APsystems APstorage Sea Instruction Manual

APstorage Sea System
Installation & User Manual
(For EMEA&AU)
Rev2.1 2022-08-29
© All Rights Reserved

APstorage Installation / User Manual
Table of Contents
1. Important Safety Instructions .......................................................................................................................... 2
1.1 Safety Instructions ....................................................................................................................................................2
1.2 Radio Interference Statement ............................................................................................................................ 2
1.3 Communication Disclaimer ..................................................................................................................................3
1.4 Symbols replace words on the equipment, on a display, or in manuals .........................................3
2. APstorage Sea System Introduction .............................................................................................................4
2.1 Dimensions ..................................................................................................................................................................4
2.2 Basic System Architecture ..................................................................................................................................5
2.3 LED ................................................................................................................................................................................6
2.4 PCS Connection Port .............................................................................................................................................7
3. Installation ............................................................................................................................................................ 8
3.1 Packing List................................................................................................................................................................ 8
3.2 Select Mounting Location ................................................................................................................................... 9
3.3 PCS Installation Steps ......................................................................................................................................... 10
3.4 PCS Wiring ................................................................................................................................................................ 11
3.4.1 DC Wiring .....................................................................................................................错误!未定义书签。
3.4.2 AC Wiring..................................................................................................................................................... 13
3.4.3 Communication Wiring ...........................................................................................................................15
3.4.4 CT Wiring ......................................................................................................................................................16
3.5 Install the Lower Cover .......................................................................................................................................18
3.6 PV System to APstorage Pairing ....................................................................................................................19
3.7 Wiring Diagram .....................................................................................................................................................20
3.8 Parallel Wirng Diagram .......................................................................................................................................21
3.9 PCS Parallel Wiring Steps .................................................................................................................................22
3.10 Start-up Sequence ............................................................................................................................................. 23
3.10.1 Power ON ....................................................................................................................................................23
3.10.2 Check the System ...................................................................................................................................23
4. APstorage User Interface ...............................................................................................................................24
4.1 Configurate APstorage with EMA Manager .............................................................................................. 24
4.2 Home Page ..............................................................................................................................................................26
4.3 Module .......................................................................................................................................................................28
4.4 Data ............................................................................................................................................................................29
4.5 Workbench ..............................................................................................................................................................32
4.6 Settings .................................................................................................................................................................... 49
5. Contact Information ........................................................................................................................................ 50

APstorage Installation / User Manual
2
1. Important Safety Instructions
This manual contains important instructions to be followed during installation and maintenance of
the APstorage Sea system. To reduce the risk of electrical shock and ensure the safe installation
and operation of the APstorage Sea system, the following symbols appear throughout this
document to indicate dangerous conditions and important safety instructions.
DANGER: This indicates a hazardous situation, which if not avoided, will result in death or serious
injury.
WARNING: This indicates a situation where failure to follow instructions may be a safety hazard or
cause equipment malfunction. Use extreme caution and follow instructions carefully.
NOTE: This indicates information that is very important for optimal system operation. Follow
instructions closely.
1.1 Safety Instructions
IMPORTANT SAFETY INSTRUCTIONS. SAVE THESE INSTRUCTIONS. This guide contains
important instructions that you must follow during installation and maintenance of the PCS. Failing
to follow any of these instructions may void the warranty. Follow all of the instructions in this
manual. These instructions are key to the installation and maintenance of the APstorage Sea
system. These instructions are not meant to be a complete explanation of how to design and install
APstorage Sea systems. All installations must comply with national and local electrical codes and
standards.
DANGER: - Only qualified professionals should install and/or replace the APstorage Sea system.
- Perform all electrical installations in accordance with local codes.
- To reduce risk of burns, do not touch the body of the PCS. (APstorage Sea system
includes 2 main elements: PCS (APsystems Power Conversion System) and the
battery cells.
WARNING: - Do NOT attempt to repair the APstorage Sea system. If it shows abnormal
performance, contact
APsystems Customer Support to obtain adequate support. Damaging or opening the
APstorage Sea system will void the warranty.
NOTE: - Before installing or using the APstorage Sea system, please read all instructions and
Cautionary markings in the technical documents and on the APstorage Sea system.
1.2 Radio Interference Statement
The equipment which could radiate radio frequency energy and this might cause harmful
interference to radio communications if not following the instructions when installing and using
the equipment. But there is no guarantee that interference will not occur in a particular installation.
If this equipment causes harmful interference to radio or television reception, the following
measures might resolve the issues:
A) Relocate the receiving antenna and keep it well away from the equipment.
B) Consult the dealer or an experienced radio / TV technician for help.
Changes or modifications not expressly approved by the party responsible for compliance may
void the user’s authority to operate the equipment.

APstorage Installation / User Manual
3
1. Important Safety Instructions
1.3 Communication Disclaimer
EMA system provides a friendly interface to monitor the working status of the whole energy
storage system. At the same time, it can also help to locate problems during system maintenance.
In case communication has been loss for more than 24 hours, please contact the technical support
of APsystems.
1.4 Symbols replace words on the equipment, on a display, or in manuals
Trademark
Caution, risk of electric shock
Refer to the operating instructions
Caution, hot surface.
Danger to life due to high voltage. Cut off all power and wait at least 5
minutes before any work is carried out in the inverter.
This device SHALL NOT be disposed of in residential waste
Please go to Chapter 9 “Recycling and Disposal” for proper
treatments.
CE mark is attached to the solar inverter to verify that the unit
follows the provisions of the European Low Voltage and EMC
Directives.
Qualified
personnel
Person adequately advised or supervised by an electrically skilled
person to enable him or her to perceive risks and to avoid hazards
which electricity can create. For the purpose of the safety information
of this manual, a "qualified person" is someone who is familiar with
requirements for safety, refrigeration system and EMC and is
authorized to energize, ground, and tag equipment, systems, and
circuits in accordance with established safety procedures. The
inverter and endues system may only be commissioned and operated
by qualified personnel.

APstorage Installation / User Manual
4
2. APstorage Sea System Introduction
APstorage Sea system is a complete and independent AC coupling storage solution for residential
PV installations. It can be used with any new or already installed PV systems without changing
equipment in place.
Power Conversion System(PCS)
One PCS can be connected to 1~3 battery packs. When 2~3 battery packs are connected,
they need to be connected in parallel (see connection diagram in the Battery User Manual).
APstorage will help home-owners to optimize their utility bill, offering full flexibility to manage
their electrical consumption. Several modes are indeed available (Backup power, residual power
self-use and advanced mode).
2.1 Dimensions
Unit (mm)

APstorage Installation / User Manual
5
2. APstorage Sea System Introduction
2.2 Basic System Architecture
A typical APstorage Sea system includes two main elements:
-Sea System Inverter. The Sea System Inverter is a smart Power Conversion System(PCS).
The PCS includes a build-in ECU (Energy Communication Unit) to ensure monitoring of the
overall system once up and running
-One Battery pack
NOTE: In the APstorage Sea system, the battery is one of the key components.
Therefore, it is necessary to keep the installation environment well ventilated,
please refer to APbattery user manual.

APstorage Installation / User Manual
6
2. APstorage Sea System Introduction
2.3 LED
There are eight LED indicators on the PCS unit, indicating the working state of the PCS.
LED
Condition
Description
SYSTEM
Light on constantly
The system is operating
Light flashing
The system is starting up
Light off
The system shutdown
GRID
Light on constantly
The grid exists and is connected
Light flashing
The grid exists but is not connected
Light off
The grid does not exist
BACK UP
Light on constantly
The backup system is operating
Light off
The backup is off
ENERGY
Light on constantly
Buy energy from grid
Light flashing 1
Zero output
Light flashing 2
Supplying energy to grid
Light off
The grid is not connected or system is not operating
BATTERY
Light on constantly
The battery is charging
Light flashing 1
The battery is discharging
Light flashing 2
The battery SOC is low
Light off
The battery is disconnected
WI-FI
Light on constantly
The WiFi is connected to the router
Light flashing 1
The WiFi is not connected to the router
Light off
The WiFi function is closed
COM
Light on constantly
The battery and the internet communication are normal
Light flashing 1
The battery communication is normal, but the internet
communication is abnormal
Light flashing 2
The battery communication is abnormal, but the
internet communication is normal
Light off
The battery and the internet communication are abnormal
FAULT
Light on constantly
Fault has occurred
Light flashing
Back up output overload
Light off
No fault
NOTE: Light flashing 1: Every 5 seconds light on for 1 second.
Light flashing 2: Every 2 seconds light on for 1 second.

APstorage Installation / User Manual
7
2. APstorage Sea System Introduction
2.4 PCS Connection Port
(Bottom view of PCS)
Cable port:
①DC cable: Connect the positive and negative terminals of the battery.
②AC cable: AC grid port is connected to power grid and AC backup port is off grid output.
③Internet cable: Connect the Internet port into the router.
④CT cable: Connect the PV CT or Grid CT cable to the PCS.
(Both cable ports are available)
Antenna:
Use for Wifi and Zigbee communication.

APstorage Installation / User Manual
8
3. Installation
3.1 Packing List
PCS Packing List
KITS
PICTURES
PCS
×1
Wall-mounted Bracket
×1
Expansion screw
(M8*70)
×4
Fixing screw
(M6×14)
×1
CT(Current transformer)
×2(grid CT and PV CT)
Installation / User Manual
×1
NOTE: The expansion screws are applicable only to cement concrete walls. For other
types of walls, install expansion screws based on the wall type.
NOTE: The customer purchases the combiner box for parallel connection of the
batteries. Combiner box requirements: rated current of each
connector≧100A.

APstorage Installation / User Manual
9
3. Installation
3.2 Select Mounting Location
1. PCS should be installed on a solid surface, where is suitable for PCS’s dimensions
and weight.
2. Do not install PCS in a confined space with no ventilation.
3. If the PCS is installed outside, it should be protected under shelter from direct sunlight or bad
weather conditions (like snow, rain, lightning, etc). Fully shielded installation locations are
preferred.
4. Please try to install APstorage vertically on the wall.
5. Make sure that the PCS is mounted “face-up”: Product logo is visible after installation.
6. Leave enough space around APstorage. The specific requirements are as follows:
WARNING: APstorage Sea system cannot be installed near flammable, explosive or
strong electro-magnetic equipment.
500mm
300mm
300mm
300mm

APstorage Installation / User Manual
10
3. Installation
3.3 PCS Installation Steps
①Mark the holes position on the wall and drill holes according to wall type and expansion screws
type.The configured expansion screw is drilled with a diameter of 12mm and a depth of
50-55mm.
②Put the expansion screws into the holes on the wall. Use a wrench to tighten the hex nuts, so
that the expansion screws sleeve are fully expanded. Then remove the hex nuts. Hang the wall
mounting bracket into the expansion screws, and use the hex nuts to fix it firmly. Make sure
that the wall mounting bracket is horizontal after installation.
③Lift the PCS hang it into the wall mounting bracket, and fix the PCS on wall mounting bracket
with the M6×14mm screw.
M6×14 screw

APstorage Installation / User Manual
11
3. Installation
3.4 PCS Wiring
When wiring, you need to remove the lower cover first, just unscrew the 8 locking screws.
Battery Connector
Terminal Block
Grid Breaker
Energy communication unit
gy coEnergy

APstorage Installation / User Manual
12
3. Installation
When wiring, you need to crimp appropriate terminals on the cable (as shown for dimensions). The
cables and terminals need to be prepared by yourself or purchased from APsystems.
The terminals for DC cable The terminals for AC cable
16mm²10mm²
Recommend cable:DC cable 16mm²/AC cable 10mm²
PCS has been installed with cable glands before delivery. If connection is required through pipe
(prepare pipe by yourself), remove cable glands on the BOX first.
PIPE 1-1/2"

APstorage Installation / User Manual
13
3. Installation
3.4.1 DC Wiring
Connect the DC cable to the PCS through the cable gland. As shown, connect wire + & - to Battery
connector.
Torque value:40lb.in
Battery
Wire+: Red/Orange Wire-: Black
3.4.2 AC Wiring
3.4.2.1 Connect the grid AC cables to the PCS through the cable gland. As shown,connect wire L
and wire N to grid breaker, connect wire PE to the earth terminal Block.
Torque value:27lb.in
3. Installation
N-Blue; L-Brown; PE-Yellow&Green
NOTE: Make sure connect the live wire to L, connect the neutral wire to N, otherwise the
precision of CT will be affected.
N L PE
GRID

APstorage Installation / User Manual
14
3. Installation
3.4.2.2 Connect the backup AC cables to the PCS through the cable gland. As shown,connect wire
N to terminal Block ,and connect wire PE to the earth terminal Block.
Torque value:27lb.in
N-Blue; L-Brown; PE-Yellow&Green
3.4.2.3 Connect the PV AC cables to the PCS through the cable gland. As shown,connect wire N to
terminal Block ,and connect wire PE to the earth terminal Block.
Torque value:27lb.in
N-Blue; L-Brown; PE-Yellow&Green
NOTE: Make sure connect the live wire to L, connect the neutral wire to N, otherwise
the preci sion of CT will be affected.
N L PE
BACKUP
N L PE
PV

APstorage Installation / User Manual
15
3. Installation
3.4.3 Communication Wiring
3.4.3.1 Internet Communication
Using the Internet cable, connect the Internet port into the router. The PCS also can be connected
to router via Wi-Fi, please refer to the chapter 4.5.3.1.
3.5.3.2 Battery Communication
Connect the Battery's RJ45 port to PCS's RJ45 port.
Internet
Communication
Battery
Communication

APstorage Installation / User Manual
16
3. Installation
3.4.4 CT Wiring
Connect the PV CT cable to the PV CT port of the PCS. Connect the GRID CT cable to the GRID CT
port of the PCS.
PV CT
GRID CT
GRID CT
PV CT

APstorage Installation / User Manual
17
3. Installation
The direction of CTs: The arrows on the GRID CT should point from grid to distribution box and the
arrows on the PV CT from distribution box to PV.
Arrow pointing PCS
Arrow pointing PV
PV
Distribution box
GRID CT
PV CT
Distribution box
Grid

APstorage Installation / User Manual
18
3. Installation
NOTE: After the wiring is completed, the nuts of the cable gland must be tightened.
3.5 Install the Lower Cover
As shown,screwing the 8 screws back.

APstorage Installation / User Manual
19
3. Installation
3.6 PV System to APstorage Pairing
1. Identify the largest maximum single load power rating (kW) that you want to backup, and
select the absolute minimum number of PCS units required to meet the 2017 NEC
690.10->710.15(A) requirements. The maximum allowed number of ELS-5K units that can be
connected in parallel is 2.
2. Based on the estimated backup loads for the user defined time period, calculate the required
energy storage (kWh) capacity and the minimum number of battery required.
3. Refer the Table 1 to calculate the maximum PV system power (PV system 1) to connect to the
backup side, if the total PV system power is larger than Max PV system power, connect the
excess power (PV system 2) to the grid side.
Table 1: Maximum PV system power for storage system for backup operation
ELS-5K units
Battery units
Max PV system power (kWac)
1
1
3.75
1
>=2
7.5
2
2
7.5
2
3
11.25
2
>=4
15
Table of contents