
PRIOR TO INSTALLATION
Argent recommends a qualified
trade person t your vanity. Ensure
your furniture is installed to relevant
building codes and Australian
standards.
Please note, Argent will not be liable
for the cost of installation or removal
of the furniture and the warranty will
be voided if damage occurred during
or after installation.
To establish the correct height for
the basin assemble as per steps
1-4 shown in drawings and mark
xing holes.
Fit wall hung basin at required height
to secure stud or frame landing,
ensure level. Fit plumbing.
Remove (1) any shelves, doors
and draws of vanity and set aside
carefully. Carefully turn vanity on
to it’s back. Attach (2) vanity feet
provided. Secure all four feet with
screws provided. Line feet up with
edge of body box or just inside (3)
as shown.
CDoor Adjustment
Feet Adjustment
INSPECT THE FURNITURE TO
ENSURE NO DAMAGE HAS
OCCURRED DURING TRANSIT.
IF DAMAGE HAS OCCURRED,
OR VISIBLE DEFECTS EXIST,
DO N O T P R O CE ED W I TH
INSTALLATION AND ADVISE
ARGENT IMMEDIATELY.
MEASURE & MARK
Hold vanity at an angle as you carefully push the
vanity in towards and up and against the wall.
If ground is uneven under vanity adjust (4) all four feet
to ensure vanity is level.
FIT OFF & ADJUST
Position (5) internal draw box, using locating dowel.
Replace any shelves, doors and adjust to ensure all are
square with the installed vanity.
C
Ensure all gaps are equal & fit is correct
by adjusting all doors & draws.
Forward & Back
Adjustment
Vertical Adjustment
Vertical Adjustment
IMPORTANT:
INSPECT THE FURNITURE TO
ENSURE NO DAMAGE HAS
OCCURRED DURING TRANSIT.
IF DAMAGE HAS OCCURRED, OR
VISIBLE DEFECTS EXIST, DO NOT
PROCEED WITH INSTALLATION
AND ADVISE ARGENT
IMMEDIATELY.