manuals.online logo
Brands
  1. Home
  2. •
  3. Brands
  4. •
  5. Ammara Designs
  6. •
  7. Control Unit
  8. •
  9. Ammara Designs PBS-RGH User manual

Ammara Designs PBS-RGH User manual

Popular Control Unit manuals by other brands

Seitz 14A80 user manual

Seitz

Seitz 14A80 user manual

Wilo RS485 Installation and operating instructions

Wilo

Wilo RS485 Installation and operating instructions

Becker CentralControl CC41 Commissioning Instruction

Becker

Becker CentralControl CC41 Commissioning Instruction

SICK CDB650 operating instructions

SICK

SICK CDB650 operating instructions

Panduit NetKey NKP5E88M Series installation instructions

Panduit

Panduit NetKey NKP5E88M Series installation instructions

MX Options Concentric Petite Fitting instructions

MX

MX Options Concentric Petite Fitting instructions

Clean Water Systems Fleck 2510 Installation & start?up guide

Clean Water Systems

Clean Water Systems Fleck 2510 Installation & start?up guide

Fairchild FSB44104A user guide

Fairchild

Fairchild FSB44104A user guide

LEGRAND Wattstopper LMIN-104 installation instructions

LEGRAND

LEGRAND Wattstopper LMIN-104 installation instructions

PMK ATT10BNCS instruction manual

PMK

PMK ATT10BNCS instruction manual

Tektronix TDS3FFT user manual

Tektronix

Tektronix TDS3FFT user manual

Woodward easYgen Technical manual

Woodward

Woodward easYgen Technical manual

Balluff BNI EIP-502-105-R015 user guide

Balluff

Balluff BNI EIP-502-105-R015 user guide

NXP Semiconductors TWR-LS1021A Getting started

NXP Semiconductors

NXP Semiconductors TWR-LS1021A Getting started

Advantech PCM-3117 Startup manual

Advantech

Advantech PCM-3117 Startup manual

Danfoss MCO 101 manual

Danfoss

Danfoss MCO 101 manual

Moons' Lin Engineering R701P user manual

Moons'

Moons' Lin Engineering R701P user manual

Aventics RV1 operating instructions

Aventics

Aventics RV1 operating instructions

manuals.online logo
manuals.online logoBrands
  • About & Mission
  • Contact us
  • Privacy Policy
  • Terms and Conditions

Copyright 2025 Manuals.Online. All Rights Reserved.

VALVE ONLY
For Pressure Balance Shower Set
No Finish
PBS-RGH
15121422-A
Installation Instructions
For easy installation of your faucet you will need:
●To read all the installation completely before beginning.
●To read all warnings, care, and maintenance information.
Applicable Standards/Codes
Installation Dimensions
PBS-RGH
Replacement Parts
15121422-A 4
NO. Description Part No.
1
End Cap
5T1C0138NT
2
3
Stop Valve
9Q1152NT
5L0C0861NT
4 Pressure Balance Cartridge 5D0M0262PL
5
Sleeve
9Q1173NT
6
Cartridge Nut 5T1C0216NT
Sten & Threaded Nipple
IAPMO certified to meet or exceed the following:
• ASME A112.18.1/CSA B125.1
• Uniform Plumbing Code
• National Plumbing Code of Canada
• ASSE 1016
2 7/8"- 3 7/8"1 13/16"- 2 13/16"
5 1/2"- 5 7/8"
1 1/4"
11/16"5"
1 11/16"
2 1/16"
2 15/16"
5 1/4"
4 1/8"
1/2"-14 NPT
1/2"-14 NPT
1/2"-14 NPT
2
1
3
4
56
PBS-RGH
Installation Instructions
23
15121422-A 2 15121422-A3
3
Using mounting holes secure the
valve making sure the “UP” label
outlet is on top.
If you are making a back-to-back
installation (hot on right and cold on
the left) ,install the back valve body
as described in steps #5 – #6.
If not, go to step #7. NOTE: Notice
that the back valve has hot and cold
indicators that will be opposite of the
incoming supply lines.
45
Remove the cartridge and stem
assembly. Notice that the pin is at
the top. Rotate the cartridge 180°.
The pin should be on the bottom.
This valve is designed to fit into a
wall that is 2 7/8"to 3 7/8"from
finished wall to the back of the valve.
Extensions are shipped with the trim
if necessary.
12 7/8"- 3 7/8"2
Turn off the water supplies.Install the
valve so the finished wall will fit
between the markers on the mud
guard.
22 7/8"-3 7/8"
6
Align the pins on the bottom of the
cartridge and push the cartridge into
the valve. Make sure the cartridge is
firmly installed into the valve body.
Reinstall stem assembly with mud
guard.
7
Connect valve body to water supplies using the proper fittings .
Warning: avoid soldering at high temperature. Exposure to high
temperature may damage the cartridge. Be sure stops and pressure balance
cartridge are removed before soldering.
8
Connect the valve body to the shower
outlet with the proper fillting.Note: it
is suggested that you anchor all water
lines.
Stops
Pressure Balance
Cartridge
Warning
Mounting
hole
Mounting hole
Hot
Left Right
Back valve Back valve
Cold
2
9
1.Pressure test and flush the valve.
a. Prior to testing, remove mud guard, stem assembly, cartridge as stops as shown.
b. Plug the shower outlet and check for leaks.
c. After testing, flush system.
d. Remove shower outlet plug. Re-install the stops, cartridge, stem assembly and mud guard.
2.Check for leaks.
Installation completed.
10
a b c d
Cartridge
Rotate 180°
Pin
Pin
Pin
Valve Cartridge
Red
Red
Red Blue Blue
Blue
PBS-RGH
Installation Instructions
23
15121422-A 2 15121422-A3
3
Using mounting holes secure the
valve making sure the “UP” label
outlet is on top.
If you are making a back-to-back
installation (hot on right and cold on
the left) ,install the back valve body
as described in steps #5 – #6.
If not, go to step #7. NOTE: Notice
that the back valve has hot and cold
indicators that will be opposite of the
incoming supply lines.
45
Remove the cartridge and stem
assembly. Notice that the pin is at
the top. Rotate the cartridge 180°.
The pin should be on the bottom.
This valve is designed to fit into a
wall that is 2 7/8"to 3 7/8"from
finished wall to the back of the valve.
Extensions are shipped with the trim
if necessary.
12 7/8"- 3 7/8"2
Turn off the water supplies.Install the
valve so the finished wall will fit
between the markers on the mud
guard.
22 7/8"-3 7/8"
6
Align the pins on the bottom of the
cartridge and push the cartridge into
the valve. Make sure the cartridge is
firmly installed into the valve body.
Reinstall stem assembly with mud
guard.
7
Connect valve body to water supplies using the proper fittings .
Warning: avoid soldering at high temperature. Exposure to high
temperature may damage the cartridge. Be sure stops and pressure balance
cartridge are removed before soldering.
8
Connect the valve body to the shower
outlet with the proper fillting.Note: it
is suggested that you anchor all water
lines.
Stops
Pressure Balance
Cartridge
Warning
Mounting
hole
Mounting hole
Hot
Left Right
Back valve Back valve
Cold
2
9
1.Pressure test and flush the valve.
a. Prior to testing, remove mud guard, stem assembly, cartridge as stops as shown.
b. Plug the shower outlet and check for leaks.
c. After testing, flush system.
d. Remove shower outlet plug. Re-install the stops, cartridge, stem assembly and mud guard.
2.Check for leaks.
Installation completed.
10
a b c d
Cartridge
Rotate 180°
Pin
Pin
Pin
Valve Cartridge
Red
Red
Red Blue Blue
Blue
VALVE ONLY
For Pressure Balance Shower Set
No Finish
PBS-RGH
15121422-A
Installation Instructions
For easy installation of your faucet you will need:
●To read all the installation completely before beginning.
●To read all warnings, care, and maintenance information.
Applicable Standards/Codes
Installation Dimensions
PBS-RGH
Replacement Parts
15121422-A 4
NO. Description Part No.
1
End Cap
5T1C0138NT
2
3
Stop Valve
9Q1152NT
5L0C0861NT
4 Pressure Balance Cartridge 5D0M0262PL
5
Sleeve
9Q1173NT
6
Cartridge Nut 5T1C0216NT
Sten & Threaded Nipple
IAPMO certified to meet or exceed the following:
• ASME A112.18.1/CSA B125.1
• Uniform Plumbing Code
• National Plumbing Code of Canada
• ASSE 1016
2 7/8"- 3 7/8"1 13/16"- 2 13/16"
5 1/2"- 5 7/8"
1 1/4"
11/16"5"
1 11/16"
2 1/16"
2 15/16"
5 1/4"
4 1/8"
1/2"-14 NPT
1/2"-14 NPT
1/2"-14 NPT
2
1
3
4
56