ADB L-807 User manual

L-807 Wind Cone
Style I-A, I-B, II, Size 1 and Size 2
User Manual
96A0345
Retain for future use.
Rev. K, 4/29/13
ETL Certified to FAA Specification
AC 150/5345-27 (Current Version)
and
FAA Engineering Brief 67
(Current Version)

L-807 Wind Cone 96A0345 Rev. K
History of Change 4/29/13
© 2011 ADB Airfield Solutions All Rights Reservedii
Disclaimer Table of
Contents Safety Introduction
History of
Change
Installation Operation Parts Schematics
Disclaimer
This manual could contain technical inaccuracies or typographical errors. ADB Airfield Solutions reserves the right to
revise this manual from time to time in the contents thereof without obligation of ADB Airfield Solutions to notify any
person of such revision or change.
Details and values given in this manual have been compiled with care. They are not binding, however, and ADB
Airfield Solutions disclaims any liability for damages or detriments suffered as a result of reliance on the information
given herein or the use of products, processes or equipment to which this manual refers. No warranty is made that
the use of the information or of the products, processes or equipment to which this manual refers will not infringe any
third party's patents or rights.
Warranties
LED Products of ADB Airfield Solutions manufacture are guaranteed against mechanical, electrical, and physical
defects for a period of four years after the date of installation and are guaranteed to be merchantable and fit for the
ordinary purposes for which such products are made.
ADB Airfield Solutions will correct by repair or replacement, at its option, equipment or parts which fail because of
mechanical, electrical or physical defects, provided that the goods have been properly handled and stored prior to
installation, properly installed and properly operated after installation, and provided further that Buyer gives ADB
Airfield Solutions written notice of such defects after delivery of the goods to Buyer. Refer to the Safety section for
more information on Material Handling Precautions and Storage precautions that must be followed.
ADB Airfield Solutions reserves the right to examine goods upon which a claim is made. Said goods must be
presented in the same condition as when the defect therein was discovered. ADB Airfield Solutions further reserves
the right to require the return of such goods to establish any claim.
ADB Airfield Solutions’ obligation under this guarantee is limited to making repairor replacement within a reasonable
time after receipt of such written notice and does not include any other costs such as the cost of removal of defective
part, installation of repaired product, labor or consequential damages of any kind, the exclusive remedy being to
require such new parts to be furnished.
ADBAirfieldSolutions’liabilityundernocircumstanceswillexceedthecontractpriceofgoodsclaimedtobedefective.
Any returns underthis guaranteeare to be on a transportation charges prepaid basis. For products not manufactured
by, but sold by ADB Airfield Solutions, warranty is limited to that extended by the original manufacturer.
This is ADB AirfieldSolutions’ sole guaranteeand warranty with respect tothegoods; there are noexpress warranties
or warranties of fitness for any particular purpose or any implied warranties of fitness for any particular purpose or any
implied warranties other than those made expressly herein. All such warranties being expressly disclaimed.
Trademarks
General notice: other product names used here are for identification purposes only and may be trademarks of their
respective companies.
Proprietary Information
This information carrier contains proprietary information, which shall not be used for other purposes than those for
which it has been released, nor be reproduced or disclosed to third parties without the prior written consent of ADB
Airfield Solutions.
Nopartofthispublicationmaybereproduced,storedinaretrievalsystem, or transmittedinanyformor by any means,
mechanical, photocopy, recording, or otherwise, without the prior written permission of ADB Airfield Solutions. No
patent liability is assumed with respect to the use of the information contained herein. Neither is any liability assumed
for damages resulting from the use of the information contained herein.
ADB Airfield Solutions shall not be liable to the purchaser of this product or third parties for damages, losses, costs,
or expenses incurred by purchaser or third parties as a result of accident, misuse, or abuse of this product or
unauthorized modifications, repairs, or alterations to this product. ADB Airfield Solutions shall not be liable against
any damages arising from the use of any options or parts other than those designated as approved products.
Copyright ©2011 by ADB Airfield Solutions. All rights reserved.
a.1 History of Change
PAGE REV DESCRIPTION EC NO. CHECKED APPROVED DATE
All E Updated parts and diagrams for APS 2987 JR DM 11/17/10
All F Updated maintenance, parts and diagrams 3/30/08
All G Updated schematics, maintenance and parts sections DR ER 1/9/09
All H Added Rotating Power Supply Parts
Added Kit install instructions 2297 DR ER 11/06/09
I Added new diagrams, pictures and parts DR ER 09/14/10
10x-11x J Updated parts and schematics DR ER 05/24/11
All K Updated incandescent and LED info and parts. 3852/3822 DR ER 04/23/13

96A0345 Rev. K L-807 Wind Cone
4/29/13 TOC
© 2011 ADB Airfield Solutions All Rights Reserved iii
Schematics Parts Operation Installation Introduction
TOC Safety Table of
Contents Disclaimer
TABLE OF CONTENTS
a.1 History of Change ................................................................................................. ii
1.0: Safety...................................................................................................................1
1.1 To use this equipment safely ................................................................................1
1.1.1 Additional Reference Materials .....................................................................1
1.1.2 Qualified Personnel ......................................................................................1
1.1.3 Intended Use ................................................................................................1
1.1.4 Storage .........................................................................................................1
1.1.4.1 Operation............................................................................................. 2
1.1.4.2 Material Handling Precautions............................................................. 2
1.1.4.3 Action in the Event of a System or Component Malfunction................ 2
1.1.4.4 Maintenance and Repair...................................................................... 2
1.1.4.5 Operation of Overloaded Regulators................................................... 2
2.0: L-807 Introduction...............................................................................................3
2.1 Compliance with Standards ..................................................................................3
2.2 Uses ......................................................................................................................3
2.3 Features ................................................................................................................3
2.4 Lighting Assembly - LED .......................................................................................3
2.5 Lighting Assembly - Incandescent ........................................................................3
2.6 Operation ..............................................................................................................4
2.6.1 FAA Wind Cone Classifications ....................................................................4
2.7 Electrical Supply ....................................................................................................4
2.7.1 LED Current Driven ......................................................................................4
2.7.2 LED Voltage Driven ......................................................................................4
2.8 Dimensions ...........................................................................................................5
2.8.1 Internally Lighted ..........................................................................................5
2.8.2 Externally Lighted .........................................................................................5
2.8.3 Packing .........................................................................................................5
2.9 L-807 Wind Cone: Required Equipment ...............................................................6
2.10 Lighted Wind Cones ............................................................................................7
2.10.1 Externally Lighted Wind Cones ..................................................................7
2.10.2 Internally Lighted Wind Cone .....................................................................7
2.11 Unlighted Wind Cones ........................................................................................8
3.0: L-807 Wind Cone Installation.............................................................................9
3.1 Unpacking .............................................................................................................9
3.2 Tools/Equipment/Supplies Needed .......................................................................9
3.3 Mounting the Foundation ......................................................................................9
3.4 Assembly Procedures .........................................................................................12
3.4.1 L-807 Center Hinge-Pole Assembly ...........................................................12
3.4.2 L-807 Bottom Hinge-Pole Assembly ...........................................................14
3.4.2.1 Assembling Wind Cone Sock Cage................................................... 15
3.4.2.2 Assembling the Cage Assembly to the Shaft..................................... 16
3.5 Internally Lighted LED Wind Cone Kit Installation ...............................................17
3.5.1 Installing Rotary Power Assembly ..............................................................17
3.5.2 Installing the Internal LED Light Assembly .................................................19
3.6 Externally Lighted LED Wind Cone Kit Installation .............................................20
3.6.1 Installing Rotary Power Assembly ..............................................................20
3.6.2 Installing the External LED Light Assembly ................................................21
3.7 Assembling Wind Cone Shaft into Wind Cone Pole ............................................22
3.8 Attach the Windsock ...........................................................................................22
3.9 Optional Roof Mounting ......................................................................................23
3.10 Tether Mounting ................................................................................................24
3.11 Grounding the Wind Cone Pole ........................................................................24

L-807 Wind Cone 96A0345 Rev. K
TOC 4/29/13
© 2011 ADB Airfield Solutions All Rights Reservediv
Disclaimer Table of
Contents Safety Introduction
TOC Installation Operation Parts Schematics
3.12 Installation of FAA Light Bases – PA4 and L-830/831 Applications ..................25
4.0: Maintenance.......................................................................................................27
4.1 Lighted Wind Cones ............................................................................................27
4.1.1 Lubrication ..................................................................................................27
4.1.2 Structure .....................................................................................................27
4.1.3 Wind Cone Sock and Cage ........................................................................27
4.1.4 Wiring ..........................................................................................................27
4.1.5 Lowering the Pole Assembly ......................................................................27
4.1.6 Miscellaneous .............................................................................................27
4.2 Rotating Power Supply Bearing Replacement ....................................................28
4.2.1 Disassembly Instructions ............................................................................28
4.2.2 Assembly Instructions .................................................................................29
4.3 Replacing an LED Light Assembly ......................................................................30
4.4 Troubleshooting ...................................................................................................31
4.4.1 Voltage powered LED Wind Cone ...........................................................31
4.4.2 Current powered LED Wind Cone ...........................................................31
4.4.3 Part Replacement .......................................................................................31
4.5 Schematics .........................................................................................................32
5.0: Parts ..................................................................................................................43
5.1 Internally Lighted Halogen Wind Cone ................................................................44
5.2 Power Adapter Parts List .....................................................................................44
5.3 Internally Lighted LED Wind Cone ......................................................................45
5.4 Internally Lighted Halogen Wind Cone ................................................................47
5.5 Wind Cone Rotating Power Supply Assembly .....................................................49
5.6 Wind Cone Cages ...............................................................................................51
5.7 Possible Spare Parts ...........................................................................................53
5.7.1 Wind Cone LED Light Engine, Obstruction Light and Power Supply Board Replace-
ment Guide ..........................................................................................................55

96A0345 Rev. K L-807 Wind Cone
4/29/13 Safety
© 2011 ADB Airfield Solutions All Rights Reserved 1
Schematics Parts Operation Installation Introduction
Safety Safety Table of
Contents Disclaimer
1.0 Safety This section contains general safety instructions for installing and using ADB Airfield Solutions equipment. Some
safety instructions may not apply to the equipment in this manual. Task- and equipment-specific warnings are
included in other sections of this manual where appropriate.
1.1 To use this
equipment safely
1.1.1 Additional Reference
Materials • C22.1 Canadian Electrical Code (latest rev)
• NFPA 70B, Electrical Equipment Maintenance.
• NFPA 70E, Electrical Safety Requirements for Employee Workplaces.
• ANSI/NFPA 79, Electrical Standards for Metalworking Machine Tools.
• OSHA 29 CFR, Part 1910, Occupational Health and Safety Standards.
• National and local electrical codes and standards.
1.1.2 Qualified Personnel The term qualified personnel is defined here as individuals who thoroughly understand the equipment and its safe
operation, maintenance and repair. Qualified personnel are physically capable of performing the required tasks,
familiar with all relevant safety rules and regulations and have been trained to safely install, operate, maintain and
repair the equipment. It is the responsibility of the companyoperating this equipment to ensurethat its personnel meet
these requirements.
Always use required personal protective equipment (PPE) and follow safe electrical work practices.
1.1.3 Intended Use
ADB Airfield Solutions cannot be responsible for injuries or damages resulting from nonstandard, unintended
applications of its equipment. This equipment is designedand intended only for the purpose described in this manual.
Uses not described in this manual are considered unintended uses and may result in serious personal injury, death
or property and equipment damage. Unintended uses may result from taking the following actions:
• Making changes to equipment that are not recommended or described in this manual or using parts that are not
genuine ADB Airfield Solutions replacement parts.
• Failing to make sure that auxiliary equipment complies with approval-agency requirements, local codes and all
applicable safety standards.
• Using materials or auxiliary equipment that are inappropriate or incompatible with ADB Airfield Solutions
equipment.
• Allowing unqualified personnel to perform any task.
1.1.4 Storage
WARNING
Read installation instructions in their entirety before starting installation.
• Refer to the FAA Advisory Circular AC 150/5340-26, Maintenance of Airport Visual Aids Facilities, for
instructions on safety precautions.
• Observe all safety regulations. To avoid injuries, always disconnect power before making any wiring
connections or touching any parts. Refer to FAA Advisory Circular AC 150/5340-26.
• Become familiar with the general safety instructions in this section of the manual before installing,
operating, maintaining or repairing this equipment.
• Read and carefully follow the instructions throughout this manual for performing specific tasks and
working with specific equipment.
• Make this manual available to personnel installing, operating, maintaining or repairing this equipment.
• Follow all applicable safety procedures required by your company, industry standards and government
or other regulatory agencies.
• Install all electrical connections to local code.
• Use only electrical wire of sufficient gauge and insulation to handle the rated current demand. All wiring
must meet local codes.
• Route electrical wiring along a protected path. Make sure they will not be damaged by moving
equipment.
• Protect components from damage, wear, and harsh environment conditions.
• Allow ample room for maintenance, panel accessibility, and cover removal.
• Protect equipment with safety devices as specified by applicable safety regulations.
• If safety devices must be removed for installation, install them immediately after the work is completed
and check them for proper functioning prior to returning power to the circuit.
WARNING
Using this equipment in ways other than described in this manual may result in personal injury, death or
property and equipment damage. Use this equipment only as described in this manual.
CAUTION
If equipment is to be stored prior to installation, it must be protected from the weather and kept free of
condensation and dust.
Failure to follow this instruction can result in injury or equipment damage.

L-807 Wind Cone 96A0345 Rev. K
To use this equipment safely 4/29/13
© 2011 ADB Airfield Solutions All Rights Reserved2
Disclaimer Table of
Contents Safety Introduction
To use this
equipment
Installation Operation Parts Schematics
1.1.4.1 Operation
1.1.4.2 Material Handling
Precautions
1.1.4.3 Action in the Event of a
System or Component
Malfunction
1.1.4.4 Maintenance and Repair
1.1.4.5 Operation of
Overloaded Regulators
WARNING
• Only qualified personnel, physically capable of operating the equipment and with no impairments in
their judgment or reaction times, should operate this equipment.
• Read all system component manuals before operating this equipment. A thorough understanding of
system components and their operation will help you operate the system safely and efficiently.
• Before starting this equipment, check all safety interlocks, fire-detection systems, and protective
devices such as panels and covers. Make sure all devices are fully functional. Do not operate the
system if these devices are not working properly. Do not deactivate or bypass automatic safety
interlocks or locked-out electrical disconnects or pneumatic valves.
• Protect equipment with safety devices as specified by applicable safety regulations.
• If safety devices must be removed for installation, install them immediately after the work is completed
and check them for proper functioning.
• Route electrical wiring along a protected path. Make sure they will not be damaged by moving
equipment.
• Never operate equipment with a known malfunction.
• Do not attempt to operate or service electrical equipment if standing water is present.
• Use this equipment only in the environments for which it is rated. Do not operate this equipment in
humid, flammable, or explosive environments unless it has been rated for safe operation in these
environments.
• Never touch exposed electrical connections on equipment while the power is ON.
CAUTION
This equipment may contain electrostatic sensitive devices.
• Protect from electrostatic discharge.
• Electronic modules and components should be touched only when this is unavoidable e.g. soldering,
replacement.
• Before touching any component of the cabinet you should bring yourbody to the same potential as the
cabinet by touching a conductive earthed part of the cabinet.
• Electronic modules or components must not be brought in contact with highly insulating materials such
as plastic sheets, synthetic fiber clothing. They must be laid down on conductive surfaces.
• The tip of the soldering iron must be grounded.
• Electronic modules and components must be stored and transported in conductive packing.
WARNING
• Do not operate a system that contains malfunctioning components. If a component malfunctions, turn
the system OFF immediately.
• Disconnect and lock out electrical power.
• Allow only qualified personnel to make repairs. Repair or replace the malfunctioning component
according to instructions provided in its manual.
WARNING
Allow only qualified personnel to perform maintenance, troubleshooting, and repair tasks.
• Onlypersonswhoareproperlytrainedandfamiliarwith ADB Airfield Solutionsequipmentare permitted
to service this equipment.
• Disconnect and lock out electrical power.
• Always use safety devices when working on this equipment.
• Follow the recommended maintenance procedures in the product manuals.
• Do not service or adjust any equipment unless another person trained in first aid and CPR is present.
• Connect all disconnected equipment ground cables and wires after servicing equipment. Ground all
conductive equipment.
• Use only approved ADB Airfield Solutions replacement parts. Using unapproved parts or making
unapproved modifications to equipment may void agency approvals and create safety hazards.
• Check interlock systems periodically to ensure their effectiveness.
• Do not attempt to service electrical equipment ifstanding water is present. Use caution when servicing
electrical equipment in a high-humidity environment.
• Use tools with insulated handles when working with electrical equipment.
WARNING
• Operation of a Regulator while overloaded at any step may result in equipment failure or equipment
damage.

96A0345 Rev. K L-807 Wind Cone
4/29/13 L-807 Introduction
© 2011 ADB Airfield Solutions All Rights Reserved 3
Schematics Parts Operation Installation Introduction Safety Table of
Contents Disclaimer
2.0 L-807
Introduction
2.1 Compliance with
Standards FAA: L-807 & L-807(L) AC 150/5345-27 (Current Edition) and the FAA Engineering Brief No.
67 “Light Sources other than Incandescent and Xenon for Airport Lighting and Obstruction
Lighting Fixtures.” ETL Certified.
2.2 Uses Provides visual surface wind direction and velocity information to pilots in flight or on the
ground at airports and heliports.
2.3 Features •The L-807 wind cone is a non-frangible designed wind cone available in three styles,
lighted (internal or external) or unlighted, and in two sizes, eight- or twelve-foot wind
socks.
•Pole is available with either a center hinge or bottom hinge. Center hinge allows easier
pole lowering. Bottom hinge includes a swing-out support leg that allows the mast to be
lowered to a convenient servicing height for light source replacement.
•The LED lighted wind cone assemblies may be powered directly from a 2.8-6.6 A or 8.5-
20 A series circuit using only an isolation transformer. No power adapter is needed,
significantly reducing CCR load. It may also be powered from a direct 95-264 VAC
source. LED light output stays constant regardless of input current range (for series
powered) or input voltage level (for voltage powered) wind cones.
•Any AC voltage-powered incandescent wind cone may be powered from a 6.6 A or 20 A
series circuit using an ADB power adapter or from a direct 120 VAC source.
•Sealed bearings allow precision vane operation for true wind direction in all types of
weather and wind conditions.
•Bearing covers are provided for additional bearing protection against dirt and moisture.
•The nylon fabric sock is treated for water repellency and resistance to rot and mildew.
•Standard colors are orange or orange/white banded and the colorfastness exceeds
Method 5671 of Federal Standard 191. Other colors are available as a special order.
•An optional L-810(L) red LED obstruction light is available (see catalog sheet 2063). For
wind cone configurations available with an LED L-810(L), see ordering code.
2.4Lighting Assembly
- LED — The internally lighted wind cone provides an average illumination on the top and
lateral surface of a fully extended windsock of 10- to 30-ft lamberts. The internally
lighted 8-foot wind cone uses one LED optical assembly and the 12-ft uses three LED
optical assemblies.
— The externally lighted wind cone provides a minimum illumination of 2 foot candles on
the upper surface of the fully extended windsock. The externally lighted 8- and 12-foot
wind cones use two LED optical assemblies.
— The wind sock is illuminated with orange LEDs and is used only on solid orange
colored wind socks.
2.5Lighting Assembly
- Incandescent — The internally lighted wind cone consists of two 100 W/
120 VAC lamps for an 8-foot wind cone or three 100 W/
120 VAC lamps for a 12-foot wind cone
— An incandescent lighted wind cone cage may be provided with an optional L-810(L)
LED red obstruction light.
— The incandescent wind cone can be used on any solid colored or color-banded wind
sock.
WARNING
Read the instructions in their entirety before starting installation or attempting any
maintenance.

L-807 Wind Cone 96A0345 Rev. K
Operation 4/29/13
© 2011 ADB Airfield Solutions All Rights Reserved4
Disclaimer Table of
Contents Safety Introduction Installation Operation Parts Schematics
2.6 Operation The operation of the wind cone is entirely dependent on the direction and relative velocity of
the surface wind. Movement of the wind through the open throat of the cage and into the sock
causes the tail to inflate. The tail of the inflated sock indicates true wind direction for velocities
as low as three knots through a 360° circle about the vertical shaft.
2.6.1 FAA Wind Cone
Classifications
2.7 Electrical Supply
2.7.1 LED Current Driven For 6.6 A or 20 A, 60 Hz circuits, a 150 W or 200 W L-830 transformer with appropriate
primary input (i.e. 6.6 or 20 A) must be selected. Use 150 W or 200 W L-831 series
for 50 Hz circuits.
2.7.2 LED Voltage Driven
Size 1: 8 foot
Size 2: 12 foot
Style I-A: Externally Lighted
Style I-B: Internally Lighted
Style II: Unlighted
L-807 LED Fixture Load Isolation
Transformer Isolation Load
Transformer CCR Load
Internally Lit, 8-ft
Without L-810 79VA 150W 18VA 97VA
With LED L-810(L) 87VA 150W 20VA 107VA
Externally Lit, 8-ft
Without L-810 87VA 200W 26VA 113VA
With LED L-810(L) 102VA 200W 27VA 129VA
Internally Lit, 12-ft
Without L-810 96VA 20W 25VA 121VA
With LED L-810(L) 110VA 200W 23VA 133VA
Externally Lit, 12-f
Without L-810 87VA 200W 26VA 113VA
With LED L-810(L) 102VA 200W 27VA 129VA
Input voltage: 95V AC (min.) - 264V AC (max.), 50/60Hz
8-foot Internally Lit Externally Lit
Maximum input power:
Without L-810 69VA 80VA
With LED L-810(L) 75VA 87VA
12 foot Internally Lit Externally Lit
Maximum input power:
Without L-810 95VA 80VA
With LED L-810(L) 109VA 87VA

96A0345 Rev. K L-807 Wind Cone
4/29/13 Dimensions
© 2011 ADB Airfield Solutions All Rights Reserved 5
Schematics Parts Operation Installation Introduction Safety Table of
Contents Disclaimer
2.8 Dimensions
2.8.1 Internally Lighted
2.8.2 Externally Lighted
Figure 1: L-807 Heights
2.8.3 Packing
Wind Cone Type Overall Height Height 1 Height 2
Halogen 8 ft 232.25 in (589.9 cm) 40.25 in (102.2 cm) 192 in (487.7 cm)
Halogen 12 ft 250.25 in (635.6 cm) 48.25 in (122.5 cm) 192 in (487.7 cm)
LED 8 ft 245.2 in (622.8 cm) 53.2 in (135.1 cm) 192 in (487.7 cm)
LED 12 ft 263.4 in (669.0 cm) 71.4 in (181.4 cm) 192 in (487.7 cm)
Wind Cone
Type Overall Height Height 1 Height 2 Height 3 Height 4
LED 8 ft 245.2 (622.8) 11.2 (28.5) 23.9 (60.7) 18 (45.7) 192 (487.7)
LED 12 ft 267.5 (679.5) 15.5 (61.2) 24.1 (127) 36 (91.4) 192 (487.7)
35.4
72.9
17.7
Overall Height
Height 1
Height 2
Description Quantity Per Box Dimensions
(H x W x D) Weight lb/kg
8-ft. Wind Cone
Lighted 1 Pole
1 Basket
16.6 x 10 x 10 in / 502.9 x 25.4 x 25.4 cm
20 x 20 x 15 in / 50.8 x 50.8 x 38.1 cm
150 lb / 68 kg
47 lb / 21.3 kg
8-ft. Wind Cone
Unlighted 1 Pole
1 Basket
16.6 x 10 x 10 in / 502.9 x 25.4 x 25.4 cm
20 x 20 x 15 in / 50.8 x 50.8 x 38.1 cm
135 lb / 61.2 kg
42 lb / 19.1 kg
12-ft. Wind Cone
Lighted
1 Pole
1 Basket
Hardware
16.6 x 10 x 10 in / 502.9 x 25.4 x 25.4 cm
45 x 42 x 6 in / 114.3 x 106.7 x 15.2 cm
20 x 20 x 15 in / 50.8 x 50.8 x 38.1 cm
150 lb / 68 kg
47 lb / 21.3 kg
45 lb / 20.4 kg
12-ft. Wind Cone
Unlighted
1 Pole
1 Basket
Hardware
16.6 x 10 x 10 in / 502.9 x 25.4 x 25.4 cm
45 x 42 x 6 in / 114.3 x 106.7 x 15.2 cm
20 x 20 x 15 in / 50.8 x 50.8 x 38.1 cm
135 lb / 61.2 kg
42 lb / 19.1 kg
45 lb / 20.4 kg

L-807 Wind Cone 96A0345 Rev. K
L-807 Wind Cone: Required Equipment 4/29/13
© 2011 ADB Airfield Solutions All Rights Reserved6
Disclaimer Table of
Contents Safety Introduction Installation Operation Parts Schematics
2.9 L-807 Wind Cone:
Required Equipment Refer to Table 1 for required equipment that is supplied. Refer to Table 2 for required
equipment that is not supplied. Refer to the Parts section for ordering information.
Table 1: Required Equipment Supplied
Table 2: Required Equipment Not Supplied
Description Quantity
L-807 wind cone assembly 1
Instruction manual 1 per order
Description Quantity
Wrenches for 3/8 inch, 1/2 inch, and 5/8 inch hex screws and nuts 3
Allen hex keys for 5/64 inch, 3/16 inch and 1/4 inch 3
Medium size blade screwdriver 1
Cloth for cleaning lamps As required
Grease gun 1
Saw Horse 1

96A0345 Rev. K L-807 Wind Cone
4/29/13 Lighted Wind Cones
© 2011 ADB Airfield Solutions All Rights Reserved 7
Schematics Parts Operation Installation Introduction Safety Table of
Contents Disclaimer
2.10 Lighted Wind
Cones
2.10.1 Externally Lighted
Wind Cones The externally lighted LED assembly consists of a cluster of two LED light engine
assemblies.
Figure 2: Externally Lighted L-807 Wind Cone with Obstruction Light (Side View)
2.10.2 Internally Lighted
Wind Cone The internally lit LED assembly design consists of one (for 8-foot) and three (for the 12-foot)
LED light engine assemblies that are mounted directly on the throat ring of the wind cone’s
cage assembly. LED light engines are pre-focused at the factory.
Figure 3: Internally Lighted L-807 Wind Cone with Obstruction Light (Side View)
WC807-22E00 SHOWN
44A6878-1 L-807 WIND CONE HINGED POLE ASSY FOR LED INT/EXT LIT
94A0531-XXX LED Wind Cone Externally Lit Kit
44A6454-12 12 FT WIND CONE CAGE ASSEMBLY
ANCHOR BOLT 27" KIT
94A0152
Insure the wind cone is
grounded. See details
Figure 9, Figure 8,
Figure 14 and Figure 15.
WC807-12B30 SHOWN
SBOL-XXXX
44A6878-1 L-807 WIND CONE HINGED POLE ASSY FOR LED INT/EXT LIT
94A0500-XXX LED Internal Wind Cone Assembly Kit
44A6454-8 8 FT WIND CONE CAGE ASSEMBLY
ANCHOR BOLT 27" KIT
94A0152
Insure the wind cone is
grounded. See details
Figure 9, Figure 8,
Figure 14 and Figure 15.

L-807 Wind Cone 96A0345 Rev. K
Unlighted Wind Cones 4/29/13
© 2011 ADB Airfield Solutions All Rights Reserved8
Disclaimer Table of
Contents Safety Introduction Installation Operation Parts Schematics
2.11 Unlighted Wind
Cones The unlighted L-807 wind cones may include the L-810 obstruction light as an option.
A pipe cap is provided for unlighted wind cone assemblies without the L-810 option to cover
the top opening on the bearing and cage shafts.
Figure 4: Unlighted L-807 Wind Cone
WC807-12000 SHOWN
44A6878-2 L-807 WINDCONE HINGED POLE UNLIT without SBOL
44A6454-8 8 FT WIND CONE CAGE ASSEMBLY
ANCHOR BOLT 27" KIT
94A0152
Insure the wind cone is
grounded. See details
Figure 9, Figure 8,
Figure 14 and Figure 15.

96A0345 Rev. K L-807 Wind Cone
4/29/13 L-807 Wind Cone Installation
© 2011 ADB Airfield Solutions All Rights Reserved 9
Schematics Parts Operation Installation Introduction
L-807 Wind
Cone Instal-
Safety Table of
Contents Disclaimer
3.0 L-807 Wind
Cone Installation
This section describes instructions for installing the L-807 wind cone.
3.1 Unpacking The equipment is shipped ready for installation. Handle equipment very carefully to prevent
component damage. Unpack the carton upon receipt and check the contents and their
condition. Note any exterior damage to the carton that might lead to detection of equipment
damage.
If you note any damage to any equipment, file a claim with the carrier immediately.
The carrier may need to inspect the equipment.
3.2 Tools/Equipment/
Supplies Needed The following are the tools, equipment, and supplies needed to install the L-807 wind cone:
•Wrenches for 3/8 in., 1/2 in., and 5/8 in. hex screws and nuts
•Allen hex keys for 5/64 in., 3/16 in. and 1/4 in.
•Medium size blade screwdriver
•Cloth for cleaning lamps
•Grease gun
•Sawhorse
3.3 Mounting the
Foundation When installed on a structure or building, the wind cone must be tethered. Also see FAA AC
150/5340-30 for addition mounting information.
Refer to the guidelines below when mounting the wind cone on the base.
See Figure 5. Put the L-807 wind cone on a concrete base.
NOTE: The concrete base is at least six 90-lb bags entrained with ¾ aggregates producing
3000 psi (20,684 KN•m2) after 20 days.
Slope the top of the concrete base downward from the 8-in. (203.2 mm) diameter bolt circle
for drainage.
Place the 1-inch (25.4 mm) diameter electrical conduit in the hole in the center of the wind
cone base. (Also see Figure 7.)
Use the four equally spaced 1-in. (25.4 mm) diameter anchor bolt holes in the bolt circle as
centers for locating the four 5/8-in. (15.875 mm) x 27-in. (685.8-mm) long anchor bolts.
(Also see Figure 7.)
NOTE: The wind cone foundation in Figure 5 is given as only a general guide. The engineer
or contractor has the responsibility to determine the dimensions and type of
foundation demanded by the soil conditions at the installation site.
WARNING
Read the instructions in their entirety before starting installation.
Check interlock systems periodically to ensure their effectiveness.
Do not attempt to service electrical equipment if standing water is present. Use
caution when servicing electrical equipment in a high-humidity environment.
Use tools with insulated handles when working with electrical equipment.
Allow only qualified personnel to perform the following tasks. Observe and follow
the safety instructions in this document and all other related documentation.

L-807 Wind Cone 96A0345 Rev. K
Mounting the Foundation 4/29/13
© 2011 ADB Airfield Solutions All Rights Reserved10
Disclaimer Table of
Contents Safety Introduction
Mounting
the Founda-
Installation Operation Parts Schematics
Figure 5: Locating the Center Hinge-Pole Anchor Bolts
Ref: 117A0054
Figure 6: 44A6683-2
18.00
18.00
(4) 5/8-11 J-BOLTS @ 90° EACH
ON A 8.00 BOLT CIRCLE∅
1/2-13 ATTACH HARDWARE
3 PLACES
THE WINDCONE POLE MUST BE GROUNDED
PER LOCAL CODE REQUIREMENTS
GROUND LUG PROVIDED AS SHOWN
CONDUIT LOCATED ON
CL OF BOLT CIRCLE
5/8-11 HEX BOLT, FLATWASHER & SPLIT
LOCKWASHER
CONTRACTOR PROVIDED
A
A
DETAIL B
DETAIL C
SECTION A-A
DETAIL C
DETAIL B
35.4
72.9
17.7
192
264 IN
L-807 SZ 2 WITH SBOL
Ground
Strap
44A6883-2
Install as
Shown
NOTE: Level by adjusting
the bolts.
Prevailing Wind is
toward the hinge.
This prevents
slack/snaps as the
wind cone is lowered.
Insure the wind cone is
grounded. See details
Figure 9 and Figure 8.
Prevailing Wind.
5.00 NOM
44A6883/2
TERM RING 12-10AWG 1/4 NOINSUL
TERM RING 12-10AWG 1/4 NOINSUL
WIRE, COPPER BRAID, 13/64", TUBULAR X 6 LG

96A0345 Rev. K L-807 Wind Cone
4/29/13 Mounting the Foundation
© 2011 ADB Airfield Solutions All Rights Reserved 11
Schematics Parts Operation Installation Introduction
Mounting
the Founda-
Safety Table of
Contents Disclaimer
Figure 7: Installing the Pole Support Base
Ref: 117A0054
Insure there is room to adjust the nuts to level the pole. Use the eight nuts to level the pole.
Figure 8: Center Hinge-Pole Leveling
18 IN
SLOPE THE TOP OF THE CONCRETE BASE
TO PROVIDE ADEQUATE DRAINAGE
60 IN MIN
18.00 REF
KIT 94A0152
5/8-11 X 27 IN
ANCHOR BOLT 1.25 IN.
1 INCH
CONDUIT
4.50 IN.
ANCHOR
BOLTS
1 INCH ELECTRICAL
CONDUIT
CONTRACTOR SUPPLIED
8-inch bolt circle
Leave at least 1-in below bolt for leveling
4-in
Torque the hex nuts to 40/42 foot-pounds
18-inch
60-inch
30-inch
Ground Wire 6 AWG min.

L-807 Wind Cone 96A0345 Rev. K
Assembly Procedures 4/29/13
© 2011 ADB Airfield Solutions All Rights Reserved12
Disclaimer Table of
Contents Safety Introduction
Assembly
Procedures
Installation Operation Parts Schematics
3.4 Assembly
Procedures This subsection describes procedures for installing the assemblies listed below.
•L-807 wind cone
•Sock lighting assembly
•Optional sock lighting assembly and obstruction light
•Optional obstruction light only
3.4.1 L-807 Center Hinge-
Pole Assembly NOTE: Check the packing list with the parts list to verify that all parts are present before
proceeding. Refer to the Parts section for part numbers.
To assemble the L-807 wind cone, perform the following procedure:
Install the pole assembly by performing the following procedure:
NOTE: Coat threads with anti-seize paste
1. See Figure 9. Bolt the L-807 lower hinge-pole base onto the foundation.
2. Level the base and tighten the mounting bolts.
Figure 9: Assembling Wind Cone – typical all center hinge-pole styles
CAUTION
See Figure 7. If the concrete pad is sloped, for example, to drain water away from
the anchor bolts, place contractor-supplied shims under the plate to prevent the
plate from being stressed during installation on the pad. Failure to use shims, if the
pad is sloped or tapered, could cause the base plate to crack immediately, or in
the future, after tightening the four mounting hex nuts on the anchor bolts.
1/2-13 HX NUT
1/2 FLATWASHER
1/2 SPLIT LOCKWASHER
3/4 FLEXIBLE LIQ TIGHT CONDUIT X 18 IN
44A6876-2
TOP TUBE WELD ASSEMBLY
44A6876-1
BOTTOM TUBE WELD ASSEMBLY
60A4060
L-807 WINDCINE HINGED POLE WINCH ATTACH BAR
72A0010
GROUND LUG
5/8 FLATWASHER
5/8 SPLIT LOCKWASHER
5/8 HEX NUT
44A7193
SS CABLE ASSY 7/32" DIAM AND 12' LONG
60A4062
L-807 WIND CONE HINGED POLE ADAPTER
60A4059
WINDCONE HINGED POLE WINCH MTG BRACKET
61A0450
BRAKE WINCH DUTTON-LAINSON DLB1205A
3/8-16 X 5 X 1 HX HD
3/8-16 HX NUT
3/8 SPLIT LOCKWASHER
3/8 FLATWASHER
1/2-13 X 2 HEX HD
1/2 FLATWASHER
44A6883-2
LED WC HINGE GROUND STRAP
44A6883-1
LED WINDCONE LWR GND STRAP
ANCHOR BOLT 27" KIT
60A4063
L-807 WINDCONE HINGE PIN
BOLT 1/2-13 X 5 X 1.25 HX HD
1/2-13 X 2 HEX HD
1/2 FLATWASHER
GROUND STRAP
BOLT 1/2-13 X 2.5 X 1.25 HX HD
1/2-13 HX NUT
5/8 FLATWASHER
1/2 SPLIT LOCKWASHER
Ref: 44A6878
Insure the wind cone is
grounded. See details
Figure 9 and Figure 8.
Attach Earth Grounding Lug here
Ground
Strap
44A6883-2

96A0345 Rev. K L-807 Wind Cone
4/29/13 Assembly Procedures
© 2011 ADB Airfield Solutions All Rights Reserved 13
Schematics Parts Operation Installation Introduction
Assembly
Procedures
Safety Table of
Contents Disclaimer
3. Connect the center hinge-pole top and bottom assemblies.
4. Pull the wires up through the flexible conduit and through the top of the hinge-pole
assembly. With the pole lowered, there should be 8 to 10-inches (200 mm - 254 mm) of
slack in the cable.
5. Assemble the winch and cable assembly.
NOTE: Use the appropriate wiring information in “Schematics ” on page 32 for external
wiring guidance. The wind cone hinge ground strap must be installed. The wind cone
must be Earth grounded at the base. See “Grounding the Wind Cone Pole” on page 24.
6. Prepare the wind cone assembly. See: “Assembling Wind Cone Sock Cage” on page 15.

L-807 Wind Cone 96A0345 Rev. K
Assembly Procedures 4/29/13
© 2011 ADB Airfield Solutions All Rights Reserved14
Disclaimer Table of
Contents Safety Introduction
Assembly
Procedures
Installation Operation Parts Schematics
3.4.2 L-807 Bottom Hinge-
Pole Assembly NOTE: Check the packing list with the parts list to verify that all parts are present before
proceeding. Refer to the Parts section for part numbers.
Install the pole assembly by performing the following procedure:
NOTE: Coat threads with anti-seize paste.
1. See Figure 10. Bolt the L-807 bottom hinge-pole base onto the foundation.
2. Level the base and tighten the mounting bolts.
Figure 10: Assembling Wind Cone – bottom hinge-pole styles
3. Pull the wires up through the flexible conduit and through the top of the pole assembly.
Leave several feet of wire to connect the wind cone cage assembly and lights.
4. Connect the tether, if used.
5. Connect the raising cord and hardware.
NOTE: Use the appropriate wiring information in “Schematics ” on page 32 for external wiring
guidance. The wind cone must be Earth grounded at the base. See “Grounding the
Wind Cone Pole” on page 24.
6. Raise the pole and then lower it, to insure proper operation.
7. Prepare the wind cone assembly. See: “Assembling Wind Cone Sock Cage” on page 15.
CAUTION
See Figure 7. If the concrete pad is sloped, for example, to drain water away from
the anchor bolts, place contractor-supplied shims under the plate to prevent the
plate from being stressed during installation on the pad. Failure to use shims, if the
pad is sloped or tapered, could cause the base plate to crack immediately or in the
future after tightening the four mounting hex nuts on the anchor bolts.
GLUE GASKETS TO POLE, PLACING ONE
GASKET AT THE BOTTOM OF THE SUPPORT ARM ASSY
AND ONE GASKET AT THE TOP OF THE SUPPORT
ARM ASS'Y. THE TOP GASKET SHOULD BE PLACED BETWEEN
THE SUPPORT ARM ASS'Y AND POLE WHEN THE SUPPORT
ARM ASS'Y IS EXTENDED 90 DEGREES.
TORQUE TO 42/45 FT-LBS IN THE FIELD1/2-13 HEX NUT
WHEN HEX NUT IS TIGHTENED INSURE THAT
THE SUPPORT ARM ASS'Y MOVES FREELY SO
THAT SUPPORT ARM SWINGS AWAY FROM MAST
NOTE:
WITHOUT FORCE.
AGAINST POLE WITH EYEBOLT
TIGHTEN BOLT & LOCKWASHER
POSITIONED AS SHOWN.
NOTE:
62C0302
POLE SUPPORT BASE
44B0943
SUPPORT ARM ASS'Y
63A0333
GASKET
63A0333
GASKET
65A0041-15
NYLON ROPE
POLE WELDMENT SUB ASS'Y
44D0710
62B0319 ROPE CLEAT
64A0173-20 SCREW 1/4-20 x 1 1/4 LG S.S.
66A0026-24 WASHER LOCK 1/4 I.D. S.S.
5/8-11 HEX BOLT, FLATWASHER & SPLIT LOCKWASHER
CONTRACTOR PROVIDED
1.25 - inch
(31.75 mm)
Ground Lug
Ref: 44D0940
Conduit (1-inch)
Prevailing Wind is
toward the hinge.
This prevents
slack/snaps as the
wind cone is lowered.
Use 6 AWG for Earth
Ground.
Attach Earth Ground
Lug here.

96A0345 Rev. K L-807 Wind Cone
4/29/13 Assembly Procedures
© 2011 ADB Airfield Solutions All Rights Reserved 15
Schematics Parts Operation Installation Introduction
Assembly
Procedures
Safety Table of
Contents Disclaimer
3.4.2.1 Assembling Wind Cone
Sock Cage The sock cage assembly is comprised of the following items: throat ring, mid ring, trail ring
and associated connector straps. Assembling these items together is accomplished by using
the ¼-20 x 7/8 Long, Socket Button Head screws, ¼ lock washer, and ¼-20 hex nut,
mounting hardware supplied.
1. Fasten the two bearing L-shaped support straps to the throat ring (the largest diameter
ring) using the pre-drilled holes in the ring and the strap. Install the “L- end” of the two
straps to the throat ring 180 degrees apart. Turn the short leg of the strap outward.
Tighten all screws and nuts.
2. Fasten the mid ring (next smallest diameter ring) to the next set of holes in the bearing
support straps away from the throat ring. Tighten all screws and nuts.
3. Fasten the trail end ring (smallest diameter ring) to the far end of the strap. Tighten all
screws and nuts.
4. Fasten the other two straight support straps to all three rings by using the remaining holes
in each of the rings. Tighten all screws and nuts.
5. Next fasten the bearing mounting plate at right angles to the bearing support strap and
fasten these to items to the L-shaped support strap using a ¼-20 flat head screw and hex
nut. Tighten the flat head screw and nut. Place the bearing on the mounting pad with the
shaft collar where the set screws are located, pointing toward the center line of the cage,
and fasten with the 3/8-16 screw, heavy flat washer, and 3/8-16 hex nut. Tighten all
hardware.
Figure 11: L-807 - 8 ft WC Cage Assembly Diagram
44A6454/8
A
Typical bearing install 8 and 12 ft
75A0027-1 MODIFIED BEARING
75A0027 UNMODIFIED BEARING
TYP 4 PLACES EACH RING
DETAIL A
SCALE 1 : 2
65A0015/24
1/4-20 HX NUT, SS
66A0026/24
1/4 SPLIT LOCKWASHER
1/4-20 X 1 FLAT HEAD PHIL
65A0015/24
1/4-20 HX NUT, SS
66A0026/24
1/4 SPLIT LOCKWASHER
60A3082
BEARING MOUNTING PAD
60A4066-1
WC SHAFT L-807 8FT UNLIT
63A0332-1
WEATHER SHIELD
60A3079-1
8 FT THROAT 18 DIA RING
60A3083-8
8 FT CAGE BEARING SUPPORT STRAP
65A0015-29
3/8-16 HX NUT
66A0026-29
3/8 SPLIT LOCKWASHER
3/8-16 X 1 3/4 HEX BOLT
66A0026-29
3/8 SPLIT LOCKWASHER
66A0015-17
#10 FLATWASHER (x2)
63A0332-1
WEATHER SHIELD
77A0066
1 1/4 NPT PIPE CAP
60A3082
BEARING MOUNTING PAD
60A3080-8
8 FT CAGE BEARING SUPPORT
1/4-20 X 1 FLAT HEAD PHIL
65A0015/24
1/4-20 HX NUT, SS
66A0026/24
1/4 SPLIT LOCKWASHER
60A3080-8
8 FT CAGE
BEARING SUPPORT
60A3079-2
8 FT THROAT 16.25 DIA RING
60A3079-3
8 FT THROAT 14.5 DIA RING
60A3081-8
8 FT CAGE SUPPORT STRAP
Modified Bearing
has hole for bolt to mount the
external light assembly bar
Ref: 44A6454

L-807 Wind Cone 96A0345 Rev. K
Assembly Procedures 4/29/13
© 2011 ADB Airfield Solutions All Rights Reserved16
Disclaimer Table of
Contents Safety Introduction
Assembly
Procedures
Installation Operation Parts Schematics
Figure 12: L-807 - 12 ft WC Cage Assembly Diagram
3.4.2.2 Assembling the Cage
Assembly to the Shaft 1. See Figure 11
2. Slide the first bearing onto the shaft followed by a weather shield onto the shaft. Push the
seal down against the bearing. Slide the next bearing followed by a weather shield. Push
the shield down against the bearing. Separate the two bearings so that the wind cone
cage assembly can be fastened to the L-Shaped straps on the cage assembly. Using the
mounting hardware supplied, fasten the cage assembly to the bearings. Tighten all
screws and nuts.
3. Position the cage assembly so the first bearing is within 1/8 inch of the weather shield that
is installed on top of the pole adapter. Tighten the set screws found in the bearing collar
against the shaft.
44A6454/12
TYP 4 PLACES EACH RING
A
DETAIL A
SCALE 1 : 2
1/4-20 X 7/8 SOCKET HEAD CAP SCREW
65A0015/24
1/4-20 HX NUT, SS
66A0026/24
1/4 SPLIT LOCKWASHER
60A3079-4
12 FT THROAT 36 DIA RING
60A3079-5
12 FT THROAT 31.5 DIA RING
60A3079-6
12 FT THROAT
27 DIA RING
60A3081-12
12 FT CAGE
SUPPORT STRAP
60A3081-12
12 FT CAGE SUPPORT STRAP
60A3079-6
12 FT THROAT 27 DIA RING
60A3079-5
12 FT THROAT
31.5 DIA RING
60A3079-4
12 FT THROAT
36 DIA RING
60A3096
CAGE SUPPORT STRAP 12FT
60A3083-12
12 FT CAGE BEARING SUPPORT STRAP
77A0066
1 1/4 NPT PIPE CAP
63A0332-1
WEATHER SHIELD
75A0027-1
WC UPPER PILLOW
60A3082
BEARING MOUNTING PAD
Coat unpainted bearing surfaces with 67A0098 corrosion inhibiter,
upper and lower bearings. Protect prior to shipping.
60A3082
BEARING MOUNTING PAD
63A0332-1
WEATHER SHIELD
75A0027
WC PILLOW BRG MB#C251-5/16MHFF
Coat unpainted bearing surfaces with 67A0098 corrosion inhibiter,
upper and lower bearings. Protect prior to shipping.
60A4066-4
WC SHAFT L-80712 UNLIT & INT LIT
1/4-20 X 1 FLAT HEAD PHIL
65A0015/24
1/4-20 HX NUT, SS
66A0026/24
1/4 SPLIT LOCKWASHER
60A3080-12
12 FT CAGE
BEARING SUPPORT
Modified Bearing
has hole for bolt to mount the
external light assembly bar
BEARING MODIFIED
Ref: 44A6454
Other manuals for L-807
1
Table of contents
Popular Measuring Instrument manuals by other brands

janitza
janitza UMG 604-PRO User manual and technical data

Urrea
Urrea UD337 User manual and warranty

PCB Piezotronics
PCB Piezotronics J352C66 Installation and operating manual

VOLTCRAFT
VOLTCRAFT VC-330 operating instructions

UNITED PRODUCTS & INSTRUMENTS INC.
UNITED PRODUCTS & INSTRUMENTS INC. UNICO 1100 Service manual

Keithley
Keithley 4200-SCS Startup guide