Adva FSP 3000R7 Guide

Fiber Service Platform 3000R7
Product Release 11.1
Document Issue B (April 2012)
Installation and
Commissioning Manual

Copyright © 2001-2012 ADVA AG Optical Networking
All rights reserved. Hardware and software mentioned in this document includes software developed
by ADVA AG Optical Networking ("ADVA Optical Networking"), the Apache Software Foundation
(http://www.apache.org), Teodor Danciu (http://jasperreports.sourceforge.net), and/or other open
source software. Some software was created using ORBacus for Java by Object-Oriented Concepts,
Inc.
Trademarks
The terms ADVA™ and FSP 3000®are trademarks or registered trademarks of ADVA Optical Network-
ing in the United States, Germany and/or other countries. All other company products or services men-
tioned in this document may be trademarks or service marks of ADVA Optical Networking or their
respective owner.
Patents
The content described in this document may be covered by patents or pending patent applications of
ADVA Optical Networking. The furnishing of this document does not give you any license to these pat-
ents.
Disclaimers
Nothing in this document shall be construed as granting any license or rights with respect to its content
or the patents and trademarks mentioned above. The content of this document may include technical
inaccuracies or typographical errors, and is subject to change at any time without notice. Reliance on
this content is at the relying party's sole risk and will not create any liability or obligation for ADVA Opti-
cal Networking. Any references in this document to publications and/or Internet sites that are not from
ADVA Optical Networking are provided for convenience only and do not in any manner serve as an
endorsement of those publications and/or Internet sites. The materials within those publications and/or
Internet sites are not part of the materials for any ADVA Optical Networking information, product, or
service, and use of those publications and/or Internet sites is at your own risk.
THE CONTENT OF THIS DOCUMENT IS PROVIDED ''AS IS'' AND ANY EXPRESSED OR IMPLIED
WARRANTIES, INCLUDING, BUT NOT LIMITED TO, THE IMPLIED WARRANTIES OF MERCHANT-
ABILITY AND FITNESS FOR A PARTICULAR PURPOSE ARE DISCLAIMED. IN NO EVENT SHALL
ADVA OPTICAL NETWORKING, ITS AFFILIATES, EMPLOYEES, OFFICERS OR ITS SUPPLIERS
BE LIABLE FOR ANY DIRECT, INDIRECT, INCIDENTAL, SPECIAL, EXEMPLARY, OR CONSE-
QUENTIAL DAMAGES (INCLUDING, BUT NOT LIMITED TO, PROCUREMENT OF SUBSTITUTE
GOODS OR SERVICES; LOSS OF USE, DATA, OR PROFITS; OR BUSINESS INTERRUPTION)
HOWEVER CAUSED AND BASED ON ANY THEORY OF LIABILITY, WHETHER IN CONTRACT,
STRICT LIABILITY, OR TORT (INCLUDING NEGLIGENCE OR OTHERWISE) ARISING IN ANY
WAY OUT OF THE USE OF THIS DOCUMENT, EVEN IF ADVISED OF THE POSSIBILITY OF SUCH
DAMAGE. THE SAME APPLIES FOR ANY HARDWARE OR SOFTWARE COVERED BY THIS DOC-
UMENT, UNLESS A SIGNED AGREEMENT WITH ADVA OPTICAL NETWORKING OR THE APPLI-
CABLE PRODUCT LIABILITY LAW EXPRESSLY STATES OTHERWISE.
ADVA AG Optical Networking
Fraunhoferstr. 9a
82152 Martinsried/Muenchen
Germany
Phone +49(0)89-890665-0
Fax +49(0)89-890665-199
http://www.advaoptical.com

Installation and Commissioning Manual 3
FSP 3000R7 R11.1 80000015930 Issue B, © 2012 ADVA AG Optical Networking ADVA Confidential
Table of Contents
List of Figures . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13
List of Tables. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17
Related Documents Overview. . . . . . . . . . . . . . . . . . . . 19
Preface . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 23
Purpose and Scope . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 23
Audience . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 23
Document Revision History . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 24
Organization . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 25
Document Conventions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 27
Typographic Conventions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 27
Safety Symbol and Message Conventions . . . . . . . . . . . . . . . . . . . . . . . 28
Obtaining Documentation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 29
World Wide Web . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 29
Documentation CD . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 29
Ordering Documentation. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 29
Documentation Feedback. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 30
Obtaining Technical Assistance. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 30
Customer Portal. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 30
Technical Services . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 31
Contact ADVA Optical Networking. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 31

4Installation and Commissioning Manual
FSP 3000R7 R11.1 80000015930 Issue B, © 2012 ADVA AG Optical Networking ADVA Confidential
Acronyms and Abbreviations . . . . . . . . . . . . . . . . . . . . 33
Chapter 1 Express Setup . . . . . . . . . . . . . . . . . . . . . 43
Chapter 2 Prerequisites for Installation . . . . . . . . . 45
Audience . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 46
Safety Precautions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 46
General Safety. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 46
Electrical Safety. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 47
Eye Safety. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 49
Laser Safety . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 49
Equipment Precautions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 51
Facility Security . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 52
Personnel Requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 52
Supporting Documents and Additional Information . . . . . . . . . . . . . . . . . . . 53
Supplies and Tools Required . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 54
Adaptor Brackets . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 54
Dummy Modules . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 54
Front Cover . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 55
Power Cables. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 55
Earthing Kit. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 55
Serial and Ethernet Cables . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 55
IEEE 1394 Interface Cable. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 55
Telemetry Interface Cable. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 56
SCU-Intercom-Kit. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 56
Fiber-Optic Jumpers . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 56
Tools and Equipment Required. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 56
Tools . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 56
Electrical Test Equipment . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 56
Fiber Optic Test and Cleaning Equipment . . . . . . . . . . . . . . . . . . . . . 57
ESD Prevention Equipment . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 57
Personal Computer . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 57
Commissioning Information. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 57
Chapter 3 Site Planning and Preparation . . . . . . . . 59
Introduction. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 59
Audience . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 60
Site Planning . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 60

Table of Contents
Installation and Commissioning Manual 5
FSP 3000R7 R11.1 80000015930 Issue B, © 2012 ADVA AG Optical Networking ADVA Confidential
General Site Requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 61
FSP 3000R7 Equipment Requirements . . . . . . . . . . . . . . . . . . . . . . . . . 61
Compliance Criteria . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 61
Specifications of System Components . . . . . . . . . . . . . . . . . . . . . . . 62
Clearance Requirements. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 63
Environmental Requirements. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 63
Cooling Requirements. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 64
Heat Dissipation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 64
Airflow Considerations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 64
Power Source and Earthing Requirements . . . . . . . . . . . . . . . . . . . . . . . 65
Shelf Power System. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 65
General Requirements for the Site Wiring Systems . . . . . . . . . . . . . . 66
DC Power Requirements. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 67
AC Power Source Requirements. . . . . . . . . . . . . . . . . . . . . . . . . . . . 68
Power Cable Requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 69
DC Power Cables . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 70
AC Power Cables . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 71
System Earthing Conductor Requirements . . . . . . . . . . . . . . . . . . . . 72
Serial Cable and Ethernet Cable Requirement . . . . . . . . . . . . . . . . . . . . 72
Serial Null Modem Cable. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 73
Ethernet Straight-Through Cables and Crossover Cables . . . . . . . . . . 74
USB Cable . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 77
Telemetry Interface Cable . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 77
IEEE 1394 Interface Cable . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 78
SCU-Intercom-Kit . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 78
Fiber-Optic Cable Requirements. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 79
Fiber-Optic Jumpers. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 79
Client Interface Fiber-Optic Patch Cables . . . . . . . . . . . . . . . . . . . . . 79
Network Interface Fiber-Optic Patch Cables . . . . . . . . . . . . . . . . . . . 79
Optical Fiber Bundles . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 80
Optical Link Testing . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 80
Cabling Requirements. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 80
Requirements for Installing the OTDR. . . . . . . . . . . . . . . . . . . . . . . . . . 80
Power Supply Requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 80
Earthing Conductor Requirements . . . . . . . . . . . . . . . . . . . . . . . . . . 81
Power Cable Requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 81
Data Cable Requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 82
Fiber-Optic Cable Requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . 82
Site Preparation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 82

6Installation and Commissioning Manual
FSP 3000R7 R11.1 80000015930 Issue B, © 2012 ADVA AG Optical Networking ADVA Confidential
Shared Responsibilities . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 82
ADVA Optical Networking Responsibilities . . . . . . . . . . . . . . . . . . . . . . . 83
Customer Responsibilities . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 83
Checking the Site. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 84
Specialized Knowledge Required . . . . . . . . . . . . . . . . . . . . . . . . . . . 84
Tools Required . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 84
Associated Documentation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 85
Site Survey Checklist . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 85
Chapter 4 Unpacking and Inspecting . . . . . . . . . . . 89
Introduction. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 90
Audience . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 91
Associated Documentation. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 91
Precautions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 91
Temporary Storage . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 92
Moving to the Installation Location. . . . . . . . . . . . . . . . . . . . . . . . . . . . 92
Lifting and Carrying the 9HU shelf or 7HU shelf . . . . . . . . . . . . . . . . . . . 92
Preventing ESD Damage . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 93
Shipment Contents and Accessories . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 94
1HU shelf, 7HU shelf and 9HU shelf Shipments . . . . . . . . . . . . . . . . . . . 94
DCM Shelf, Passive Shelf and Fiber Management Shelf Shipments . . . . . . 96
Unpacking a 7HU shelf . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 97
Unpacking a 1HU Shelf . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 100
Unpacking a DCM Shelf . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 101
Unpacking a Module-Integrated DCM Shelf . . . . . . . . . . . . . . . . . . . . . . . 104
Unpacking an 1HU Passive Shelf. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 106
Unpacking an FSP 3000R7 ROADM-C40/40/2-3HU-2DC Shelf. . . . . . . . . . . 107
Unpacking an SH1HU/FIBERMANAGEMENT Shelf and an FMT/1HU Shelf . . . 109
Inspecting an FSP 3000R7 Shelf. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 111
Identifying Modules . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 114
Identifying Pluggable Transceivers . . . . . . . . . . . . . . . . . . . . . . . . . . . 116
Inspecting the FSP 3000R7 ROADM-C40/40/2-3HU-2DC Shelf . . . . . . . . . . 118
Equipment Return and Repair. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 119
Chapter 5 Installing Shelves . . . . . . . . . . . . . . . . . 121
Introduction. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 122
Audience . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 123
Associated Documentation. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 123

Table of Contents
Installation and Commissioning Manual 7
FSP 3000R7 R11.1 80000015930 Issue B, © 2012 ADVA AG Optical Networking ADVA Confidential
Installing the SH9HU, SH7HU, SH7HU-R and 1HU Equipment Shelves. . . . . 124
Fitting the ESD Connection Adaptor to a Shelf Bracket . . . . . . . . . . . . . 124
Fitting the 9HU, 7HU Shelves and 1HU Equipment Shelves with
ETSI or NEBS Brackets . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 127
Fitting a 9HU shelf with ETSI or NEBS Brackets. . . . . . . . . . . . . . . . 128
Fitting a 7HU Shelf with ETSI or NEBS Brackets . . . . . . . . . . . . . . . 131
Fitting the 1HU Equipment Shelves with ETSI or NEBS Brackets . . . . 134
Fitting the SH1HU-R/PF with ETSI or NEBS Brackets . . . . . . . . . . . . . . 137
Earthing a Shelf . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 140
Connecting a Shelf to Earth . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 142
Mounting an FSP 3000R7 Shelf into a Rack or Cabinet . . . . . . . . . . . . . 144
Connecting the Power. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 150
Connecting DC Power. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 150
Connecting AC Power. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 172
Installing a 40CSM/2HU Shelf. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 177
General Information . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 177
Fitting the 40CSM/2HU Shelf with the FIBER FINGER/2HU or
FIBER FINGER/2HU LEFT . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 178
Fitting the 40CSM/2HU Shelf with 19-inch Brackets . . . . . . . . . . . . . . . 181
Fitting the 40CSM/2HU Shelf with ETSI Brackets . . . . . . . . . . . . . . . . . 182
Fitting the 40CSM/2HU Shelf with NEBS Brackets. . . . . . . . . . . . . . . . . 184
Mounting the 40CSM/2HU Shelf into a Rack . . . . . . . . . . . . . . . . . . . . 186
Rack-Mounting the 1HU Passive Shelf . . . . . . . . . . . . . . . . . . . . . . . . . . . 187
Specialized Knowledge Required . . . . . . . . . . . . . . . . . . . . . . . . . . . . 188
Fitting the 1HU Passive Shelf with Adaptor Brackets. . . . . . . . . . . . . . . 188
Mounting the 1HU Passive Shelf into a Rack or Cabinet. . . . . . . . . . . . . 193
Rack-Mounting the DCF1HU-P Shelf . . . . . . . . . . . . . . . . . . . . . . . . . . . . 195
Specialized Knowledge Required . . . . . . . . . . . . . . . . . . . . . . . . . . . . 195
Fitting the DCF1HU-P Shelf with 19-inch, NEBS or ETSI Brackets. . . . . . 195
Mounting the DCF1HU-P to an Rack or Cabinet . . . . . . . . . . . . . . . . . . 199
Rack-Mounting the SH1HU/FIBERMANAGEMENT and the FMT/1HU Shelf . . . 202
Specialized Knowledge Required . . . . . . . . . . . . . . . . . . . . . . . . . . . . 202
Fitting the SH1HU/FIBERMANAGEMENT with 19-Inch Brackets. . . . . . . . 202
Fitting the SH1HU/FIBERMANAGEMENT with NEBS Brackets . . . . . . . . . 204
Fitting the FMT/1HU with ETSI Brackets . . . . . . . . . . . . . . . . . . . . . . . 205
Mounting the SH1HU/FIBERMANAGEMENT or the FMT/1HU into
a Rack or Cabinet . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 207
Installing Fiber Optic Cables . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 209
Installing the FSP 3000R7 ROADM-C40/40/OPM-3HU/2DC Shelf. . . . . . . . . 212
Rack Mounting the FSP 3000R7 ROADM-C40/40/OPM-3HU/2DC Shelf . . 212

8Installation and Commissioning Manual
FSP 3000R7 R11.1 80000015930 Issue B, © 2012 ADVA AG Optical Networking ADVA Confidential
Mounting a ROADM-C40/40/OPM-3HU/2DC Shelf into
a Standard 19-Inch Rack . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 214
Mounting a ROADM-C40/40/OPM-3HU/2DC Shelf into
a Standard 23-Inch Rack . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 216
Earthing the ROADM-C40/40/OPM-3HU/2DC Shelf . . . . . . . . . . . . . . . . 218
Connecting DC Power . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 219
Testing the Earth and DC Power Connections. . . . . . . . . . . . . . . . . . . . 221
Installing the OTDR. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 222
Verifying the Basic Installation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 224
Chapter 6 Installing System Modules . . . . . . . . . . 225
Introduction. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 226
Audience . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 227
Associated Documentation. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 227
Specialized Knowledge Required. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 227
Installing Power Supply Units. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 227
General Information . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 228
Safety Guidelines . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 229
Installing a PSU in the 9HU Shelf or 7HU Shelf . . . . . . . . . . . . . . . . . . 230
Installing a PSU in a 1HU Shelf . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 233
Installing Optical Modules . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 235
Installing Pluggable Transceivers . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 241
General Information . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 241
Safety Guidelines . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 242
Installing an SFP or XFP Transceiver. . . . . . . . . . . . . . . . . . . . . . . . . . 243
Installing a CFP Transceiver. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 247
Connecting a NCU to an OSCM . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 252
Removing and Inserting a Dummy Module. . . . . . . . . . . . . . . . . . . . . . . . 254
General Information . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 254
Removing a Dummy Module . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 254
Inserting a Dummy Module . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 256
Mounting and Removing Front Covers . . . . . . . . . . . . . . . . . . . . . . . . . . . 258
Mounting the SH7HU or SH9HU Front Cover . . . . . . . . . . . . . . . . . . . . 258
Removing the SH7HU or SH9HU Front Cover. . . . . . . . . . . . . . . . . . . . 259
Mounting the 40CSM/2HU Front Cover . . . . . . . . . . . . . . . . . . . . . . . . 260
Removing the 40CSM/2HU Front Cover. . . . . . . . . . . . . . . . . . . . . . . . 260

Table of Contents
Installation and Commissioning Manual 9
FSP 3000R7 R11.1 80000015930 Issue B, © 2012 ADVA AG Optical Networking ADVA Confidential
Chapter 7 Interconnecting Shelves. . . . . . . . . . . . 263
Introduction. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 264
Audience . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 264
Associated Documentation. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 264
Specialized Knowledge Required. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 265
Personal Safety and Equipment Precautions. . . . . . . . . . . . . . . . . . . . . . . 265
Personal Safety . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 265
Equipment Precautions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 266
Interconnecting Shelves . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 266
General Information . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 267
SCU Ports. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 267
SCU-S Ports . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 268
Interconnecting 7HU Shelves and 1HU Shelves using SCU Modules . . . . 268
Interconnecting 1HU Shelves with SCU-S Modules . . . . . . . . . . . . . . . . 274
Connecting the 40CSM/2HU Shelf to a FSP 3000R7 Shelf . . . . . . . . . . . . . 277
Interconnecting a ROADM-C40/40/OPM-3HU/2DC Shelf to
an FSP 3000R7 Shelf . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 281
Chapter 8 Powering Up/Down . . . . . . . . . . . . . . . 285
Audience . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 285
Switching Power On . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 285
Possible Problems after Switching Power On . . . . . . . . . . . . . . . . . . . . 286
Power Problems . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 287
Chapter 9 Connecting Optical Cables . . . . . . . . . . 289
Introduction. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 290
Audience . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 291
Associated Documentation. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 291
Specialized Knowledge Required. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 291
Safety Guidelines . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 292
Cleaning and Inspecting Fibers and Ports. . . . . . . . . . . . . . . . . . . . . . . . . 293
General Reminders and Warnings. . . . . . . . . . . . . . . . . . . . . . . . . . . . 294
Cleaning Fiber-Optic Connector Plugs . . . . . . . . . . . . . . . . . . . . . . . . . 296
Cleaning and Inspecting Connector Receptacles. . . . . . . . . . . . . . . . . . 299
Cleaning and Inspecting Fiber Jumpers. . . . . . . . . . . . . . . . . . . . . . . . 301
Dry Cleaning Technique Using Cartridge and Pocket-Style Cleaners. . 301
Dry Cleaning Technique Using Lint-Free Wipes . . . . . . . . . . . . . . . . 303
Wet Cleaning Technique Using Lint-Free Wipes . . . . . . . . . . . . . . . . 305

10 Installation and Commissioning Manual
FSP 3000R7 R11.1 80000015930 Issue B, © 2012 ADVA AG Optical Networking ADVA Confidential
Vendor-Specific Cleaning Techniques . . . . . . . . . . . . . . . . . . . . . . . 308
Cleaning MTP Fiber Cable Ends . . . . . . . . . . . . . . . . . . . . . . . . . . . 308
Providing Internal Optical Connections . . . . . . . . . . . . . . . . . . . . . . . . . . 309
Providing External Optical Connections . . . . . . . . . . . . . . . . . . . . . . . . . . 310
Providing Client Side Connections. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 310
Providing Network Side Connections . . . . . . . . . . . . . . . . . . . . . . . . . . . . 311
Interconnecting OSCM and OSFM Modules . . . . . . . . . . . . . . . . . . . . . . . . 312
Optical Fiber Connections . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 312
Fiber-Optic Cable Jumpers. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 312
Interconnecting 2OSCM-V#1630 or OSCM-V#1630 Modules in
a Dual-Fiber OSC Ring . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 312
Connecting the 2OSCM-V#1630 to the West and East OSFM+#1630. 314
Connecting the OSCM-V#1630s to the West and East OSFM+#1630s 315
FSP 3000R7 ROADM-C40/40/2-3HU-2DC and FSP 3000R7 Optical Cabling . 315
Network Element Connections . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 315
FSP 3000R7 ROADM-C40/40/2-3HU-2DC to FSP 3000R7 Connections . . 317
FSP 3000R7 Module Interconnections . . . . . . . . . . . . . . . . . . . . . . . . . 319
Chapter 10 Commissioning the Shelves . . . . . . . . . 321
Audience . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 322
Special Knowledge Required. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 322
Associated Documentation. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 322
Required Information . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 322
Tool Requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 322
Commissioning the NE. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 323
Managing the Shelf ID. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 324
Usage Guidelines . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 324
Configuring the ID Number for Shelves Using a LCD Display . . . . . . . . . 325
Unlocking the Shelf ID . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 325
Setting Up the Shelf ID . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 326
Locking the Shelf ID in Service . . . . . . . . . . . . . . . . . . . . . . . . . . . 326
Configuring the ID Number for Shelves Using a 7-Segment Display . . . . 327
Connecting to the Network Element . . . . . . . . . . . . . . . . . . . . . . . . . . . . 328
Connecting a PC to the Serial Interface. . . . . . . . . . . . . . . . . . . . . . . . 329
Connecting a PC to the USB Interface. . . . . . . . . . . . . . . . . . . . . . . . . 329
Connecting a PC to the Ethernet Interface (Direct). . . . . . . . . . . . . . . . 334
Finding the NE IP Address. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 335
Connecting a PC to the Ethernet Interface (Network) . . . . . . . . . . . . . . 335
Using Terminal Emulation Programs . . . . . . . . . . . . . . . . . . . . . . . . . . . . 336

Table of Contents
Installation and Commissioning Manual 11
FSP 3000R7 R11.1 80000015930 Issue B, © 2012 ADVA AG Optical Networking ADVA Confidential
Creating a Serial HyperTerminal Connection . . . . . . . . . . . . . . . . . . . . 336
Starting an Existing HyperTerminal Connection . . . . . . . . . . . . . . . . 342
Creating a Serial PuTTY Connection . . . . . . . . . . . . . . . . . . . . . . . . . . 343
Creating a PuTTY Connection Using SSH . . . . . . . . . . . . . . . . . . . . . . . 346
Starting an Existing PuTTY Session . . . . . . . . . . . . . . . . . . . . . . . . 349
Logging On to the Network Element . . . . . . . . . . . . . . . . . . . . . . . . . . . . 350
Provisioning Cable Connection . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 351
Setting Date and Time. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 352
Defining NTP Servers . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 354
Provisioning Management Ports . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 361
Serial Port Settings . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 361
Ethernet Port Settings . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 362
FSP 3000R7 ROADM-C40/40/OPM-3HU/2DC Commissioning . . . . . . . . . . . 364
Chapter 11 Optical Network Leveling . . . . . . . . . . . 367
Introduction. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 367
Audience . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 368
Specialized Knowledge Required. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 368
Associated Documentation. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 368
Precautions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 368
Measuring the Network Fiber Attenuation . . . . . . . . . . . . . . . . . . . . . . . . 369
Measuring Unamplified End-to-End Connections . . . . . . . . . . . . . . . . . . . . 370
Measuring and Leveling Amplified Lines. . . . . . . . . . . . . . . . . . . . . . . . . . 371
Index. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 375

12 Installation and Commissioning Manual
FSP 3000R7 R11.1 80000015930 Issue B, © 2012 ADVA AG Optical Networking ADVA Confidential

Installation and Commissioning Manual 13
FSP 3000R7 R11.1, 80000015930 Issue B, © , ADVA Confidential
List of Figures
Figure 1: Installation Flowchart . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 44
Figure 1: Unpacking the 7HU shelf . . . . . . . . . . . . . . . . . . . . . . . . . . . . 98
Figure 2: Unpacking a Fiber Management Shelf (FMT/1HU Shelf). . . . . . 110
Figure 3: Example of Type Designations on the SCU Faceplate . . . . . . . 115
Figure 4: Example of a SCU Module Type Label . . . . . . . . . . . . . . . . . . 115
Figure 5: Example of a DWDM SFP Transceiver Type Label . . . . . . . . . . 117
Figure 6: ESD Adaptor Pack. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 125
Figure 7: Front Cover Attached to the SH7HU . . . . . . . . . . . . . . . . . . . 125
Figure 8: Attached ESD Connection Adaptor . . . . . . . . . . . . . . . . . . . . 127
Figure 9: ETSI and NEBS Adaptor Brackets for a 9HU shelf . . . . . . . . . . 129
Figure 10: Front Cover Fixing Bracket on the 19’’ Bracket. . . . . . . . . . . . 130
Figure 11: Fitting the ETSI and NEBS Adapter Brackets to an 9HU shelf . . 131
Figure 12: ETSI and NEBS Adaptor Brackets for a 7HU shelf . . . . . . . . . . 132
Figure 13: Front Cover Fixing Bracket . . . . . . . . . . . . . . . . . . . . . . . . . 133
Figure 14: Fitting the ETSI and NEBS Adopter Brackets to an 7HU Shelf. . 134
Figure 15: ETSI and NEBS Adaptor Brackets for a 1HU shelf . . . . . . . . . . 135
Figure 16: Fitting an 1HU Shelf with an ETSI Bracket . . . . . . . . . . . . . . . 136
Figure 17: Fitting an 1HU Shelf with an NEBS Bracket . . . . . . . . . . . . . . 136
Figure 18: ETSI and NEBS Adaptor Brackets for a SH1HU-R/PF . . . . . . . . 138
Figure 19: Fitting the ETSI and NEBS Adopter Brackets to
an SH1HU-R/PF Shelf . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 139
Figure 20: Example of Connecting an Functional Earthing Conductor
with a Ring Lug to a 7HU shelf . . . . . . . . . . . . . . . . . . . . . . . 144
Figure 21: Example of Connecting an Functional Earthing Conductor
with Two Hole Lug Terminal to a 7HU shelf . . . . . . . . . . . . . . 144
Figure 22: Example of Connecting an Functional Earthing Conductor
with Faston Wire Receptacle to a 7HU shelf . . . . . . . . . . . . . . 144
Figure 23: Example of a Six-7HU shelf System . . . . . . . . . . . . . . . . . . . 145
Figure 24: Example of 7HU Shelves Mounted into in a 19-inch Open Rack 149
Figure 25: Connecting the Power Cable to the 9HU shelf on the Front . . . 156
Figure 26: Connecting the Power Cable to the SH7HU-R. . . . . . . . . . . . . 159

14 Installation and Commissioning Manual
FSP 3000R7 R11.1, 80000015930 Issue B, © ,’ADVA Confidential
Figure 27: Connecting the Power Cable to the SH1HU-HP/2DC . . . . . . . . 162
Figure 28: Connecting a DC Power Cord to a PSU of the SH7HU . . . . . . . 166
Figure 29: Connecting the Power Cords to the Power Supply of the
SH1HU-F/2DC Shelf . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 167
Figure 30: Mounting the Tab Connectors to a PSU of the SH7HU . . . . . . . 167
Figure 31: Attaching the Terminal Flags to the Tab Connectors
Mounted to the PSU of the SH7HU . . . . . . . . . . . . . . . . . . . . 168
Figure 32: Assembling the Power Cord Locking Clamp to
the AC Power Supply . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 175
Figure 33: Example of Connecting the AC Power Cord to
the PSU of the SH7HU and SH1HU-R . . . . . . . . . . . . . . . . . . 175
Figure 34: Example of Attaching the FIBER FINGER/2HU to
a 40CSM/2HU Shelf . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 180
Figure 35: Example of Attaching the FIBER FINGER/2HU LEFT to the
40CSM-FL/2HU-#19590-#19200 Shelf . . . . . . . . . . . . . . . . . 180
Figure 36: 19-inch Bracket for a 40CSM/2HU Shelf . . . . . . . . . . . . . . . . 181
Figure 37: 19-Inch Bracket Fitted to the 40CSM/2HU-#D02-#D32 Shelf . 182
Figure 38: ETSI Bracket for an 40CSM/2HU Shelf . . . . . . . . . . . . . . . . . 183
Figure 39: ETSI Bracket Fitted to the 40CSM/2HU-#D02-#D32 Shelf. . . . 184
Figure 40: NEBS Bracket for a 40CSM/2HU Shelf. . . . . . . . . . . . . . . . . . 185
Figure 41: NEBS Bracket Fitted to the 40CSM/2HU-#D02-#D32 Shelf . . . 186
Figure 42: Adaptor Bracket Installation - Front Mounted. . . . . . . . . . . . . 190
Figure 43: Adaptor Bracket Installation - Rear Mounted . . . . . . . . . . . . . 191
Figure 44: Example of 19-Inch Bracket Attachment - Front Mounted (Left) 192
Figure 45: Example of ETSI Bracket Attachment - Front Mounted (Left) . . 193
Figure 46: Example of NEBS Bracket Attachment - Front Mounted (Left) . 193
Figure 47: 19-inch, NEBS and ETSI Brackets for a DCF1HU-P Shelf . . . . . 197
Figure 48: 19-Inch Bracket Fitted to the DCF1HU-P Shelf . . . . . . . . . . . . 198
Figure 49: NEBS Bracket Fitted to the DCF1HU-P Shelf. . . . . . . . . . . . . . 198
Figure 50: Customized ETSI Bracket Fitted to the DCF1HU-P Shelf . . . . . 198
Figure 51: ETSI Bracket Fitted to the DCF1HU-P Shelf . . . . . . . . . . . . . . 199
Figure 52: Example of an ETSI Bracket for a Fiber Management Shelf . . . 203
Figure 53: ETSI Bracket Mounted for 19-inch to the Shelf. . . . . . . . . . . . 204
Figure 54: Example of one NEBS Bracket for a Fiber Management Shelf . . 204
Figure 55: NEBS Bracket Mounted to the Shelf . . . . . . . . . . . . . . . . . . . 205
Figure 56: ETSI Adaptor Brackets for a FMT/1HU. . . . . . . . . . . . . . . . . . 206
Figure 57: Fitting an FMT/1HU with an ETSI Bracket . . . . . . . . . . . . . . . 207
Figure 58: Example of a Fiber Management Shelf Mounted into
a 19-inch Open Rack. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 209
Figure 59: Example of a Cable Configuration in the Fiber Optic Tray of
an SH1HU/FIBERMANAGEMENT . . . . . . . . . . . . . . . . . . . . . . 211

List of Figures
Installation and Commissioning Manual 15
FSP 3000R7 R11.1, 80000015930 Issue B, © , ADVA Confidential
Figure 60: Typical ROADM-C40/40/2-3HU-2DC Shelf Location. . . . . . . . . 213
Figure 61: ROADM-C40/40/OPM-3HU/2DC Shelf Installed in
a 19-Inch Rack. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 215
Figure 62: Installing the 23-Inch Rack Adapter Brackets. . . . . . . . . . . . . 217
Figure 63: Earthing Conductor Mounted to
the ROADM-C40/40/OPM-3HU/2DC Shelf . . . . . . . . . . . . . . . 219
Figure 64: DC Power Wires Installed On Terminal Block . . . . . . . . . . . . . 220
Figure 65: Terminal Block with Cover Installed . . . . . . . . . . . . . . . . . . . 221
Figure 66: Example of Inserting the PSU/9HU-DC into an SH9HU Shelf . . 231
Figure 67: Holding the PSU/1HU-R-AC(-200). . . . . . . . . . . . . . . . . . . . . 234
Figure 68: Example of Inserting a Channel Module into an SH7HU or
SH9HU Shelf Slot . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 238
Figure 69: Example of Inserting a Channel Module into
an SH1HU Shelf Slot. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 238
Figure 70: Example of an XFP Dust Plug Covering a XFP Cage. . . . . . . . . 244
Figure 71: Example of an XFP Transceiver Prepared for Inserting . . . . . . 246
Figure 72: Example of a CFP Dust Plug Covering a CFP Cage. . . . . . . . . . 249
Figure 73: Example of Inserting a CFP Transceiver. . . . . . . . . . . . . . . . . 250
Figure 74: Example of NCU to OSCM Cable Connection. . . . . . . . . . . . . . 253
Figure 75: Example of Removing a Dummy Module (DM/2HU5) from
a Shelf Slot . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 255
Figure 76: Example of Inserting a Dummy Module (DM/2HU5) into
a Shelf Slot . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 257
Figure 77: Positioning the Front Cover . . . . . . . . . . . . . . . . . . . . . . . . . 259
Figure 78: Removing the Front Cover. . . . . . . . . . . . . . . . . . . . . . . . . . 260
Figure 79: Ports of the SCU. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 267
Figure 80: Ports of the SCU-S . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 268
Figure 81: Interconnecting Shelves Using SCU Modules . . . . . . . . . . . . . 269
Figure 82: Interconnecting 1HU Shelves Using SCU-S Modules . . . . . . . . 275
Figure 83: Example of Connecting an Ethernet Cable . . . . . . . . . . . . . . . 276
Figure 84: EEE-1394 Connector Plug of the IEEE 1394 Interface Cable. . . 278
Figure 85: Routing the EEE 1394 Interface Cable Inside the Fiber Tray. . . 279
Figure 86: Example of Routing the EEE 1394 Interface Cable . . . . . . . . . 280
Figure 87: Management Port Connections. . . . . . . . . . . . . . . . . . . . . . . 282
Figure 88: Fan Front Panel . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 286
Figure 89: Video Scope. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 297
Figure 90: Clean, damaged, and dirty fiber ends . . . . . . . . . . . . . . . . . . 298
Figure 91: 1.25 mm Cotton Swabs. . . . . . . . . . . . . . . . . . . . . . . . . . . . 298
Figure 92: Fiber scope . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 301
Figure 93: Cleaning the end of a jumper with a clean-room tissue . . . . . . 304

16 Installation and Commissioning Manual
FSP 3000R7 R11.1, 80000015930 Issue B, © ,’ADVA Confidential
Figure 94: Using the Clean-room Swab. . . . . . . . . . . . . . . . . . . . . . . . . 309
Figure 95: MTP Male Connector Tip Diagram . . . . . . . . . . . . . . . . . . . . . 309
Figure 96: Example of Two Interconnected NEs Managed by an OSC . . . . 313
Figure 97: Example of Two OSCM-V#1630s Interconnecting to
OSFM+#1630s as Part of a Ring . . . . . . . . . . . . . . . . . . . . . 314
Figure 98: Typical NE Signal Flow with ROADM-C40/40/2-3HU-2DCs . . . . 316
Figure 99: NE Physical Cabling Diagram . . . . . . . . . . . . . . . . . . . . . . . . 317
Figure 100: Example of the LCD Shelf Display. . . . . . . . . . . . . . . . . . . . . 325
Figure 101: Example of the 7-Segment Shelf Display. . . . . . . . . . . . . . . . 327
Figure 102: Hardware Installation Wizard . . . . . . . . . . . . . . . . . . . . . . . . 330

Installation and Commissioning Manual 17
FSP 3000R7 11.1, 80000015930 Issue B, © , ADVA Confidential
List of Tables
Table 1: Dimensions and Weight of the System Components . . . . . . . . . 62
Table 2: Minimum Clearance Requirements . . . . . . . . . . . . . . . . . . . . . 63
Table 3: Power Ratings for DC-Powered 9HU and 7HU Shelves. . . . . . . . 67
Table 4: Power Ratings for DC-Powered 1HU Equipment Shelves . . . . . . 67
Table 5: Electrical Requirements for the AC-Powered 7HU shelf and
9HU shelf . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 68
Table 6: DC Power Cable Minimum Requirements . . . . . . . . . . . . . . . . 70
Table 7: AC Power Cable Minimum Requirements . . . . . . . . . . . . . . . . 71
Table 8: Serial and Ethernet Cable Types. . . . . . . . . . . . . . . . . . . . . . . 72
Table 9: Wiring for Serial Null Modem Cable. . . . . . . . . . . . . . . . . . . . . 73
Table 10: Ethernet Cable Types Used by the FSP 3000R7 . . . . . . . . . . . . 74
Table 11: Wiring for 10BASE-T and 100BASE-TX Straight Through and
Crossover Cables . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 75
Table 12: Wiring for 1000Base-T Straight-Through Cable
According to 568B . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 75
Table 13: Wiring for 1000Base-T Crossover Cable According to 568B . . . . 76
Table 14: Standard USB Type A Plug Pinout. . . . . . . . . . . . . . . . . . . . . . 77
Table 15: Mini-USB Type A Plug Pinout and Cable Color Code . . . . . . . . . 77
Table 16: Female HD SUB-D44 Connector Pinout . . . . . . . . . . . . . . . . . . 78
Table 17: Network Span Tests . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 80
Table 18: AC Power Cable Requirements . . . . . . . . . . . . . . . . . . . . . . . . 81
Table 19: Data Cable Requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . 82
Table 20: Site Survey Checklist . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 85
Table 21: Outer Dimensions and Average Weight of the FSP 3000R7
Equipment Shelf Shipping Boxes . . . . . . . . . . . . . . . . . . . . . . 90
Table 22: Outer Dimensions and Average Weight of Other FSP 3000R7
Shipping Boxes . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 90
Table 23: 1HU shelf, 7HU shelf and 9HU shelf Shipments . . . . . . . . . . . . 94
Table 24: SH1HU/PASSIVE Shelf Shipment . . . . . . . . . . . . . . . . . . . . . . 96
Table 25: DCF1HU-P Shelf Shipment. . . . . . . . . . . . . . . . . . . . . . . . . . . 97
Table 26: SH1HU/FIBERMANAGEMENT Shelf Shipment . . . . . . . . . . . . . . 97
Table 27: Power Supply Installation Notes . . . . . . . . . . . . . . . . . . . . . . 228

18 Installation and Commissioning Manual
FSP 3000R7 11.1, 80000015930 Issue B, © ,’ADVA Confidential
Table 28: Optical Connections 2OSCM-V#1630 to OSFM+#1630
Running in West Direction . . . . . . . . . . . . . . . . . . . . . . . . . . 314
Table 29: Optical Connections 2OSCM-V#1630 to OSFM+#1630
Running in East Direction . . . . . . . . . . . . . . . . . . . . . . . . . . 314
Table 30: Optical Connections OSCM-V#1630 to OSFM+#1630
Running in West Direction . . . . . . . . . . . . . . . . . . . . . . . . . . 315
Table 31: Optical Connections OSCM-V#1630 to OSFM+#1630
Running in East Direction . . . . . . . . . . . . . . . . . . . . . . . . . . 315
Table 32: NE and Management PC IP Addresses. . . . . . . . . . . . . . . . . . 334

Installation and Commissioning Manual 19
FSP 3000R7 R11.1 80000015930 Issue B, © 2012 ADVA AG Optical Networking ADVA Confidential
Related Documents Overview
Refer to the following documents when planning, installing, provisioning, operat-
ing, working with management tools, and troubleshooting:
Planning
•Product Description
This document provides a basic product overview.
•Detailed System Description
This document is a look-up resource. It describes the solutions and princi-
ples behind major features such as transport protocols, protection, optical
amplification, reconfigurable OADMs, DCN, Control Plane, and manage-
ment related features.
•Module and System Specification
This document contains the technical specifications for the FSP 3000R7.
•Deployment Rules
This document contains the rules for deploying FSP 3000R7 optical amplifi-
ers in an optical network.
Installing
•Critical Warnings
This document lists the most important safety requirements as well as input
power restrictions for channel modules and pluggable transceivers. Read
this document before installing, provisioning, configuring or operating the
FSP 3000R7.
•Safety Guide
This document describes important safety precautions that are to be read
and observed before attempting to install, provision, configure or operate
the FSP 3000R7. Therefore, read this document first.
•Shipment Contents
This document is used to check and verify the contents of each shipping
box against the original purchase order.
•Installation and Commissioning Manual
This document describes how to install an FSP 3000R7 node. It covers
everything from unpacking the shipment, rack-mounting the equipment,

20 Installation and Commissioning Manual
FSP 3000R7 R11.1 80000015930 Issue B, © 2012 ADVA AG Optical Networking ADVA Confidential
connecting optical fibers, and includes basic commissioning. This is a pro-
cedure-oriented document.
•Hardware Description
This document describes physical details about each module such as front
plate pictures and markings, signal path description with block diagram,
allowed placement and labeling of the modules. For details related to the
supported configurations of each module, parameter values, and other
management related data, refer to the
Management Data Guide
.
•OTDR Installation, Provisioning and Operations Manual
This document covers installation, provisioning, operations, troubleshoot-
ing, and maintenance of the OTDR unit.
Provisioning and Operating
•Provisioning and Operations Manual
This document covers provisioning, configuring, operating, and monitoring
of the FSP 3000R7 system. This is a procedure-oriented document. Read
this document in conjunction with the
Management Data Guide
in order to
look-up configuration and management related details while following the
procedures in the
Provisioning and Operations Manual
. For more detailed
guidance about the mechanics of using a management tool to perform indi-
vidual tasks, see the Element Manager.
•Management Data Guide
This document contains all provisionable, configurable, and read-only
parameters for each module, as well as performance counters. This is a
useful look-up reference both when planning and engineering a network
and while following the procedures in the
Provisioning and Operations Man-
ual
.
•OTDR Installation, Provisioning and Operations Manual
This document covers installation, provisioning, operations, troubleshoot-
ing, and maintenance of the OTDR unit.
Working with Management Tools
•TL-1 User Manual
This document describes the TL-1 commands available to provision, config-
ure, operate, and monitor the FSP 3000R7.
PS
Note
Starting with Release 10.2, the
Provisioning and Operations Manual
replaces the
User Guide
.
Other manuals for FSP 3000R7
1
Table of contents
Other Adva Network Hardware manuals
Popular Network Hardware manuals by other brands

Intellinet
Intellinet 524469 Quick install guide

Fortinet
Fortinet FortiAnalyzer-4000B Hardware install guide

Huawei
Huawei CR52-4xPOS/STM4-SFP Specifications

Garland
Garland INT10G12 V2 Series user guide

Addi-Data
Addi-Data MSX-E Series Technical description

Clustrix
Clustrix CLX 4000 Series quick start guide