
Part 10 - Start-Up Procedure 42
A. Control Overview 42
B. Navigation of the Display 42
C. Operating Instructions 42
D. Programming Boiler Settings 42
E. Programming the System Setting 43
F. System Setting Program Navigation 43
G. Resetting the Maintenance Schedule 46
Part 11 - Start-Up Procedures for the Installer 46
A. Boiler Control Status Menu 46
B. Cascade Menu 48
C. Boiler Test Mode 49
Part 12 - Troubleshooting 49
A. Boiler Error and Fault Codes 49
B. Boiler Error 49
C. Boiler Fault 49
D. User Interface Display 50
Part 13 - Maintenance 55
A. Procedures 55
B. Combustion Chamber Coil Cleaning Instructions 55
C. Cleaning Water Side of Heat Exchanger 56
Part 14 - Installation Checklist 57
Part 15 - Maintenance Report 57
Part 16 - Replacement Parts 59
Limited Warranty 63
Maintenance Notes 65
Customer Installation Record Form 66
Part 1 - General Safety Information
This boiler is approved for indoor installations only and is not
intended for use as a pool heater. Clearance to combustible
materials: 0” top, bottom, sides, and back. Left side has all boiler
mechanical connections. Boiler must have room for service: 24”
front is minimum recommended service clearance. (A combustible
Installer - Read all instructions in this manual before installing.
Perform steps in the given order.
User - This manual is for use only by a qualied heating installer /
service technician. Have this boiler serviced / inspected annually by
a qualied service technician.
FAILURE TO ADHERE TO THE GUIDELINES ON THIS PAGE
CAN RESULT IN SUBSTANTIAL PROPERTY DAMAGE, SEVERE
PERSONAL INJURY, OR DEATH.
NOTE: If the boiler is exposed to the following, do not operate.
Immediately call a qualied service technician.
1. Fire
2. Damage
3. Water
Failure to follow this information could result in property damage,
severe personal injury, or death.
DO NOT USE THIS BOILER IF ANY PART HAS BEEN SUBMERGED
IN WATER. Immediately call a qualied service technician. The
boiler MUST BE replaced if it has been submerged. Attempting to
operate a boiler that has been submerged could create numerous
harmful conditions, such as a potential gas leakage causing a re
and/or explosion, or the release of mold, bacteria, or other harmful
particulates into the air. Operating a previously submerged boiler
could result in property damage, severe personal injury, or death.
NOTE: Boiler damage due to ood or submersion is considered an
Act of God, and IS NOT covered under product warranty.
Altering any Westinghouse boiler with parts not manufactured by
Westinghouse WILL INSTANTLY VOID the boiler warranty and could
result in property damage, personal injury, or death.
NOTE: Obey all local codes. Obtain all applicable permits before
installing the boiler.
NOTE: Install all system components and piping in such a manner
that does not reduce the performance of any re rated assembly.
Do not use this boiler for anything other than its intended purpose
(as described in this manual). Doing so could result in property
damage and WILL VOID product warranty.
High heat sources (sources generating heat 100oF / 37oC or greater,
such as stove pipes, space heaters, etc.) may damage plastic
components of the boiler as well as plastic vent pipe materials. Such
damages ARE NOT covered by warranty. It is recommended to keep
a minimum clearance of 8” from high heat sources. Observe heat
source manufacturer instructions, as well as local, state, provincial,
and national codes, laws, regulations and ordinances when installing
this boiler and related components near high heat sources.
door or removable panel is acceptable front clearance.) This boiler has
been approved for closet installation and installation on combustible
ooring. Do not install directly on carpeting. Install the boiler in a
location where temperature and pressure relief valve discharge or
a leak will not result in damage to the surrounding area. Use only
Category IV vent systems.
Due to low water content of the boiler, improperly sizing the boiler
in regard to potable water heating load will result in excessive boiler
cycling and accelerated component failure.Westinghouse DOES NOT
warrant failures caused by improperly sized boiler applications. DO
NOT oversize the boiler to the system. Modular boiler installations
greatly reduce the likelihood of boiler oversizing.