manuals.online logo
Brands
  1. Home
  2. •
  3. Brands
  4. •
  5. Axon
  6. •
  7. Industrial Equipment
  8. •
  9. Axon TASER 7 User manual

Axon TASER 7 User manual

COMPLETE TRAINING FIRST.
CONFIRM THE CEW IS READY FOR USE
Check with your armorer to be sure rmware is up to date, the CEW has
the correct set-up for your agency and that the weapon, cartridges, and
battery packs have been properly assigned to you.
INSERT THE BATTERY
A) Insert the battery pack into the weapon. Press rmly until
you hear both latches “click.”
B) Inserting a new battery pack will synchronize the weapon’s logs to
the battery pack and may update the CEW rmware automatically.
Do not remove the battery pack from the CEW until the hourglass
icon disappears from the CID.
CONDUCTED ENERGY WEAPON
QUICK START GUIDE
1
2
3
If the battery pack is fully charged,
the Critical Information Display (CID)
should look like this:
C) Shift the safety switch to the
down (SAFE) position.
WORKING WITH CARTRIDGES
Point the CEW in a safe direction. Be sure the safety is in the down
(SAFE) position. Do not put your hands in front of the cartridges.
Remove the cartridges from the safety clip.
4
5
CARTRIDGE COLOR CODE
BLACK = Live Cartridge,
Stando (3.5°) or
Close-quarter (12°).
For eld use.
BLUE = Hook and Loop
Training (HALT) Cartridge,
Stando (3.5°) or
Close-quarter (12°).
For training use only.
DO NOT USE IN FIELD.
RED = Inert Training
Cartridge (no probes).
For training use only.
DO NOT USE IN FIELD.
If you need assistance, please visit www.axon.com or contact technical support at: US: 1-800-978-2737; Australia: +1 800-051-2069; other international: +1 480-463-2170
TURN THE CEW ON AND OFF
A) Point the CEW in a safe direction.
B) Shift the safety switch to the up
(ARMED) position.
DISASSEMBLE/REASSEMBLE THE CARTRIDGES
A) To disassemble, pull the cartridges apart from each other.
B) To assemble, rst align the attachment tabs.
C) Press the cartridges together.
LOAD THE CARTRIDGES
Never place your hands, ngers, or other body parts in front of the
cartridge. This is especially important when loading and unloading
the cartridge, as serious injury could result. When loading and
unloading always hold the cartridge on the sides.
Be sure to load the cartridges right side up. The top of the cartridge has
text on it.
A) Push the cartridges into the cartridge bay until you hear a “click.”
B) Then give the cartridges a slight tug to ensure they are
locked into place.
6
7
10
RECHARGE THE BATTERY
A) Shift the safety switch to the down (SAFE) position.
B) Conrm the CID is blank.
C) Press the 2 buttons on each side of the battery pack.
D) Pull the battery pack out of the CEW.
E) Press the battery pack into the dock. You should hear a click when
the battery pack is seated properly in the bay.
After the battery is fully recharged and all information is uploaded to
Axon Evidence (Evidence.com) services, the light on the dock next to the
battery pack will be solid green.
8
CONFIRM THE CEW RECOGNIZES
THE CARTRIDGES
After loading the CEW:
A) Point the CEW in a safe direction.
B) Shift the safety switch to the up
(ARMED) position.
C) Conrm the CID displays both cartridges.
D) Shift the safety to the down (SAFE) position.
UNLOAD THE CARTRIDGES
Point the CEW in a safe direction.
Be sure the safety is in the down
(SAFE) position. Do not put your
hands in front of the cartridges.
A) Press the cartridge release
button on top of the CEW.
B) Pull the cartridges up and
out of the CEW.
9
, Axon Evidence, TASER, and are trademarks of Axon Enterprise, Inc., some of which are registered in the US and other countries.
For more information visit axon.com/legal. All rights reserved. ©2020 Axon Enterprise, Inc.
MPC0274
REV D

Other Axon Industrial Equipment manuals

Axon Axopatch 200B User manual

Axon

Axon Axopatch 200B User manual

Axon EZ-Seal User manual

Axon

Axon EZ-Seal User manual

Popular Industrial Equipment manuals by other brands

Siemens 3VL93008LA00 operating instructions

Siemens

Siemens 3VL93008LA00 operating instructions

HOLZMANN MASCHINEN FS160SOLID operating manual

HOLZMANN MASCHINEN

HOLZMANN MASCHINEN FS160SOLID operating manual

ABB TPL69-A32 Operation manual

ABB

ABB TPL69-A32 Operation manual

Noble House Home Furnishings Chair Assembly instructions

Noble House Home Furnishings

Noble House Home Furnishings Chair Assembly instructions

Ceriotti CIX3000 Assembly instruction

Ceriotti

Ceriotti CIX3000 Assembly instruction

Jäger KS2-10/80-2 manual

Jäger

Jäger KS2-10/80-2 manual

LANDY F-WP-N Operator's manual

LANDY

LANDY F-WP-N Operator's manual

ABB HT582010 Operation manual

ABB

ABB HT582010 Operation manual

ABB HT582420 Operation manual

ABB

ABB HT582420 Operation manual

ABB HT564496 Operation manual

ABB

ABB HT564496 Operation manual

SCHUNK PZB-plus Series Assembly and operating manual

SCHUNK

SCHUNK PZB-plus Series Assembly and operating manual

dosatron HSPKD45 Mounting instructions

dosatron

dosatron HSPKD45 Mounting instructions

ABB HT611417 Operation manual

ABB

ABB HT611417 Operation manual

Rego-fix TORCO-BLOCK operating manual

Rego-fix

Rego-fix TORCO-BLOCK operating manual

Siemens SITOP PSU400S operating instructions

Siemens

Siemens SITOP PSU400S operating instructions

Schulze PRETREATMaker III instruction manual

Schulze

Schulze PRETREATMaker III instruction manual

Pepperl+Fuchs ECHO-D-NA Brief instructions

Pepperl+Fuchs

Pepperl+Fuchs ECHO-D-NA Brief instructions

Rockwell Automation Allen-Bradley PowerFlex 750-21G installation instructions

Rockwell Automation

Rockwell Automation Allen-Bradley PowerFlex 750-21G installation instructions

manuals.online logo
manuals.online logoBrands
  • About & Mission
  • Contact us
  • Privacy Policy
  • Terms and Conditions

Copyright 2025 Manuals.Online. All Rights Reserved.