NERRA INSTALLATION GUIDE
Mountng Surface
Cable Hole
Mountng Surface
Energy Cable
Mountng Case
a
ab
a
ab
2) - In whch drecton the power cable wll be routed
to the mountng frame, the cable hole on that
surface s opened.
- Mountng case s screwed to the mountng surface
and tghtened by passng the cable hole.
3) -Electrcal connecton s done and the lumnare s placed.
IP 68 Termnal
Block
*Page 3
When connectng the
lumnares, make sure that the
same color cables are
matchng. (L) Brown
( ) Yellow - Green
(N) Blue
Resn
or
4) Screw the lumnare.
*Optonal
(+) Brown
( ) Green
(-) Grey
DALI CONTROL CONNECTION
(DA) Yellow
(DA) Whte
*Please contact us for cables if in different colors. *Optonal