
5. Cut new inflation tube to appropriate lengt - measure using old ose.
6. Slide click-valve onto new tube.
7. Slide neoprene cover over click-valve.
8. Form 2 zip-ties into 2 rings.
9. Slide zip-tie over eac end of inflation ose.
10. Press ose firmly down onto EZ-valve on strut and LE- tube must sit flus wit valve.
11. Locate zip-tie around centre of overlap between tube and EZ-valve.
12. Cinc up zip tie using pliers- repeat for ot er end of tube.
13. Inflate kite to normal pressure and use water to c eck new tube is airtig t at bot ends.
14. Go-kite.