
Table of Contents
2 | 44 Instruction Manual R5 RA 0165-0305 D_EN_en
Table of Contents
1 Safety..................................................................................................................................................................... 4
2 Product Description............................................................................................................................................. 5
2.1 Operating Principle ............................................................................................................................................. 6
2.2 Intended Use ....................................................................................................................................................... 6
2.3 Start Controls....................................................................................................................................................... 6
2.4 Optional Accessories........................................................................................................................................... 6
2.4.1 Gas Ballast Valve ................................................................................................................................... 6
2.4.2 Inlet Filter............................................................................................................................................... 7
2.4.3 Water-oil Heat Exchanger .................................................................................................................... 7
2.4.4 Temperature Switch "Oil"..................................................................................................................... 7
2.4.5 Resistance Thermometer..................................................................................................................... 7
2.4.6 Level Switch ........................................................................................................................................... 7
2.4.7 Pressure Switch..................................................................................................................................... 7
2.4.8 Pressure Transmitter............................................................................................................................ 7
3 Transport .............................................................................................................................................................. 8
4 Storage .................................................................................................................................................................. 9
5 Installation ........................................................................................................................................................... 10
5.1 Installation Conditions........................................................................................................................................ 10
5.2 Connecting Lines / Pipes .................................................................................................................................... 11
5.2.1 Suction Connection............................................................................................................................... 11
5.2.2 Discharge Connection .......................................................................................................................... 12
5.2.3 Cooling Water Connection (Optional)................................................................................................. 13
5.3 Filling Oil............................................................................................................................................................... 15
5.4 Fitting the Coupling ............................................................................................................................................ 16
6 Electrical Connection........................................................................................................................................... 17
6.1 Machine delivered with a Control Box (Option) .............................................................................................. 17
6.2 Machine delivered without Control Box or Variable Speed Drive (VSD)....................................................... 18
6.3 Machine delivered with a Variable Speed Drive (Option)............................................................................... 19
6.4 Wiring Diagram Three-Phase Motor................................................................................................................. 20
6.5 Electrical Connection of the Monitoring Devices ............................................................................................ 21
6.5.1 Wiring Diagram Level Switch (Optional) ............................................................................................ 21
6.5.2 Wiring Diagram Temperature Switch "Oil" (Optional)...................................................................... 21
6.5.3 Wiring Diagram Resistance Thermometer (Optional)...................................................................... 22
6.5.4 Wiring Diagram Pressure Switch (Optional)...................................................................................... 22
6.5.5 Wiring Diagram Pressure Transmitter (Optional)............................................................................. 22
6.5.6 Wiring Diagram Pressure Switch of Water-oil Heat Exchanger (Optional).................................... 22
7 Commissioning..................................................................................................................................................... 23
7.1 Conveying Condensable Vapors........................................................................................................................ 23
8 Maintenance......................................................................................................................................................... 25
8.1 Maintenance Schedule ....................................................................................................................................... 26
8.2 Oil Level Inspection............................................................................................................................................. 27
8.3 Oil and Oil Filter Change .................................................................................................................................... 28
8.4 Exhaust Filter Change......................................................................................................................................... 30
8.5 Air Heat Exchanger Cleaning ............................................................................................................................. 31
9 Overhaul................................................................................................................................................................ 32
10 Decommissioning................................................................................................................................................. 33
10.1 Dismantling and Disposal .................................................................................................................................. 33