BASS GRAPHIC EQUALIZER BEQ700
2. WARRANTY
For our current warranty terms, please refer to our website at http://
www.behringer.com.
3. SPECIFICATIONS
In
onnector 1/4" TS
Impedance 500 kW
Out
onnector 1/4" TS
Impedance 1 kW
Power supply 9 V, 100 mA D regulated
PSU-SB- N BEHRINGER 220 VA adaptor hina
PSU-SB-EU BEHRINGER 230 VA adaptor Europe
PSU-SB-JP BEHRINGER 100 VA adaptor Japan
PSU-SB-SAA BEHRINGER 240 VA adaptor Australia
PSU-SB-UK BEHRINGER 240 VA adaptor UK
PSU-SB-UL BEHRINGER 115 VA adaptor USA
Power connector 2 mm D jack, negative center
Battery 9 V type 6LR61
Power consumption 30 mA
Dimensions (H x W x D) approx. 54 mm (2 1/8") x 70 mm (2 3/4") x 123 mm (4 4/5")
Weight approx. 0.33 kg (0.73 lbs)
BEHRINGER is constantly striving to maintain the highest professional standards. As a result of these efforts, modifications
may be made from time to time to e isting products without prior notice. Specifications and appearance may therefore differ from
those listed or shown.
4. SAFETY INSTRUCTIONS
Do not use near water, or install near heat sources. Use only authorized attachments/accessories. Do not service product yourself.
Contact our qualified servicing personnel for servicing or repairs, especially when power supply cord or plug is damaged.
No utilizar cerca de agua o instalar cerca de fuentes de calor. Utilice sólo accesorios y aditamentos autorizados. No intenté
reparar el producto usted mismo. Contacte a nuestro personal técnico cualificado para servicio y reparaciones, especialmente
cuando la fuente o el cable de alimentación estén dañados.
Íåýêñïëóàòèðóéòåïðèáîðâáëèçèîòèñòî÷íèêîââîäûèòåïëà.Ïðèìåíÿéòåòîëüêîàâòîðèçîâàííûåäîïîëíèòåëüíûå
óñòðîéñòâà.Íèêîãäàíåðåìîíòèðóéòåïðèáîðñàìîñòîÿòåëüíî.Ðåìîíòìîæåòïðîèçâîäèòüòîëüêîêâàëèôèöèðîâàííûé
ñïåöèàëèçèðîâàííûéïåðñîíàë
îñîáåííîïðèïîâðåæäåíèÿõñåòåâîãîïðîâîäàèëèñåòåâîéâèëêè.
Technical specifications and appearance subject to change without notice. The information contained herein is correct at the time
of printing. The names of companies, institutions or publications pictured or mentioned and their respective logos are registered
trademarks of their respective owners. Their use neither constitutes a claim of the trademarks by BEHRINGER® nor affiliation of
the trademark owners with BEHRINGER®. BEHRINGER® accepts no liability for any loss which may be suffered by any person
who relies either wholly or in part upon any description, photograph or statement contained herein. Colours and specification may
vary slightly from product. Products are sold through our authorised dealers only. Distributors and dealers are not agents of
BEHRINGER® and have absolutely no authority to bind BEHRINGER® by any e press or implied undertaking or representation.
No part of this manual may be reproduced or transmitted in any form or by any means, electronic or mechanical, including
photocopying and recording of any kind, for any purpose, without the e press written permission of BEHRINGER Spezielle
Studiotechnik GmbH. BEHRINGER® is a registered trademark. ALL RIGHTS RESERVED. © 2005 BEHRINGER Spezielle
Studiotechnik GmbH, Hanns-Martin-Schleyer-Str. 36-38, 47877 Willich-Münchheide II, Germany. Tel. +49 2154 9206 0,
Fa +49 2154 9206 4903
Die deutsche Anleitung ist erhältlich @ www.behringer.com
Manuel francophone en téléchargement sur www.behringer.com
Manual en español disponible en www.behringer.com
Manuali italiani disponibili @ www.behringer.com
Ðóññêîÿçû÷íîåðóêîâîäñòâî@www.behringer.com
Polskainstrukcjadostêpnajestpodadresem@www.behringer.com
Nederlandse handleiding beschikbaar @ www.behringer.com
Suomenkielinen kä ttöohje saatavilla osoitteesta www.behringer.com
Svensk manual finns tillgänglig på www.behringer.com
Dansk vejledning findes på @ www.behringer.com
Manual português disponível @ www.behringer.com
Åëëçíéêü åã÷åéñßäéï õðÜñ÷åé äéáèÝóéìï óôç äéåýèõíóç www.behr nger.com