Important Installation Highlights
Failure To Comply With These Items Will Greatly
Compromise The Functionality Of The Bathing Unit And May
Void The Warranty.
•The bathing system is to be installed AFTER all construction and
finish work is completed. The abrasive nature of drywall dust and
construction debris can damage the mechanical components and
finish of the system. If the unit is installed during construction, it is
the installer’s responsibility to ensure the system is adequately
protected from such contaminants.
•Flush Hot and Cold water lines prior to connecting to bathing system.
Debris left in the water lines can cause valve failure.
•Allow bathing system to reach room temperature before plugging it
in. Electric components can be sensitive to extreme temperatures.
•Before attempting to remove the side panels, first remove the thumb
screws located behind the personnel access doors located in the
center of each panel.

SolaresTM Smart Spa Installation Manual
CD0037 -3- 1121
Plumbing and Electrical Codes
All states and municipalities may differ extensively in their plumbing and electrical
codes. Therefore, it is Apollo Corporation’s recommendation that you check with
the proper enforcement agencies in your area before installation.
All Apollo bathing systems are manufactured with built-in backflow prevention.
However, due to different plumbing codes, it is advisable that you ask your installer
whether there is a need to install additional backflow prevention valves (such as
RPZ valves) on any new construction.
NOTE
•Lock Out or Tag Out electrical circuit for bathing system BEFORE
installation.
•Electrical Protection: Class 1 Type B applied part.
•Bathing system installation must comply with all applicable building
and health codes and regulations.
•It is recommended that hot water not greater than 120°F (49°C) be
delivered to the bathing system.

SolaresTM Smart Spa Installation Manual
CD0037 -4- 1121
Apollo SolaresTM Smart Spa Specifications
Recommended Room Size:
Without Rapid FillTM
With Rapid FillTM
70 in (177.8 cm) wide, 128 in (320.0 cm) long
70 in (177.8 cm) wide, 134 in (340.4 cm) long
Dimensions:
Length
Width
Height
Tub:
74.8 in (190.0 cm)
34.9 in (88.6 cm)
46.1 in (117.1 cm)
Rapid Fill:
17.9 in (45.5 cm)
55.0 in (139.7 cm)
85.0 in (215.6 cm)
Secure GlideTM Carrier:
41.8 in (106.2 cm) max
with footrests
28.1 in (71.4 cm)
44.4 in (112.8 cm)
Installed Length:
Door Closed
Door Open
Without Rapid FillTM:
74.8 in (190.0 cm)
103.1 in (261.9 cm)
With Rapid FillTM:
79.6 in (202.2 cm)
107.9 in (274.1 cm)
Component Weight:
Tub
Rapid FillTM
Secure GlideTM
485 lb. (220 kg)
185 lb. (84 kg)
64 lb. (29 kg)
Total Shipping Weight:
752 lb. (341 kg) [SolaresTU] –970 lb. (440 kg) [SolaresSRTU]
Installation Time:
2 Hours
Inspection & Adjustments:
1 Hour
Rapid FillTM Water Capacity:
70 gal (265 L)
Water Supply:
Requires (2) 0.75 in garden hose thread (GHT) wall mounted faucets. Minimum of 30 PSI (2.1
bar) for hot and cold required.
Water Connection:
Provided with two 60 in (152.4 cm), 300 PSI (20.7 Bar) EPDM hoses with 0.75 in GHT ends.
Waste:
2 in PVC schedule 40 pipe. Outside diameter 2.4 in (6.1 cm).
Electrical:
Dedicated 115 VAC plug-in receptacle protected by a 15A GFCI circuit breaker (not supplied).
Tub Fill:
Electrically controlled ASSE 1016 certified Thermoscopic mixing valve.
Shower:
Handheld with 84 in (213.4 cm) ANSI A112.18.1 hose
Tub Entry:
Door with 25.4 in (64.5 cm) opening where residents are transferred into tub.
Gasket:
D-shaped, ASTM D2000, solid EPDM extrusion;
Whirlpool Pump Motor:
0.75 HP, 110-120VAC, 60 Hz, 7 A, 92.5 GPM max flowrate
Whirlpool Jets:
5 aerated whirlpool jets with adjustable nozzles; 2 non-adjustable, high-flow water ports
Whirlpool Water Requirement:
70 gal minimum required to run whirlpool jets without resident
Temperature Reading Specs.:
Accuracy: Manifold- ± 1°F, Tank- ± 2°F *assumes correct calibration; Range: 5°F to 200°F precision:1°F
Scale Accuracy/ Range/ Precision
Accuracy: ± 1% *assumes correct calibration and chair offset; Range: 0 To 500lbs. Precision:1lb.
Expected Service Life:
10 years
Secure GlideTM Transfer System
Carrier:
Black hammertone powder coat painted aluminum
Casters:
Two heavy duty, medical grade, stainless steel ball bearing, total locking swivel casters with
5 in (12.7 cm) non-marring wheels. Two heavy duty, medical grade, stationary non-marring
wheels.
Chair:
Black anodized aluminum frame with grey antimicrobial Kydex thermoplastic chair.
Safety Straps:
Two flexible Polyurethane thermoplastic safety straps
Capacity:
500 lb. (227 kg)
Safety Locks:
Single primary latch to release chair from carrier base. Dual spring-loaded secondary locks
released with stainless steel handle.
*Specifications subject to change

SolaresTM Smart Spa Installation Manual
CD0037 -5- 1121
Symbol Definitions
Acceptable storage temperature range.
Acceptable storage humidity range.
Consult accompanying documents
Protective Earth
AC and DC Current

SolaresTM Smart Spa Installation Manual
CD0037 -6- 1121
Bathing Room Preparation
!WARNING!
-Choose flattest possible floor location. Floor must not slope more than ¼
in (6.35 mm) per 12 in (304.8 mm) for Secure GlideTM Transfer System to
operate correctly.
-Use of this equipment adjacent to or stacked with other equipment should
be avoided because it could result in improper operation. If such use is
necessary, this equipment and the other equipment should be observed to
verify that they are operating normally
-Portable RF communications equipment can affect medical electrical
equipment. Such equipment should be used no closer than 12” from the
tub.
CAUTION
Bathing room characteristics, including room dimensions, door sizes and
floor drain placement, must comply with all applicable building and health
codes.
NOTE
•Clearance of 18 in (46 cm) or more is recommended for ease of use
and serviceability.
•A floor drain is recommended in the bathing room in case an
emergency tub evacuation is required. Drain should not be in a
location that will interfere with resident transfer.
•Be sure Rapid FillTM system does not cover switches, valves, or other
items that must be reached by personnel.

SolaresTM Smart Spa Installation Manual
CD0037 -7- 1121
Bathing System Dimensions

SolaresTM Smart Spa Installation Manual
CD0037 -8- 1121
Electrical/Pluming Service Installation
NOTE
•Electrical outlet must be protected by a separate 15A GFCI breaker.
•Most codes require electrical to be located above the water supply.
•Minimum required water pressure is 30 PSI (2.1 Bar) for both hot and cold
water supply.
•Images below show the recommended locations for the electrical and water
supply. Electrical and water supply can be located anywhere within the
enclosed area.
Bathing System WITH Rapid FillTM Option

SolaresTM Smart Spa Installation Manual
CD0037 -9- 1121
Electrical/Plumbing Service Installation, Cont.
Bathing System WITHOUT Rapid FillTM Option

SolaresTM Smart Spa Installation Manual
CD0037 -10- 1121
Tub Leveling
•The bathing system has four leveling feet (or six for a system with
Rapid FillTM) located at the corners of the frame.
•Use an 11/16” wrench to adjust the leveling feet. Turn the nut
clockwise to drop the foot down (raise the tub) and counterclockwise
to lift the foot up (lower the tub).
•When adjusting the level at the front of the tub, only adjust the foot
on the side where the floor is lower. The frame on the higher side
should always be ~3.3 in (8.4 cm) off the ground. See images below:

SolaresTM Smart Spa Installation Manual
CD0037 -11- 1121
Tub Leveling, Cont.
•The most important thing is that the tub is adjusted high enough off
the floor for the transfer device frame to pass underneath and dock
without making contact. If the rear wheels of the carrier fall into a
valley, such as a floor drain, when docking it may be necessary to
lower the frame below the nominal 3.3” to ensure a smooth transfer.
•Once the front of the tub is level, finish leveling the tub by adjusting
either (or both) of the feet at the back of the tub. For best results tilt
the tub to its highest position and place a level along the rails inside
the tub. To do this:

SolaresTM Smart Spa Installation Manual
CD0037 -12- 1121
oPower on the tub.
oTap on “Bathing menu”, tap on “Tub Tilt”, and hold the up
arrow until the tub stops raising.
•It’s worth noting that leveling is for drainage purposes. If the tub
cannot be perfectly leveled due to an extreme slope in the floor it is
acceptable to just get it as close to level as possible.
•Make sure all leveling feet make firm contact with the ground.

SolaresTM Smart Spa Installation Manual
CD0037 -13- 1121
Tub Drain Preparation and Connection
Typical Drain Connections:
•PVC hard plumbed connection.
•Rubber flexible coupler connection.
•Drain terminates into floor sink.
Note: Drain line must not be located more than a
¼” off the floor for proper drainage.
PVC Hard Plumbed Example

SolaresTM Smart Spa Installation Manual
CD0037 -14- 1121
Rubber Flexible Coupler Example

SolaresTM Smart Spa Installation Manual
CD0037 -15- 1121
Floor Sink Example

SolaresTM Smart Spa Installation Manual
CD0037 -16- 1121
Remedy Bulb Installation
•Remove UV bulbs from inside of tub. Note: Don’t touch the glass
section of the bulbs with your fingers as the oil left behind will
shorten the life of the bulb.
•Remove the side panel on each side of the tub by opening the access
panel and removing the thumb screw to the rear of the cutout. You’ll
also need to remove the side panel trim on the left side of the tub to
install the upper bulb. (See Side Panel Trim Removal for detailed
instructions.)
•Slide the UV bulbs into the Remedy Chambers behind the tub. It’s
important to keep them parallel with the inside of the chamber to
prevent damaging the quartz tube inside.
•Connect the cables coming off the rear most electrical box to the
bulbs.
•Thread the UV Bulb Retainer Plug located on the cable into the end
of the chamber. Fitting should be just snug enough to prevent it from
threading out as this fitting only serves to keep the bulbs from sliding
out of the tube. Overtightening will increase the likelihood of
accidently loosening the adjacent fitting when the bulbs are serviced
in the future.

SolaresTM Smart Spa Installation Manual
CD0037 -17- 1121
Side Panel Trim Removal Instructions
1. Ensure tub is raised up to highest position.
2. Remove side panel by opening access panels and removing thumb screw located towards
back side of cutout.
3. Remove screws securing lower part of frame (Detail B) and let front of frame rotate
downward.
4. Remove screws shown in Detail A while supporting frame.
5. Pull frame down and out to remove from tub.
6. When ready to reinstall start by tucking front of trim into front edge of tub.
7. Slide trim up until top edge of trim is recessed behind tub shell.
8. Align rear slots of frame with threaded inserts in the back of the frame as seen in Detail A
and loosely install the screws.
9. Lift the front edge of the frame up until the slots line up with the holes located towards
the front of the frame as shown in Detail B.
10.Lightly thread in screws.
11.Adjust frame in or out so that lines up well with the tub shell and secure all the screws.