
Contents
Contents
Chapter 1: Overview................................................................................1
1.1 Scope......................................................................................................................................1
1.2 Receiving and Inspecting the Equipment...............................................................................1
1.3 Installation Process.................................................................................................................1
1.4 Safety Information...................................................................................................................2
1.5 Obtaining Technical Assistance............................................................................................. 2
1.6 Specifications..........................................................................................................................3
Chapter 2: Preparation............................................................................7
2.1 Site Selection..........................................................................................................................7
2.2 Tools and Parts Required for Installation...............................................................................8
2.3 Electrostatic Discharge (ESD) Precautions............................................................................9
Chapter 3: Rack Mounting the Switch................................................ 11
3.1 7504N and 7508N Rack Mounting.......................................................................................11
3.1.1 Two-Post Rack Mount............................................................................................ 11
3.1.2 Four-Post Rack Mount............................................................................................13
3.2 7512N and 7516N Shelf Rack Mount Installation................................................................ 17
3.2.1 Assembling the Shelf..............................................................................................18
3.2.2 Inserting the Switch into the Rack..........................................................................22
Chapter 4: Cabling the Modular Switch..............................................25
4.1 Cabling the Power Supplies.................................................................................................25
4.2 Cabling Secondary Ground..................................................................................................26
4.3 Cabling the AC Power Supply..............................................................................................27
4.4 Cabling the DC Power Supply............................................................................................. 27
4.4.1 DC Power Supplies.................................................................................................27
4.4.2 Wire and Lug Preparation...................................................................................... 27
4.4.3 PWR-3K-DC-RED Power Supply............................................................................28
4.5 DC Power Adapter Installation for PWR-2700-DC-R...........................................................29
4.5.1 Connecting the Ground to PWR-2700-DC-R Power Supply...................................29
4.5.2 Connecting the Power Cable Lug to the Terminal Studs........................................30
4.6 Power Supply Specifications................................................................................................32
4.7 Power Supply Configurations...............................................................................................32
4.7.1 Recommendations for Power Supply Usage..........................................................33
4.8 Power Supply Redundancy..................................................................................................33
4.9 Connecting Supervisor Cables.............................................................................................34
4.10 Connecting Line Card Modules and Cables.......................................................................37
Chapter 5: Configuring the Modular Switch.......................................39
Appendix A: Status Indicators.............................................................41
A.1 Supervisor Module............................................................................................................... 41
A.1.1 Supervisor Indicators: 7500E-SUP/7500-SUP2..................................................... 41
iii