Bailey STT03E User manual

PRODUCT
INSTRUCTION
Elsag Bailey
Process Automation
Type STT03E
Smart Transmitter Terminal

WBPEEUI110501A0
Preface
The information in this instruction provides guidelines and procedures for
installation, operation, and troubleshooting the Type STT03E Smart Trans-
mitter Terminal. This instruction is a supplement to the device product
instructions. The STT03E terminal interfaces to the following devices:
Type AVS Smart Positioner.
Type BCN Pressure Transmitter.
Type EQN Temperature Transmitter.
Type EQS Temperature Transmitter.
Type XM/SM/XE Magnetic Flowmeter.
Type PTS Pressure Transmitter.
TBN480 Conductivity Transmitter.
TBN580 Transmitter.
TBN581 (ORP/pION) Transmitter.

WBPEEUI110501A0
List of Effective Pages
Total number of pages in this instruction is 156, consisting of the following:
Page No. Change Date
Preface Original
List of Effective Pages Original
iii through ix Original
1-1 through 1-6 Original
2-1 through 2-2 Original
3-1 through 3-3 Original
4-1 through 4-20 Original
5-1 through 5-8 Original
6-1 through 6-2 Original
7-1 through 7-6 Original
8-1 through 8-1 Original
A-1 through A-10 Original
B-1 through B-10 Original
C-1 through C-8 Original
D-1 through D-8 Original
E-1 through E-8 Original
F-1 through F-9 Original
G-1 through G-12 Original
H-1 through H-12 Original
I-1 through I-10 Original
Worksheets (9) Original
Index-1 through Index-3 Original
When an update is received, insert the latest changed pages and dispose of the superseded pages.
NOTE: On an update page, the changed text or table is indicated by a vertical bar in the outer margin of the
page adjacent to the changed area. A changed figure is indicated by a vertical bar in the outer margin next to
the figure caption. The date the update was prepared will appear beside the page number.

Table of Contents
Page
WBPEEUI110501A0 iii
SECTION 1 - INTRODUCTION.................................................................................................................1-1
TYPE STT03E DESCRIPTION.......................................................................................................................1-1
INSTRUCTION CONTENT ............................................................................................................................1-1
HOW TO USE THIS INSTRUCTION ............................................................................................................1-2
NOMENCLATURE .........................................................................................................................................1-3
REFERENCE DOCUMENTS..........................................................................................................................1-4
GLOSSARY OF TERMS AND ABBREVIATIONS......................................................................................1-4
SPECIFICATIONS...........................................................................................................................................1-5
OPTIONS AND ACCESSORIES ....................................................................................................................1-6
SECTION 2 - DESCRIPTION AND OPERATION...................................................................................2-1
INTRODUCTION ............................................................................................................................................2-1
FUNCTIONAL OPERATION .........................................................................................................................2-1
PHYSICAL OPERATION ...............................................................................................................................2-1
SECTION 3 - INSTALLATION ..................................................................................................................3-1
INTRODUCTION ............................................................................................................................................3-1
UNPACKING AND INSPECTION.................................................................................................................3-1
SETUP AND PHYSICAL INSTALLATION..................................................................................................3-1
Charging STT03E Terminal .....................................................................................................................3-1
Smart Terminal Cartridge Installation ......................................................................................................3-2
SECTION 4 - OPERATING PROCEDURES ............................................................................................4-1
INTRODUCTION ............................................................................................................................................4-1
HOW TO USE THE PROCEDURE TABLES ................................................................................................4-2
OPERATOR/INTERFACE CONTROLS ........................................................................................................4-2
INITIAL START-UP........................................................................................................................................4-4
SEND CONFIGURATION ..............................................................................................................................4-5
GET CONFIGURATION.................................................................................................................................4-6
VIEW CONFIGURATION ..............................................................................................................................4-8
ERASE CONFIGURATION............................................................................................................................4-9
CHANGING WORKING CONFIGURATION.............................................................................................4-10
OPERATIONAL FUNCTIONS .....................................................................................................................4-11
Special Feature Key................................................................................................................................4-11
FIx Output/Cancel Fix Output Procedure.......................................................................................4-11
LCD Setup Procedure .....................................................................................................................4-12
Standard Configuration...................................................................................................................4-12
Output Key..............................................................................................................................................4-14
Monitor Field Device Output Procedure ........................................................................................4-14
Monitor Field Device Input Procedure ...........................................................................................4-14
Monitor Secondary Units Output Procedure ..................................................................................4-15
Temperature Function Procedure ...................................................................................................4-16
Status Check Procedure ..........................................................................................................................4-16
F1 Key (Copy Configurations to and from STC Cartridges) .................................................................4-17
Copy STT03E Configs to STC Cartridge.......................................................................................4-17
Copy STC Configs to STT03E Terminal .......................................................................................4-18
ERASE Configuration from STC Cartridge ...................................................................................4-19
Rerange Key ...........................................................................................................................................4-19

iv WBPEEUI110501A0
Table of Contents (continued)
Page
SECTION 5 - TROUBLESHOOTING....................................................................................................... 5-1
INTRODUCTION ........................................................................................................................................... 5-1
ERROR MESSAGES ...................................................................................................................................... 5-1
SECTION 6 - MAINTENANCE................................................................................................................. 6-1
INTRODUCTION ........................................................................................................................................... 6-1
CLEANING ..................................................................................................................................................... 6-1
SECTION 7 - REPAIR/REPLACEMENT AND UPGRADE ................................................................... 7-1
INTRODUCTION ........................................................................................................................................... 7-1
SPECIAL HANDLING PROCEDURES FOR MOS DEVICES.................................................................... 7-1
DISASSEMBLY OF TYPE STT03E TERMINAL CASE ............................................................................. 7-2
REPLACING TYPE STT03E TERMINAL EPROM (FIRMWARE UPGRADE)........................................ 7-3
REPLACING NVRAM ................................................................................................................................... 7-3
REPLACING RECHARGEABLE BATTERIES ........................................................................................... 7-4
REASSEMBLING THE TYPE STT03E TERMINAL CASE........................................................................ 7-5
RECOMMENDED SPARE PARTS FOR TYPE STT03E TERMINAL ....................................................... 7-5
SECTION 8 - SUPPORT SERVICES ........................................................................................................ 8-1
INTRODUCTION ........................................................................................................................................... 8-1
REPLACEMENT PARTS............................................................................................................................... 8-1
SPARE PARTS LISTS.................................................................................................................................... 8-1
TRAINING ...................................................................................................................................................... 8-1
TECHNICAL DOCUMENTATION............................................................................................................... 8-1
APPENDIX A - AVS SMART POSITIONER............................................................................................A-1
INTRODUCTION ...........................................................................................................................................A-1
AVS CONFIGURATION FUNCTIONS ........................................................................................................A-1
CREATE/MODIFY CONFIGURATION .......................................................................................................A-2
CALIBRATION ..............................................................................................................................................A-6
Output D-to-A Calibration.......................................................................................................................A-7
Input A-to-D Calibration .........................................................................................................................A-8
Manual Position Calibration ....................................................................................................................A-8
Automatic Position Calibration ...............................................................................................................A-9
APPENDIX B - BCN PRESSURE TRANSMITTER................................................................................B-1
INTRODUCTION ...........................................................................................................................................B-1
BCN CONFIGURATION FUNCTIONS........................................................................................................B-1
CREATE/MODIFY CONFIGURATION .......................................................................................................B-2
CALIBRATION ..............................................................................................................................................B-5
Bench Calibration ....................................................................................................................................B-6
Rezero ......................................................................................................................................................B-8
D-to-A Adjust ..........................................................................................................................................B-9
APPENDIX C - EQN TEMPERATURE TRANSMITTER ......................................................................C-1
INTRODUCTION ...........................................................................................................................................C-1
EQN CONFIGURATION ...............................................................................................................................C-1
CREATE/MODIFY CONFIGURATION .......................................................................................................C-2

WBPEEUI110501A0 v
Table of Contents (continued)
Page
APPENDIX C - EQN TEMPERATURE TRANSMITTER (continued)
CALIBRATION ..............................................................................................................................................C-5
Bench Calibration ....................................................................................................................................C-6
D-to-A Adjust ..........................................................................................................................................C-7
APPENDIX D - EQS TEMPERATURE TRANSMITTER.......................................................................D-1
INTRODUCTION ...........................................................................................................................................D-1
EQS CONFIGURATION................................................................................................................................D-1
CREATE/MODIFY CONFIGURATION .......................................................................................................D-2
CALIBRATION ..............................................................................................................................................D-5
Bench Calibration ....................................................................................................................................D-6
D-to-A Adjust ..........................................................................................................................................D-8
APPENDIX E - XM/SM/XE MAGNETIC FLOWMETER ...................................................................... E-1
INTRODUCTION ........................................................................................................................................... E-1
XM/SM/XE MAGFLOW CONFIGURATION FUNCTIONS....................................................................... E-1
CREATE/MODIFY CONFIGURATION ....................................................................................................... E-2
CALIBRATION .............................................................................................................................................. E-6
Empty Pipe Detector................................................................................................................................ E-6
D-to-A Adjust .......................................................................................................................................... E-7
APPENDIX F - PTS PRESSURE TRANSMITTER................................................................................ F-1
INTRODUCTION ........................................................................................................................................... F-1
PTS CONFIGURATION FUNCTION PROCEDURES ................................................................................ F-1
CREATE/MODIFY CONFIGURATION ....................................................................................................... F-2
CALIBRATION .............................................................................................................................................. F-5
Bench Calibration .................................................................................................................................... F-6
Rezero ...................................................................................................................................................... F-7
D-to-A Adjust .......................................................................................................................................... F-8
APPENDIX G - TBN480 CONDUCTIVITY TRANSMITTER ................................................................G-1
INTRODUCTION ...........................................................................................................................................G-1
TBN480 CONFIGURATION..........................................................................................................................G-1
CREATE/MODIFY CONFIGURATION .......................................................................................................G-2
CALIBRATION ..............................................................................................................................................G-5
Process Calibration ..........................................................................................................................................G-5
Calibrate Process Conductivity........................................................................................................G-6
Calibrate Process Temperature ........................................................................................................G-7
Editing the Calibration Constants ............................................................................................................G-9
Edit Conductivity.............................................................................................................................G-9
Edit Temperature ...........................................................................................................................G-10
Reset to Factory Configuration..............................................................................................................G-11
APPENDIX H - TBN580 TRANSMITTER ...............................................................................................H-1
INTRODUCTION ...........................................................................................................................................H-1
TBN580 CONFIGURATION..........................................................................................................................H-1
CREATE/MODIFY CONFIGURATION .......................................................................................................H-2
CALIBRATION ..............................................................................................................................................H-5
Process Calibration ..................................................................................................................................H-6
Bench Calibration pH ..............................................................................................................................H-8
Bench Calibration Temperature.............................................................................................................H-10

vi WBPEEUI110501A0
Table of Contents (continued)
Page
APPENDIX H - TBN580 TRANSMITTER (continued)
D-to-A Adjust ........................................................................................................................................H-11
APPENDIX I - TBN581 (ORP/pION) TRANSMITTER............................................................................I-1
INTRODUCTION ............................................................................................................................................ I-1
TBN581 (ORP/pION) CONFIGURATION..................................................................................................... I-1
CREATE/MODIFY CONFIGURATION ........................................................................................................ I-2
CALIBRATION ............................................................................................................................................... I-4
Process Calibration ................................................................................................................................... I-5
Bench Calibration (ORP/pION)................................................................................................................ I-6
Bench Calibration (mV)............................................................................................................................ I-8
D-to-A Adjust ........................................................................................................................................... I-9
List of Figures
No. Title Page
2-1. Analog Point-to-Point Wiring.................................................................................................................. 2-2
2-2. Digital Field Bus Wiring.......................................................................................................................... 2-2
3-1. Cartridge Installation ............................................................................................................................... 3-2
7-1. Internal Component Locations................................................................................................................. 7-2
A-1. Configuration Flowchart (AVS)...............................................................................................................A-2
A-2. Calibration Flowchart (AVS) ...................................................................................................................A-6
B-1. Configuration Flowchart (BCN)..............................................................................................................B-2
B-2. Calibration Flowchart (BCN) ..................................................................................................................B-6
C-1. Configuration Flowchart (EQN) ..............................................................................................................C-2
C-2. Calibration Flowchart (EQN) ..................................................................................................................C-5
D-1. Configuration Flowchart (EQS)...............................................................................................................D-2
D-2. Calibration Flowchart (EQS) ...................................................................................................................D-6
E-1. Configuration Flowchart (XM/SM/XE Mag Flow).................................................................................E-2
E-2. Calibration Flowchart (XM/SM/XE Mag Flow) ..................................................................................... E-6
F-1. Configuration Flowchart (PTS) ............................................................................................................... F-2
F-2. Calibration Flowchart (PTS).................................................................................................................... F-6
G-1. Configuration Flowchart (TBN480) ........................................................................................................G-2
G-2. Calibration Flowchart (TBN480).............................................................................................................G-6
H-1. Configuration Flowchart (TBN580) ........................................................................................................H-2
H-2. Calibration Flowchart (TBN580).............................................................................................................H-6
I-1. Configuration Flowchart (TBN581) ......................................................................................................... I-2
I-2. Calibration Flowchart (TBN581).............................................................................................................. I-5

List of Tables
No. Title Page
WBPEEUI110501A0 vii
1-1. Smart Terminal Cartridge Nomenclature .................................................................................................1-3
1-2. STT03E Support Combinations................................................................................................................1-3
1-3. Reference Documents ...............................................................................................................................1-4
1-4. Glossary of Terms and Abbreviations ......................................................................................................1-4
1-5. STT03E Terminal Specifications .............................................................................................................1-5
1-6. STC Cartridge Specifications ...................................................................................................................1-6
4-1. STT03E Keypad Functions.......................................................................................................................4-2
4-2. STT03E Function Groupings....................................................................................................................4-4
4-3. STT03E Scroll Characters ........................................................................................................................4-4
5-1. STT03E Error Messages...........................................................................................................................5-1
7-1. List of Spare Parts.....................................................................................................................................7-6

viii WBPEEUI110501A0
Safety Summary
GENERAL
WARNINGS
Equipment Environment
All components, whether in transportation, operation or storage, must be in
a noncorrosive environment.
Electrical Shock Hazard During Maintenance
Disconnect power or take precautions to insure that contact with energized
parts is avoided when servicing.
SPECIFIC
WARNINGS
Nonrechargeable batteries may explode or leak if recharged. This unit con-
tains six rechargeable batteries. If battery replacement is required replace
all batteries at same time and only with rechargeable type. To prevent igni-
tion of a hazardous atmosphere, batteries must only be charged or changed
in an area known to be nonhazardous. (p. 3-1, 7-4)
System maintenance must be performed only by qualified personnel and
only after securing equipment controlled by the circuit. Altering or remov-
ing components from an active circuit may upset the process being con-
trolled. (p. 6-1)
Explosionproof/dust-ignitionproof installations and intrinsically safe
installations in Class II or Class III hazardous locations require that the
assembly be kept tight while circuits are live unless the location is known
to be nonhazardous at the time. (p. 6-1)
SPECIFIC
CAUTIONS
Do not allow cleaning solution or any other liquid to enter the terminal
case as it will damage internal components. (p. 6-1)

WBPEEUI110501A0 ix
Sommaire de Sécurité
AVERTISSEMENTS
D’ORDRE
GÉNÉRAL
Environnement de l’équipement
Ne pas soumettre les composants à une atmosphère corrosive lors du trans-
port, de l’entreposage ou l’utilisation.
Possibilité de chocs électriques durant l’entretien
Débrancher l’alimentation ou prendre les précautions pour éviter tout con-
tact avec des composants sous tension durant l’entretien.
AVERTISSEMENT
D’ORDRE
SPECIFIQUE
Les piles non-rechargable peuvent exploser ou couler si recharg'ees. Cet
ensemble comprend six piles rechargables. Si le remplacement d'une pile
est requis, Replacer toutes les piles en même temps en utilisant des piles de
type rechargeable seulement. Afin d'èviter l'ignition d'une atmosphère que
dans un endroit où le danger est manifestement inexistant. (p. 3-1, 7-5)
L'entretien du système ne doit être effectuquèe par le personnel qualifiè et
seulement une fois que l'èquipement contrôlè par le circuit est fixè en
place. La modification ou le retrait des composants d'un circuit actif pour-
raient perturber le processus controlè. (p. 6-1)
En ce qui concerne l'installation anti-explosion et anti-ignition provoquè
par la poussière dans des endroits se Classe II ou Class III, il est indispens-
able que l'assemblage soit tenu ètanche pendant que les circuits sont èlec-
trises, a moins que cet endroit ne prsente aucun danger a ce moment-la. (p.
6-1)
ATTENTION
D’ORDRE
SPECIFIQUE
Ne pas laisser une solution nettoyante ou un quelconque liquide pènètrer le
botier de raccordement, ceci pourrait endommager les composants
internes. (p. 6-1)

TYPE STT03E DESCRIPTION
WBPEEUI110501A0 1 - 1
SECTION 1 - INTRODUCTION
TYPE STT03E DESCRIPTION
The Type STT03E Smart Transmitter Terminal is a battery powered, porta-
ble communication device that is designed for use with the Bailey-Fischer &
Porter line of smart electronic instrumentation. The basic terminal firmware
supports all Type PTS Platinum Standard™ Transmitters and Type EQS
Platinum Standard Temperature transmitters. The Type STT03E terminal
interfaces the Type BCN, EQN, AVS, Mag Flow, and Series TBN transmit-
ters using smart terminal cartridges (STC). Refer to Table 1-1 for Type STC
cartridge nomenclature. Table 1-2 lists the functionality of the terminal with
the Type STC cartridge combinations.
The STT03E terminal configures, calibrates, modifies, troubleshoots, and
verifies the operation of Bailey-Fischer & Porter smart devices from various
remote locations.
The STT03E terminal has 32 keys, including 12 numeric keys. Four of the
keys are arrow keys. There are ten operation keys that provide menus and
screens for various functions. In addition there are two function keys, one for
future use and the other used to copy configurations to and from STC car-
tridges.
The STT03E terminal operates for approximately 24 continuous hours with
a full charge on six AA NiCd rechargeable batteries. Each terminal includes
a battery charger. The internal nonvolatile memory (NVRAM) maintains
information for approximately ten years.
INSTRUCTION CONTENT
Description and Operation Describes the STT03E terminal operating modes and communication
method.
Installation Presents information on making the STT03E terminal operational. Proce-
dures detail unpacking, setup and battery charging.
Operating Procedures Describes the numeric key pad and the function keys located on the STT03E
terminal.
Troubleshooting Provides a complete list of error messages that can display on the STT03E
terminal. Each message has a probable cause, affected device, and corrective
action.
™ Trademark of Elsag Bailey Process Automation.
Maintenance Provides maintenance information as it pertains to the STT03E terminal.
Repair/Replacement and
Upgrade Procedures
Provides handling and disassembly procedures for various
terminal components and a list of recommended spare parts.

INTRODUCTION
HOW TO USE THIS INSTRUCTION
1 - 2 WBPEEUI110501A0
Support Services Provides replacement and spare parts, training, and technical documentation
information.
AVS Smart Positioner Covers configuration and calibration procedures for the Type AVS Smart
Positioner.
BCN Pressure Transmitter Covers configuration and calibration procedures for the Type BCN Pressure
Transmitter.
EQN Temperature
Transmitter
Covers configuration and calibration procedures for the Type EQN Tempera-
ture Transmitter.
EQS Temperature
Transmitter
Covers configuration and calibration procedures for the Type EQS Tempera-
ture Transmitter.
XM/SM/XE Magnetic
Flowmeter
Covers configuration and calibration procedures for the
XM/SM/XE Magnetic Flowmeter.
PTS Pressure Transmitter Covers configuration and calibration procedures for the Type PTS Pressure,
Temperature and Level Transmitters.
TBN480 Conductivity
Transmitter
Covers configuration and calibration procedures for the Series TBN480
Conductivity Transmitter.
TBN580 Transmitter Covers configuration and calibration procedures for the Series TBN580 pH
Transmitter.
TBN581 (ORP/pION)
Transmitter
Covers configuration and calibration procedures for the Series TBN581
(ORP/pION) Transmitter.
HOW TO USE THIS INSTRUCTION
Read this instruction completely through in sequence. It is important to
become familiar with the entire contents of this instruction before installing
and using the STT03E and the STC cartridges. Once complete:
1. Perform the steps in Section 3. Make sure all hardware is installed prop-
erly before connecting the STT03E.
2. Refer to Section 4 once installation is complete for information on the
use of the STT03E.
3. Refer to the appropriate appendix when configuring and calibrating a
field device.
4. Each device has a configuration worksheet located at the back of this
instruction. Use the worksheets to keep a hard copy record of the device con-
figuration.
NOMENCLATURE
The basic STT03E terminal firmware supports PTS and EQS transmitters.
STC cartridges are available to support TBN, BCN, EQN, Mag Flow, and

INTRODUCTION
REFERENCE DOCUMENTS
WBPEEUI110501A0 1 - 3
AVS field devices. The STC cartridges plug into the bottom of the terminal.
Table 1-1 lists the nomenclature for the cartridges. Use this table to order the
desired cartridge. Table 1-2 summarizes the device support combinations of
the STT03E terminal.
REFERENCE DOCUMENTS
Table 1-3 lists the instructions related to the STT03E terminal.
Table 1-1. Smart Terminal Cartridge Nomenclature
Position 123456
Type S T C MMM Smart Terminal Cartridges
Transmitter type
1 TBN480/580/581, AVS
2AVS
3 BCN, EQN
4 XM/SM/XE Mag Flow
ACartridge firmware level1
Language
E English
FFrench
SSpanish
NOTE:
1. The original design will be designated by the letter Ain the fifth nomenclature position,
and will change to B, C, D, etc. as revisions are made.
Table 1-2. STT03E Support Combinations
STT03E STT03E with
STC1ME
STT03E with
STC2ME
STT03E with
STC3ME
STT03E with
STC4ME
PTS
EQS
PTS
EQS
AV S
TBN480
TBN580
TBN581
PTS
EQS
AV S
PTS
EQS
BCN
EQN
PTS
EQS
Magflow
Table 1-3. Reference Documents
Number Document
I-E21-31 Smart Electronic Pressure Transmitter Type BCN1
I-E21-32 Smart Electronic Pressure Transmitter Type BCN2/3/4/5/6/8
I-E21-37 Smart Electronic Level Transmitter Type BCN7

INTRODUCTION
GLOSSARY OF TERMS AND ABBREVIATIONS
1 - 4 WBPEEUI110501A0
GLOSSARY OF TERMS AND ABBREVIATIONS
Table 1-4 is a glossary of terms and abbreviations used in this instruction. It
contains those terms and abbreviations that are unique to Bailey-Fischer &
Porter or have a definition that is different from standard industry usage.
SPECIFICATIONS
Table 1-5 lists the performance specifications of the STT03E terminal. Table
1-6 lists performance specifications for the STC cartridge.
I-E21-50-1 Platinum Standard Series Smart Pressure Transmitter Type PTSD
I-E21-50-2 Platinum Standard Series Smart Level Transmitter
Type PTSDL
I-E21-51 Platinum Standard Series Smart Pressure Transmitter Type PTSP
I-E51-80-001 Platinum Standard Series Smart Temperature Transmitter Type
EQS
I-E51-79 Smart Temperature Transmitter Type EQN
I-E67-38 Smart pH/ORP Specific Ion Transmitter Series
TBN580/581
I E67-42 Smart Conductivity Transmitter Series TBN 480
I-E96-302 Field Bus Slave Module IMFBS01
I-P88-27 Smart Positioner Type AVS
Table 1-3. Reference Documents (continued)
Number Document
Table 1-4. Glossary of Terms and Abbreviations
Term Definition
Smart transmitter A field measuring device that utilizes digital communication
to transmit information.
MFC Multi-function controller module. A multiple-loop controller
with data acquisition and information processing capabilities.
MFP Multi-function processor module. A multiple-loop controller
with data acquisition and information processing capabilities.
Table 1-5. STT03E Terminal Specifications
Property Characteristic/ Value
Display format
Type
Number of rows
Characters per row
LCD
4
16

INTRODUCTION
SPECIFICATIONS
WBPEEUI110501A0 1 - 5
Configuration storage
capacity
70 configurations
Keyboard type Tactile feedback embossed membrane; 32 keys
Cable length 1.8 m (5 ft 10 in.)
Temperature limits
Operating
Storage
0°to 50°C (32°to 122°F)
-20°to 70°C (-4°to 158°F)
Humidity limits 95%, noncondensing
Batteries
Type
Continuous run time
Charging time
6 AA NiCd rechargeable
24 hours
48 hours
Weight 635 g (22.4 oz)
Dimensions (HxWxD) 197 x 110 x 51 mm (7.75 x 4.30 x 2.00 in)
Case material Plastic, polycarbonate (Lexan 940®or
equivalent)
Agency certifications1Factory Mutual (FM) approval and Canadian Stan-
dards Association (CSA) certifications in the follow-
ing categories:
Nonincendive:
Class I; Division 2; Groups A, B, C, D
Intrinsically Safe:
Class I; Division 1; Groups A, B, C, D
NOTE:
1. Hazardous location approvals for use in flammable atmospheres are for ambient conditions of -25°to 40°C
(-13°to 104°F), 86 to 106 kPa (12.5 to 15.7 psi) with a maximum oxygen concentration of 21 percent.
SPECIFICATIONS SUBJECT TO CHANGE WITHOUT NOTICE
Table 1-6. STC Cartridge Specifications
Property Characteristic/Value
Memory type Nonvolatile random access memory (NVRAM). Retains
data when power is removed.
Configuration storage
capacity
85 configurations
Data retention 10 years average life
Temperature limits
Operating
Storage
0° to 70°C (32° to 158°F)
-40°to 85°C (-40°to 185°F)
Cartridge insertion Keyed design to ensure correct insertion
Table 1-5. STT03E Terminal Specifications
Property Characteristic/ Value
® Registered trademark of General Electric Co., Noryl Products Dept.

INTRODUCTION
OPTIONS AND ACCESSORIES
1 - 6 WBPEEUI110501A0
OPTIONS AND ACCESSORIES
Type STC Smart Terminal Cartridges are available to allow the STT03E ter-
minal to interface to other devices. Order STC cartridges by nomenclature
(Table 1-1). Refer to RECOMMENDED SPARE PARTS FOR TYPE
STT03E TERMINAL in Section 7 for other available items related to the
STT03E terminal.
Weight 53 g (1.9 oz)
SPECIFICATIONS SUBJECT TO CHANGE WITHOUT NOTICE
Table 1-6. STC Cartridge Specifications (continued)
Property Characteristic/Value

INTRODUCTION
WBPEEUI110501A0 2 - 1
SECTION 2 - DESCRIPTION AND OPERATION
INTRODUCTION
This section describes the operational modes of the Type STT03E Smart
Transmitter Terminal and contains diagrams of the wiring connections
between the field device and the terminal.
FUNCTIONAL OPERATION
The STT03E terminal operates with a field device by attaching clip leads
from the terminal to the signal wires of the field device. Communication
occurs over the signal wires and can support up to fifteen devices when
interfacing the Bailey-Fischer & Porter digital field bus. The field device and
terminal communicate by using frequency shift keying (FSK). FSK is a form
of frequency modulation used for digital communication. The communica-
tion signal is a high frequency AC signal with a DC average of zero. There-
fore, digital communication and process variable output can occur
simultaneously.
PHYSICAL OPERATION
The STT03E terminal connects to the field device anywhere there is access
to the signal leads of the transmitter for point-to-point. The STT03E terminal
must be connected between the device and the 250 ohm resistance. The clip
leads connect across the signal leads independent of signal direction or
polarity. Refer to Figures 2-1 and 2-2.
Figure 2-1. Analog Point-to-Point Wiring
STT03E
TP30241C
+–
–
+
COMMUNICATIONS ARE
NOT POSSIBLE ON THIS
SIDE OF 250- RESISTOR
Ω
COMMUNICATIONS ARE
POSSIBLE ON THIS SIDE
OF 250- RESISTOR
Ω
SIGNAL WIRES
UP TO 1 MI. (1.6 KM)
+
+
SYSTEM POWER
SUPPLY
CONTROLLER,
RECORDER OR
CONTROL SYSTEM
250
Ω

DESCRIPTION AND OPERATION
PHYSICAL OPERATION
2 - 2 WBPEEUI110501A0
Figure 2-2. Digital Field Bus Wiring
STT03E
TP3 0242B
SIGNAL WIRES
TRANSMITTER 7TRANSMITTER 1 TRANSMITTER 8
TERMINATION
UNIT
FIELD BUS
I/O MODULE MFP/MFC
–+
TEST
–+
PWR/
OUTPUT
–+
TEST
–+
PWR/
OUTPUT
–+
TEST
–+
PWR/
OUTPUT

INTRODUCTION
WBPEEUI110501A0 3 - 1
SECTION 3 - INSTALLATION
INTRODUCTION
This section provides procedures that make the Type STT03E Smart Trans-
mitter terminal operational.
UNPACKING AND INSPECTION
Before unpacking, carefully examine the exterior of the shipping container
for evidence of in-transit damage. Inspect for punctures, tears or other dam-
age that penetrates the outer container, and for evidence of water damage.
Examine the exterior of the STT03E terminal for cracks, scratches, or any
physical defects that may be present.
NOTE: Storage temperatures must not exceed the following limits: -20°to
+70°C (-4°to +158°F).
If storing the terminal prior to operation, pack in the original container, if
possible. Store in an area free of extremes in temperature and humidity.
SETUP AND PHYSICAL INSTALLATION
The only installation task is the connection of the provided clip leads. Other-
wise, the STT03E terminal comes fully assembled and operational.
Charging STT03E Terminal
Periodically the six AA batteries require charging. Use the battery charger,
Bailey-Fischer & Porter part number 19485801.
With a full charge, the STT03E terminal can operate continuously for 24
hours without a recharge.
WARNING
Nonrechargeable batteries may explode or leak if recharged. This unit
contains six rechargeable batteries. If battery replacement is required,
replace all batteries at same time and only with the rechargeable type.
To prevent ignition of a hazardous atmosphere, batteries must only be
charged or changed in an area known to be nonhazardous.
AVERTISSEMENT
Les piles non-rechargable peuvent exploser ou couler si recharg'ees.
Cet ensemble comprend six piles rechargables. Si le remplacement
d'une pile est requis, Replacer toutes les piles en même temps en util-
isant des piles de type rechargeable seulement. Afin d'èviter l'ignition
d'une atmosphère que dans un endroit où le danger est manifestement
inexistant.

INSTALLATION
SETUP AND PHYSICAL INSTALLATION
3 - 2 WBPEEUI110501A0
To charge the STT03E terminal:
1. Insert the male end of charger into the receptacle of terminal. The loca-
tion of the receptacle is at the top of the terminal near the display screen.
2. Plug the charger into a 120 VAC, 50/60 hertz outlet.
3. Allow the terminal to charge at least one hour before operating. A full
charge takes approximately 48 hours. The terminal can operate while
recharging is in progress.
Smart Terminal Cartridge Installation
The basic firmware of the STT03E terminal interfaces two device types: PTS
and EQS transmitters. STC cartridges are available that allow the STT03E
terminal to address other devices (refer to NOMENCLATURE in Section 1).
The cartridge slides into the bottom of the terminal and can store up to 85
configurations.
To install an STC cartridge:
1. Turn the STT03E terminal off.
2. Insert the cartridge (label facing out) into the receptacle at the bottom of
the terminal (Fig. 3-1).
3. Make sure the cartridge is firmly seated in the terminal.
Figure 3-1. Cartridge Installation
TP55204B
Table of contents
Other Bailey Touch Terminal manuals