
TIMED FLOW STAINLESS STEEL KNEE/FOOT VALVE
INSTALLATION INSTRUCTIONS
Step 1
Unpack the foot valve, make sure all parts are included and no damage is present.
Step 2
Flush the water supply line to clear any debris.
Step 3
This valve requires 2 mounting holes. If the holes do not exist, mark out and drill as shown in Figure 1.
Step 4
Secure the valve in place using chosen xings through the mounting holes.
Step 5
Apply thread sealant or thread tape to the inlet side of the valve, ensuring it does not obscure the opening. Connect your cold or tempered
water exible hose to the inlet side of the valve. Water must travel in the direction of the arrow as shown in Figure 2.
Step 6
Apply thread sealant or thread tape to the outlet side of the valve, ensuring it does not obscure the opening. Connect your exible hose to the
outlet side of the valve. Place the coloured indicator in the top of the valve head.
Step 7
Once the exible hoses are connected to your water source and spout, turn on water supply and test the functionality of the valve by pushing
the top assembly in. Check for any leaks.
Step 8
To adjust the timed flow, carefully remove the indicator from the top assembly. The cartridge has 315 degrees of adjustment. Adjust the position
of the timing adjuster using a 3mm allen key. Test timed flow. Adjust and test again until the desired timed flow is achieved. Place the appropriate
coloured indicator back in place.
TIMED FLOW MAY VARY ACCORDING TO WATER PRESSURE, FLOW RATE AND TEMPERATURE
Congratulations! You have just purchased one of the premium products from 3monkeez commercial tapware range which has been
manufactured to Australian Standard AS/NZS3718.
• Valve must be installed by a qualied plumber in accordance with the Plumbing Code of Australia (PCA), AS/NZS3500 and the
Manufacturer’s instructions
• All pipework must be thoroughly ushed to remove any debris prior to installation as foreign materials may cause damage to internal parts
and affect performance
• If the unit is replacing an existing unit please ensure the water supply is turned off. It is recommended that isolating stop taps are tted to
the inlet connection
SCOPE OF APPLICATION
INSTALLATION INSTRUCTIONS
P-3MSS-FVTF
Note: Please follow the below procedures. If the below procedures are not followed it
may impact the life of some components and void warranties.
IMPORTANT INFORMATION
Figure 1 Figure 2
60
Inlet Side Outlet Side
Connections 1/2” MI BSP Thread
Working Pressure Range 50kPa - 500kPa (Maximum Pressure - 500kPa)
Recommended Operating Temperature 5-70 Degrees Celcius
Finish Satin Stainless Steel
TECHNICAL INFORMATION
CARTON CONTENTS - 1x Adjustable Timed Flow Knee Operated/Foot Operated Knee Valve,
1x Installation Instructions