
10
1. Communicaon Interface (ConcertTM Boiler Control)
Boiler
2. Main appliance control
3. Control box
-
ing purposes.
4. ON/OFF switch
5. Main gas valve
6. Blower
7. BluejetR burner
Burner is mounted
8. Ignion electrode
-
9. Flame observaon port
10. Thermal fuse
0F,
11. High gas pressure switch
12. Low gas pressure switch
13. Outlet/Supply water connecon
14. Water ow switch
15. Gas supply line
the gas train assembly. See
pipe sizes.
16. Inlet/Return water connecon
sizes.
17. Supply/outlet water temperature sensor
-
18. Return/Inlet water temperature sensor
temperature rise.
19. Low water cut o probe and reset box
20. Temperature and pressure gauge
readings.
21. Pressure relief valve
all models.
22. Condensate drain trap
drain line.
23. Minimum combuson air proving switch
-
24. Blocked vent switch
vent piping.
25. Combuson air lter box
-
26. Exhaust vent connecon
6
27. Heat exchanger
316L Stainless Steel, Condensing, water tube type heat