AmeriGlide STRATOS VPL Supplement

25MAR2022 | 630-00147 C
VERTICAL
PLATFORM
LIFT WITH
ENCLOSURE
STRATOS
INSTALLATION
& SERVICE
MANUAL


STRATOS WITH ENCLOSURE: Install Manual
25MAR2022 | 630-00147 C
3
TABLE OF CONTENTS
STRATOS WITH ENCLOSURE
TABLE OF CONTENTS
SAFETY ................................................................................................... 4
Safety Definition ................................................. 4
Environmental Cautions ...................................... 4
INTRODUCTION .................................................................................. 5
Device Name: Ameriglide Stratos
with Enclosure Platform Lift ................................ 5
Read and Understand .......................................... 5
Technical Specifications ...................................... 5
Code Statement .................................................. 5
Applicable Standards Based
on Installation Type ............................................. 5
Requirements under ASME A18.1 ........................ 6
ASME A18.1 Section 2: Vertical Platform Lifts ..... 6
ASME A18.1 Section 5:
Private Residence Vertical Platform Lifts ............. 6
Statement of Use ................................................ 6
Key Vertical Platform Lift Elements ..................... 7
Key Internal Vertical Platform Lift Elements ........ 8
PREPARATION ..................................................................................... 9
Required Tools and Hardware ............................. 9
Recommended Tools ........................................... 9
Box Content ...................................................... 10
Required Components Not Supplied .................. 10
Unloading .......................................................... 10
Unpacking ......................................................... 10
Concrete ........................................................... 11
Material Handling .............................................. 11
Site Preparation ................................................ 11
Placing the VPL .................................................. 12
INSTALLATION .................................................................................. 14
No Hoistway / No Floor Penetration .................. 14
Electrical Connection ........................................ 14
Battery Backup .................................................. 16
Platform Connection ......................................... 16
Installing a 90° Platform (If Necessary) .............. 17
Installing the Platform Control Guard Panel ...... 17
Installing the Platform Front Guard Panel ......... 17
Installing Enclosure Tower Walls ....................... 17
Installing the Dome ........................................... 20
Installing the Top Landing Gate ......................... 20
Setting the Upper Limit Switch .......................... 21
Call Stations ...................................................... 22
Doors by Others ................................................ 22
Final Positioning and Anchoring ........................ 23
Installing Fixed Ramps ....................................... 23
Installation Tower Check ................................... 23
Final Installation ................................................ 24
Operational Check ............................................. 24
Permanent Power Installation ........................... 25
Operator Familiarization ................................... 26
INSTALLATION QUICK START ..................................................... 27
TROUBLESHOOTING ....................................................................... 28
Status Codes ..................................................... 28
Control Electronics ............................................ 31
Control Electronics Tray .................................... 31
Control Board .................................................... 32
Gearmotor ........................................................ 37
Contactor Tray .................................................. 38
Up and Down Contactors .................................. 38
E-Brake Resistor ................................................ 38
Load Resistors ................................................... 38
Cooling Fan ....................................................... 38
Battery Backup .................................................. 38
Float Switch ....................................................... 39
Emergency Evacuation Procedure ..................... 40
Emergency Lowering Procedure ........................ 40
MAINTENANCE & INSPECTION .................................................. 42
Residential Applications .................................... 42
Commercial Applications ................................... 42
Maintenance Schedule ...................................... 43

STRATOS WITH ENCLOSURE: Install Manual
25MAR2022 | 630-00147 C
4
SAFETY
STRATOS WITH ENCLOSURE: SECTION 1
SECTION 1
SAFETY
SAFETY DEFINITIONS
This safety alert symbol appears with
safety statements. It means attention,
become alert, your safety and the
safety of others are involved! Please
read and abide by the message that
follows the safety alert symbol.
NOTE: Indicates a condition that should be followed in
order for the lift to function in the manner intended.
ENVIRONMENTAL
CONDITIONS
The technician shall assess the surrounding
conditions and verify that the location is acceptable
before performing installation and/or servicing
tasks. Installation shall not proceed in inclement
weather conditions that jeopardize the technician’s
safety or ability to complete the installation in a safe
manner. Tents, canopies or other outdoor provisions
that help protect the work area from weather or
other safety concerns are recommended when
conditions warrant.
If you do not understand any portion of the
installation or operation procedures, please consult
Ameriglide's Support at 866-378-6648.
Do not attempt to install or use this lift if you have
any hesitation or question. Serious injury or damage
can result if proper procedures are not followed.
WARNING
!
CAUTION
!
Indicates a situation which can cause damage to
the lift and/or the environment, or cause the lift to
operate improperly.
NOTICE
!

STRATOS WITH ENCLOSURE: Install Manual
25MAR2022 | 630-00147 C
5
INTRODUCTION
STRATOS WITH ENCLOSURE: SECTION 2
SECTION 2
INTRODUCTION
DEVICE NAME:
STRATOS WITH ENCLOSURE
PLATFORM LIFT
Indications of Use: The Ameriglide Stratos with
Enclosure Platform Lift is designed to assist the
transfer of patients or mobility impaired persons
and their mobility device, up and down levels of a
commercial facility or residence.
READ AND UNDERSTAND
This manual provides instructions for the proper
installation and service of the Ameriglide Stratos
with Enclosure Platform Lift which is critical to the
lift’s safety, performance and durability. Please refer
to the Owner’s Manual for operating instructions.
Any alterations to the equipment without written
authorization by the manufacturer is prohibited and
will void the warranty.
TECHNICAL SPECIFICATIONS
Visit Ameriglide.com for specifications on the
particular lift model and configuration.
CODE STATEMENT
The Ameriglide Stratos lift has been designed to
meet ASME A18.1 “Safety Standard for Platform
Lifts and Stairway Chairlifts” under section 2 or
section 5 and has been certified to CAN/CSA-B44.1/
ASME A17.5 “Elevator and Escalator Electrical
Equipment”.
Code requirements for Vertical Platform lifts may
vary depending on location. It is the installers
responsibility to contact their state, city or local
code enforcement office and determine all the
regulations the lift and installation are subject
to. You must do this before installing the Vertical
Platform Lift.
APPLICABLE STANDARDS
BASED ON INSTALLATION
TYPE
Commercial and residential installations require
compliance to the ASME A18.1 safety code and
other codes that may be adopted by state, city and
local code authority having jurisdiction.
To meet the full intent of ASME A18.1 regulation the
installer is required to contact their state, city or
local code authority having jurisdiction for permits,
adopted rules and inspections of the vertical
platform lift.

STRATOS WITH ENCLOSURE: Install Manual
25MAR2022 | 630-00147 C
6
INTRODUCTION
STRATOS WITH ENCLOSURE: SECTION 2
REQUIREMENTS UNDER
ASME A18.1
ASME A18.1 Safety Standards for Platform Lifts and
Stairway Chairlifts under Section 2 or Section 5.
The Ameriglide Stratos Vertical Platform Lift is
to be installed according to all applicable codes
in accordance with ASME A18.1 - which is the
responsibility of the installer - ASME A17.5 and CAN/
CSA-B44.1.
ASME A18.1 SECTION 2:
VERTICAL PLATFORM LIFTS
Section 2 applies to vertical platform lifts installed in
locations other than in or at a private residence for
use by the mobility impaired.
RUNWAYS
Runways shall be installed in accordance with
2.1.1, or 2.1.2. Runway construction for lifts that
penetrate a floor must comply with 2.1.1 and with
the building code.
NOTE: There are 3 different sections of rules for a
commercial application.
• 2.1.1 Runway Enclosure Provided
• 2.1.2 Partial Runway Enclosure Provided
ASME A18.1 SECTION 5:
PRIVATE RESIDENCE
VERTICAL PLATFORM LIFTS
Section 5 applies to vertical platform lifts installed
in or at a private residence for use by the mobility
impaired.
RUNWAYS
Runways shall be installed in accordance with 2.1.1,
2.1.2, or 5.1.1. Runway construction for lifts that
penetrate a floor must comply with 2.1.1 and with
the building code. Only lifts installed in conformance
with 2.1.1 shall serve more than two landings.
STATEMENT OF USE
Stratos units with lift heights below 101" (VPL400-
800) are intended for a maximum operation of
24-cycles per hour. Units with lift heights above
101" (VPL1000-1400) are intended for a maximum
operation of 12-cycles per hour.

STRATOS WITH ENCLOSURE: Install Manual
25MAR2022 | 630-00147 C
7
INTRODUCTION
STRATOS WITH ENCLOSURE: SECTION 2
KEY VERTICAL PLATFORM
LIFT ELEMENTS
1. Dome (option)
2. Lift Status Indicator Lights
3. Bottom Door
4. Frame
5. Platform
6. Top Landing Door (if specified)
7. Ventilation System (option)
8. Platform Controls
9. Fixed Ramp
10. Panel (plexiglass shown)
1
2
9
3
7
5
6
10
8
4

STRATOS WITH ENCLOSURE: Install Manual
25MAR2022 | 630-00147 C
8
INTRODUCTION
STRATOS WITH ENCLOSURE: SECTION 2
KEY INTERNAL VERTICAL
PLATFORM LIFT ELEMENTS
1. Manual Lowering Tool
2. Motor / Gearbox
3. ACME Screw
4. Batteries (if supplied)
5. Battery Charger and assembly (tray)
(if supplied) (not shown)
6. Inverter (if supplied)
7. Control Electronics Assembly
8. Upper / Lower / Lower
Final Limit Switches
9. Tower Frame
10. Tower Legs
11. Wire Channel
12. Over-Speed Safety Assembly
13. Motor Contactors
14. Carriage
15. Trailing Cable
16. Cable Tensioning Pulley
17. Junction Box
(Main Power Supply Hookup)
1
13
2
7
9
8
15
11
6
4
17
3
14
10
12
16

STRATOS WITH ENCLOSURE: Install Manual
25MAR2022 | 630-00147 C
9
PREPARATION
STRATOS WITH ENCLOSURE: SECTION 3
SECTION 3
PREPARATION
Installations may vary to some degree, but below
are the basic tools to have on hand for a Stratos with
Enclosure Platform Lift installation.
Depending on the height of the application, you may
need to use a scissor lift or crane.
If you have any questions, concerns or comments,
please contact our LiftSquad Support at
800-833-0478 or tech@Ameriglide.com.
REQUIRED TOOLS AND
HARDWARE
• Tape Measure
• Grounding Strap
• Square
• Level
• Multimeter
• Wire Cutters, Wire Puller
• Stripper, Crimping Tool
• Hammer Drill
• "
• Wrench Set:
• "
• "
• "
• "
• Allen Wrench:
• "
• "
• "
• Torx Wrench
• T20
• No. 1 Phillips Head Screwdriver
• No. 2 Flat Head Screwdriver
• No. 2 Phillips Head Screwdriver
• Marking Implement
•
socket, extension and ratchet
• Concrete Drill Bits
• Temporary Power Means
• Precision Screwdriver Set
• Yellow / 74B wire Nut
• Anchors for Fixed Ramp (if specified)
RECOMMENDED TOOLS
• Work Lights (Wired or Wireless)
• Fish Tape
• Ladder
• Steel Toe Shoes
• Safety Glasses
• First Aid Kit
• Box Cutter
• Hard Hat
• Shop Vacuum
• Shop Towels and General Purpose Cleaner

STRATOS WITH ENCLOSURE: Install Manual
25MAR2022 | 630-00147 C
10
PREPARATION
STRATOS WITH ENCLOSURE: SECTION 3
BOX CONTENT
Inspect all of the boxes for damage or missing parts.
If you see any damage contact the freight carrier to
file a damage claim and contact Ameriglide.
Verify the products match those described on the
packing list attached to the exterior packaging.
If items are missing or are incorrect, contact
Ameriglide.
REQUIRED COMPONENTS
NOT SUPPLIED
NOTE: We recommend electrical supply to be installed by
an electrician, per the NFPA 70.
• Indoor applications use 30-AMP 120V 2-pole
fusible & lockable disconnect. (NEMA 1) for
outdoor applications use 30-AMP 120V 2-pole
fusible & lockable disconnect (NEMA 3R).
• Wire, Conduit and Disconnect to meet NFPA
70 code
• Dedicated Electrical Lead (per local code)
UNLOADING
• VPL units are shipped shrink wrapped to a
pallet. Pallet dimensions will vary depending
on the tower size. Units are screwed into the
"wrench
socket to remove screws.
A lift gate is unable to be used on models 6'or
taller which are shipped laying back. A pallet jack or
forklift can be used to set into place.
NOTE: Must have a loading dock, pick up the VPL at the
shipping terminal, or ship it directly to the installation site.
This information must be documented on the evaluation
form.
NOTE: Enclosure panels and doors and or/top landing gate
will be packed on a "A" frame skid.
VPL’s weigh between 800 - 1500 lb, depending on
the height. The following may be necessary to assist
in positioning:
• Additional Manpower
• Fork Lift
• Crane
• Pallet Jack
• Lever Bar Dolly
UNPACKING
1. Unwrap the VPL and set the following items
aside:
• Small Parts Box
• Ramp (if provided)
• Platform Panels
• Platform
• Gate
2. Remove the tower from the pallet.
3. Perform pre-delivery inspection

STRATOS WITH ENCLOSURE: Install Manual
25MAR2022 | 630-00147 C
11
PREPARATION
STRATOS WITH ENCLOSURE: SECTION 3
CONCRETE
• Concrete pad should be no less than 4"thick,
3500 PSI reinforced, and must be level. The size
of the concrete pad may vary depending on the
size of the VPL footprint. Concrete at the
enough to turn a mobility device around. Pay
concrete on the exterior of a house or building
are normally sloped to shed water. The normal
""per foot to provide
adequate drainage. Steel shims should be used
"per foot, it should be
reworked and leveled before installing the VPL.
CAUTION
!
NOTE: Do not shim more than 1/2".
• Ameriglide recommends securing the lift using
our Anchor Kit
MATERIAL HANDLING
CAUTION
!
• It may be necessary to move the VPL around
once it’s on the job site. Extra material handling
equipment such as manual carts, a pallet jack,
by man power. All of the tower panels can be
removed to reduce the weight of the tower. Care
should be taken not to scratch or damage panels
when removing, carrying, and reinstalling them.
• Special care must be taken to protect any
be damaged by the uses of material handling
equipment.
SITE PREPARATION
•
power supply and disconnect per NFPA 70.
•
of the concrete slab must be large enough for
• If there was a blueprint created for the project
check that all work matches the blueprint.
Running clearance measurements should be
top landing and overhead clearance. Ensure
there are no pinch points.
• If doors are supplied by others check that
are required. If other non Ameriglide supplied
equipment (power door openers, interlocks,
and/or door strikes) are going to be used, check
• The front tower panel and the top cover must be
removed before any power, gate/door, call send
CAUTION
!

STRATOS WITH ENCLOSURE: Install Manual
25MAR2022 | 630-00147 C
12
PREPARATION
STRATOS WITH ENCLOSURE: SECTION 3
PLACING THE VPL
1. Depending on the height of the unit, it may
be shipped horizontal. You will need to stand
it up and place it where it will be fixed. If
laying down, the tower is extremely heavy.
Please take this into consideration when lifting
the tower.
Be sure to lift from the frame if using
machinery. DO NOT lift from the outside body
panels.
Position the lift in place according to its
dimensions. See Figure 3-1.
31.2" centerline
of 36" platform
and building
door to back of
unit (34.2 f"or
42")
Building side
36"
13.2"
Center the unit
on the building
door
13.375" machine
base to building
(11.59" if 3-wall)
Figure 3-1
2. Install the tower-side walls that will potentially
be against a structure onto the enclosure.
NOTE: The bottom vent panel that has the large hole for
the pit-switch will be on the other side of the tower.
NOTE: See the drawing of enclosed in the small parts of
the enclosure.
To install the panels, you will remove the
screw that's in the tower and mount the side
panel. See Figure 3-2.
Use screws
from the side
of the VPL
Install these panels
Lower panels have
vent holes. Concave
side faces the
platform.
Figure 3-2
3. Un-pack the enclosure parts. If you've ordered
an enclosure with acrylic windows, they'll
arrive with a paper or plastic protector on all
but the outside edges of the windows. You
should leave these protectors on the windows
until you are ready to finalize the installation.
Be careful not to scratch the powder coat on
any of the parts.
NOTE: When building against a wall, you will have to
access the components from the inside tower instead
of the outside. The smooth side of all panels face to the
inside of the unit.
4. Put the enclosure alignment plate across the
ends of the two tower legs. The plate is to
ensure that you achieve the correct spacing of
the vertical panels to the lift. See Figure 3-3.

STRATOS WITH ENCLOSURE: Install Manual
25MAR2022 | 630-00147 C
13
PREPARATION
STRATOS WITH ENCLOSURE: SECTION 3
Enclosure
alignment
plate
Figure 3-3
NOTE: Enclosure needs to have all screws and plastic
washers secure to prevent rusting if the unit is located
outside. After the unit is secured and anchored, the plate
should be removed.
5. Depending on the application, specifically if
it is a wall side first, you may not have access
to the bolt holes when it is assembled. Use
the fastener kit specified on the installation
drawing to assemble panels. See Figure 3-4.
Bolts and caps (2)
Bolt together
wall-side panels
Figure 3-4
6. Place the bolts through the tower side panels
into the wall panels. See Figure 3-5.
You may have
to shim this
side if a gap is
at the bottom
You may
have to shim
under here if
gap is at the
top
Figure 3-5
7. Verify the spacing for the tower side panels and
decide if you are going to need to shim the VPL
unit. The tower side panels' edge needs to be
parallel with the wall. Depending on the angle,
open at the top, shim the tower.

STRATOS WITH ENCLOSURE: Install Manual
25MAR2022 | 630-00147 C
14
INSTALLATION
STRATOS WITH ENCLOSURE: SECTION 4
SECTION 4
INSTALLATION
NO HOISTWAY / NO FLOOR
PENETRATION
1. Remove 5X front screws.
2. Remove the plastic top cap by loosening the
four (4) side screws and lifting the top cap.
This part will be replaced by the Stratos with
enclosure metal top cap. See Figure 4-1.
5X front
screws
4X side
screws
Figure 4-1
3. Remove the front panel by rotating it out
slightly and lifting it out of the lower slots.
4. Position the VPL tower close to the upper
landing and stand it up using appropriate
material handling processes.
NOTE: Tower frame should only be lifted by the
rectangular tubes below the top plate.
ELECTRICAL CONNECTION
WARNING
!
1. Remove and discard the temporary bolt and
pulley to the carriage for shipping. This bolt is
indicated with a red tag. Suspend the pulley
assembly behind the carriage. See Figure 4-2.
Pulley
Assembly
Temporary
Shipping Bolt
Figure 4-2
NOTE: Be sure that the pulley assembly is suspended with
the sheeve at the top and that it is clear to move through
the lift range.
2. Connect the 8-pin platform control box
connector.

STRATOS WITH ENCLOSURE: Install Manual
25MAR2022 | 630-00147 C
15
INSTALLATION
STRATOS WITH ENCLOSURE: SECTION 4
3.
WARNING
!
Remove 4X screws on junction box cover
inside the tower. Retrieve 4' temporary power
cord from the parts kit. Route stripped end of
wire into the junction box. See Figure 4-3.
Figure 4-3
Make the following connections:
• Black to Black (L1 Hot)
• White to White (L2 Neutral)
• Green to Green (Ground)
If a battery backup is included, there will also be
two (2) brown wires in the junction box. The two (2)
brown wires get tied to each other. See Figure 4-4.
Figure 4-4
WARNING
!
4. Connect a temporary cord to a grounded 20A
extension cord and route down through the
back of the center wire channel to the bottom
of the lift and out to a temporary 120V AC
outlet. See Figure 4-5.
Junction
box
Back
brace of
tower
Wire
channel
Figure 4-5
5. Once power is established and the VPL comes
online, the indicator LED's on the control
board will flash an alarm code to indicate that
the installation is incomplete.

STRATOS WITH ENCLOSURE: Install Manual
25MAR2022 | 630-00147 C
16
INSTALLATION
STRATOS WITH ENCLOSURE: SECTION 4
BATTERY BACKUP
1. If equipped with a battery backup system.
Place two or four batteries on the battery
tray(s) and connect spade terminals to the
batteries.
Refer to wiring schematic 640-00025 for connectivity
and polarity.
NOTICE
NOTE: Inverter comes switched off to conserve
battery power. Please switch the inverter to on.
2. If equipped with a cold-weather package, the
junction box will include a duplex outlet.
• Install thermostatic switch into the top
outlet.
• Wrap battery warming blanket around each
pair of blankets with the overlap and cord in
the back.
• Feed the blanket cord down behind the
battery tray and plug into the thermostatic
switch.
• Wrap 2X zip-ties around the outside
perimeter of the batteries.
DO NOT OVER-TIGHTEN.
PLATFORM CONNECTION
1. Place the platform on a support object strong
enough to handle the weight of the platform.
Position the platform on the support located
near the bottom of the VPL.
2. Press the service button on the control
electronics board. All four (4) status indicator
LED's will flash green, to show that "Service
Mode" is active. The unit will remain in
"Service Mode" for ten minutes. Press the
service button again if needed.
3. Use the platform control box to move the
carriage up or down to align the platform and
carriage mounting holes. See Figure 4-6.
Figure 4-6
4. "bolts using the low
profile Nyloc nuts on the lower bolts and a
standard nyloc nut on the upper bolts.
See Figure 4-7.
Figure 4-7
5. Secure the safety pan harness and platform
control harness under the clip at the top of
the carriage flange.

STRATOS WITH ENCLOSURE: Install Manual
25MAR2022 | 630-00147 C
17
INSTALLATION
STRATOS WITH ENCLOSURE: SECTION 4
INSTALLING A 90°
PLATFORM (IF NECESSARY)
If installing a 90° platform, please follow the
approved drawings for your application.
The panels are different to accommodate the
application. See Figure 4-8.
Figure 4-8
INSTALLING THE PLATFORM
CONTROL GUARD PANEL
1. Locate hardware packs for platform in small
parts bags.
2. Insert the control side guard panel posts into the
"- 20 x 2"bolts. Torque bolts down
3. Remove the four (4) screws and nuts loosely
attached to the control box.
4. Fasten the control box to the control guard
panel securely with the four (4) screws and
nuts. Connect the ground ring terminal to the
bottom screw connecting the control box to
the panel.
INSTALLING THE PLATFORM
FRONT GUARD PANEL
Insert the front guard panel posts into the pockets
on the platform with the smooth side facing the
inside of the platform. Fasten in place with four (4)
"-20 x 2"bolts.
INSTALLING ENCLOSURE
TOWER WALLS
Your enclosed Stratos will come with a CAD certified
drawing that was approved by Ameriglide and the
customer. It will show how the unit should be fixed
and what hardware should be used.
1. Place and shim (if necessary) the lowest front
wall, the door frame and the tower-side walls
on the door-side of the enclosure. The lowest
tower side-panel is vented and is placed with
the vent side against the back of the tower.
This side is intentionally left spaced for the
emergency pit-switch. Assemble and install
the pit-switch and its housing box.
See Figure 4-9.
Lowest front
panel
You may have
to shim these
Lowest
outside
panel
install pit
switch
Door frame
Figure 4-9
2. Install the rest of the front and tower-side
panels, by stacking them one on top of each

STRATOS WITH ENCLOSURE: Install Manual
25MAR2022 | 630-00147 C
18
INSTALLATION
STRATOS WITH ENCLOSURE: SECTION 4
other per the provided CAD drawing.
These panels bolt together with Allen head
bolts and nyloc nuts. Some panels are
threaded and others will require you to use a
metal cylinder spacer.
After all panels are assembled you are now
able to place the top cap. For lifts taller than
8', you may skip ahead to the anchor step on
page 23. See Figure 4-10.
Lift top cap
Remaining
tower side
panels
Other 'front'
panels
Figure 4-10
3. Your door may come assembled to the frame.
The door assembly weighs more than 200
lb, so take care in lifting it into place and
be careful not to scratch it. Put eight bolts
into it and leave them loose before final
placement. You'll need to adjust the position
both vertically and horizontally to match the
threshold of the ramp (or upper landing).
See Figures 4-11 and 4-12.
Install lower
door
Gate brackets
Upper gate
(or door)
Figure 4-11
Bolt gate brackets to
the unistrut frame
using the regular
Figure 4-12
NOTE: Ensure all bolts inside of the hoistway are cap-head
side to prevent pinch/injury.
NOTE: Do not completely secure hardware until final
alignment is verified.

STRATOS WITH ENCLOSURE: Install Manual
25MAR2022 | 630-00147 C
19
INSTALLATION
STRATOS WITH ENCLOSURE: SECTION 4
4. Whether the enclosure uses a fixed ramp or
you have a pit, the next step is to adjust the
height of the doors to fit their thresholds. Pry
them gently to the correct height with a piece
of wood to prevent damaging the finish. In
order to set the height correctly, you may
need to adjust the lower and upper stops on
the lift to have it stop correctly on the
landings.
Limit switches are housed inside of the tower
and are visible with the font panel removed.
They can be adjusted UP or DOWN on a
slotted channel with Allen bolts holding them
in place.
WARNING
!
5. Use the provided plexiglass above the door.
Install the acrylic with the angles and flats
provided, which rivet in. See Figure 4-13.
Adjust the
door to the
final position,
then cut the
plexiglass
to fit the
opening and
rivet in
Determine
required
threshold
height. If it
uses a fixed
ramp or
other, be sure
to plan for it.
Figure 4-13
6. Adhere the Z97.1 labels on plexiglass after
installation.
NOTE: Note: Plexiglass comes cut to spec. Trim will be
provided to hold plexi in place, however it will need to be
riveted to secure. See Figure 4-14.
Figure 4-14
NOTE: Depending on the platform application you may
need to verify spacing around the platform to ensure a
clear path of travel.
7. If the unit is equipped with a ventilation
system, power will need to be supplied
separately from the VPL unit. The ventilation
system is DC power operated but requires an
AC power supplemental charge.
NOTE: The ventilation system comes installed with
a thermostat. The thermostat is preset to meet
ASME A18.1 set the temperature under rule 2.1.1.8
(temperature not to exceed 32°C or 90°F).

STRATOS WITH ENCLOSURE: Install Manual
25MAR2022 | 630-00147 C
20
INSTALLATION
STRATOS WITH ENCLOSURE: SECTION 4
INSTALLING THE DOME
1. The top panels of the enclosure will have a
slotted bracket installed between the panel
and the dome.
The dome has threaded attachment points
that rest inside of the slots and a nut that is
attached for securement. See Figure 4-15.
Figure 4-15
INSTALLING THE TOP
LANDING GATE
(IF NECESSARY)
NOTE: If the call send switch is installed in the gate, the
wires are routed between the gate and to the top of the
tower. If the call send is located outside the gate, the
wires are routed from the gate to the call send box and
then from the box to the top of the tower.
2. Create the necessary space below the gate sill
so the wire can be routed into the gate post
through the wire routing slot. See Figure 4-16.
Post slots
Hole
plugs
Wire routing
slots
Sill
mounting
slots
Figure 4-16
3. Remove small screws and post cover on the
latch side of the landing gate with a No. 1
Phillips screwdriver.
4. Open landing gate door and remove 4X hole
plugs.
5. Place the gate at the upper landing and center
the gate opening with the platform.
6. Use the holes in the gate threshold to screw
the gate down to the landing.
7. Run the wire through the wire routing slot and
to the interlock.
Table of contents