CabKing 8V1 User manual

INSTRUCTION MANUAL
CabKing-8V1

2
READ ALL INSTRUCTIONS FIRST
IMPORTANT SAFETY INSTRUCTIONS
For your own safety, be sure to read, understand and follow all warnings,
safety rules and instructions in this instruction manual and on the ma-
chine before use. Failure to do so can result in serious personal injury.
WARNING: This machine includes products that can expose you to
chemicals including nickel, which is known to the State of California to
cause cancer. For more information, go to www.P65Warnings.ca.gov.
This warning applies to the 80# and 220# diamond wheels, and the 360#
full face diamond lap.
SETUP SAFETY
KNOW YOUR POWER TOOL. Read this instruction manual carefully. Learn
the applications, limitations, specific warnings, and hazards related to this
machine.
KEEP GUARDS IN PLACE AND SECURED. Never operate this machine
without hoods. Make sure all guards are operating and properly secured
before each use.
INTENDED FOR INDOOR USE ONLY.
AVOID DANGEROUS ENVIRONMENTS. Do not use this machine near
gasoline or other flammable liquids.
MAKE SURE MACHINE IS SECURELY MOUNTED. Abide by the proper
mounting instructions before connecting the tool into a power supply.
USE ONLY RECOMMENDED ACCESSORIES. The use of improper
accessories on this machine may cause risk of injury.
CHECK FOR DAMAGED PARTS. Before use of this machine, always check for
any damaged guards or parts to determine that it will operate properly and
perform its intended function. Check for proper alignment of moving parts,
binding of moving parts, breakage of parts, mounting and any other
conditions that may affect its operation. A guard or other part that is
damaged must be properly replaced through the manufacturer of this
machine to avoid risk of injury.

3
USE ONLY IDENTICAL CABKING PARTS FOR REPLACEMENT PARTS. Use of
any other parts may create a hazard or cause product damage.
ELECTRICAL SAFETY
USE ONLY GROUNDED OUTLET OR GFCI OUTLET. All electrical cords must
either be securely grounded, connected to a surge protected outlet, or
preferably, connected to a GFCI (Ground Fault Circuit Interrupter) outlet. A
GFCI is highly recommended to prevent electric shock. Do NOT use an
extension cord.
DON’T ABUSE THE CORD. Never carry the machine by the cord or yank it to
disconnect from receptacle. Keep cord away from heat, oil and sharp edges.
USAGE SAFETY
NEVER DISCONNECT MOTOR, LAMP OR PUMP WITH WET HANDS. Though
the motor is sealed, you must make sure to keep all electrical connections
dry. Avoid touching the pump when connected to the power.
ALWAYS WEAR PROPER EYE PROTECTION. Enclosed are safety goggles to
protect you from any debris that may fly out while grinding. We recommend
wearing the enclosed goggles or safety glasses with side shields. Everyday
eyeglasses are NOT safety glasses. If anyone is around the machine while it
is in use, they must wear safety glasses.
WEAR PROPER APPAREL. Do not wear any loose clothing, gloves, neckties
or jewelry that can get caught in the machine’s moving parts. Long hair must
be secured with a rubber band or hair tie.
KEEP WORK AREA WELL LIT, CLEAN, AND UNCLUTTERED.
ADULT SUPERVISION IS REQUIRED AT ALL TIMES. Never leave the machine
running unattended.
DO NOT TOUCH MOTOR HOUSING. Avoid contact with the motor housing
when in use. The motor is totally enclosed and non-ventilated so it produces
high temperatures. The running temperature can reach around 220°F.
DO NOT OPERATE THIS MACHINE WHILE UNDER THE INFLUENCE OF
DRUGS, ALCOHOL OR ANY MEDICATION.

4
NEVER RUN WHEELS DRY. Make sure there is adequate water used while
grinding so that rock dust is not formed. This dust may contain chemicals
that can be hazardous to your lungs if inhaled and is known to cause
cancer, birth defects or other reproductive harm. To reduce your exposure to
these chemicals, work in a well ventilated area and wear a face or dust mask
if the grinding operation is dusty.
USE ONLY WATER AS COOLANT.
SOME ROCKS CONTAIN POISONOUS ELEMENTS. Avoid grinding rocks that
contain uranium, mercury, lead, arsenic, etc. Be certain you know the
material you are grinding.
DO NOT FORCE THE TOOL or attachment to do a job it is not designed to do.
DIRECTION OF FEED. Be aware of the wheel rotation direction. ALWAYS
EASE THE WORKPIECE AGAINST THE RESIN WHEELS. A harsh impact can
break the wheel. Use light pressure when starting to grind. Too much
pressure can cause the wheel to crack.
NEVER GRIND MORE THAN ONE WORKPIECE AT A TIME.
NEVER START THE MACHINE IF A WHEEL IS IN CONTACT WITH A WORK-
PIECE.
WHEELS CONTINUE TO SPIN AFTER TURN OFF eventually slowing to a stop.
AVOID AWKWARD OPERATIONS AND HAND POSITIONS. Make sure you
have good balance while working on this machine. A sudden slip could cause
your hand to move into the wheel.
ALWAYS STAY ALERT. You must be focused while working on this machine.
It is possible for stones to catch on the wheels and be ejected out of the
grinding area.
MAINTENANCE SAFETY
ALWAYS DISCONNECT POWER BEFORE SERVICING. Disconnect machine,
lamp and water pump from power before making adjustments and when not
in use.
DO NOT OPEN MOTOR. No user serviceable parts inside.
CLEAN AND DRY MACHINE AFTER USE.
SAVE THESE INSTRUCTIONS

5
TABLE OF CONTENTS
SAFETY INSTRUCTIONS……………………………………….……………..
PARTS LIST………………………………………………………………………..
ASSEMBLY INSTRUCTIONS…………………………………..…………….
SETTING UP THE WATER SYSTEM……………….…………………….
FINAL ASSEMBLY………...……………………………………………………….
MAINTENANCE……………..………………………………………………………
MACHINE USAGE…………….………………………………………………….
THE ART OF CABBING………………………………………………………….
WATER SYSTEM PARTS……………………………………………………….
OPTIONAL ACCESSORIES……..……….…………………………………..
TROUBLESHOOTING….………………………………………………………..
WARRANTY INFO………………………….……………………………………..
2
6
7
9
10
11
12
14
15
16
18
19

6
PARTS LIST
1
789
56
12
10
4
15
3
11
14
13
2
PART # DESCRIPTION QTY
1INSTRUCTIONS 1
2ABRASIVES BOOK 1
3APRON 1
4GOGGLES 1
5SHAFT WRENCH 1
6PAN SPLASH GUARD 4
7HAND REST 2
8STONE TRAY 2
9DRIP PAN TUBING 2
10 INNER SIDE PANEL 2
11 OUTER SIDE PANEL 2
12 WATER PUMP 1
13 WATER PUMP FOOTSWITCH 1
14 CANVAS POLISH PAD 1
15 DIAMOND PASTE 1
16 8″ DIAMOND LAP - 360# 1
17 LAMP 1
18 HOOD 2
19 MOTOR 1
20 WHEEL SPLASH GUARD 2
21 DRIP PAN 2
22 BASEBOARD 1
23 80# GRINDING WHEEL 1
24 220# GRINDING WHEEL 1
25 280# RESIN WHEEL 2
26 600# RESIN WHEEL 2
27 1200# RESIN WHEEL 2
28 3000# RESIN WHEEL 2
19
17
18
20
21
22
23 24 25 26 27 28
16
21
18
20

7
Left hood
Hand restHand rest
Right hood
ASSEMBLY INSTRUCTIONS
Stone tray Stone tray
Pan splash
guard
Pan splash
guard
Pan splash guards
FIG. A
1. Refer to FIG. A above for assembly instructions. Determine a suitable, well lit location
for your CabKing-8V1. You will need a sturdy table or workbench that has 4 feet
width X 2 feet depth of clear space. The CabKing-8V1 is a heavy machine that
weighs approximately 150lbs once assembled. We highly suggest assembling this
machine with two people.
2. There are three boxes that contain components of your machine; the motor box, the
baseboard, hood, pan, light, and accessory box, and the box that contains the wheels.
Do not throw away any packaging until you are completely set-up.
3. Open the box that contains the baseboard and accessories. Remove all loose foam
and accessories. Check to make sure all parts are present both on the machine and
in the accessory box according to the parts listed on the opposite page. If you nd
any missing or damaged parts, call us immediately at (630) 366-6129 or email us at
4. Place the baseboard on your predetermined location. Make sure the board lays at
on the surface. Leave a few inches of clearance behind the machine to allow for
power cords and water tubes.
Drip pan Drip pan

8
5. Remove the top nuts and washers located on the four bolts
sticking through the baseboard (FIG. B). Keep these aside, you
will need them for the motor. Remove the plastic protectant
from the baseboard.
6. Install the lamp onto the baseboard. To do this, open the lamp
box and take out the lamp, rubber seal and three Phillips
screws. Using the pre-drilled holes in the baseboard as a
template, secure the lamp with the three Phillips screws,
making sure the rubber seal is between the baseboard and the
lamp. The lamp’s power cord needs to be facing away from the
motor (FIG. C).
7. Remove the motor from its box by lifting the motor straight
upwards by its black housing. Do not lift the motor by its shafts.
The motor comes in its own crate for shipping purposes. There
is an included wrench inside the crate. Use this to remove the
nuts that secure the motor in the crate.
8. Once the motor is removed from the crate, place it onto the four
bolts found on the baseboard. Make sure to align the motor so
it is parallel to the board, then take the washer and nuts you
placed aside earlier and tighten them onto the bolts using the
same wrench used to take the motor off the board.
9. Wheel installation — Refer to FIG. D below for step 9. There are two arbors that are
included with your CabKing. The left arbor is located at the end of the left motor shaft.
The right arbor is located at the end of the right motor shaft. Unscrew and remove the
left and right arbors from the motor shafts using the included shaft wrench. Remove
the spacers that are included on the shafts. Install the wheels and spacers onto the
shafts according to FIG. D below. Once the wheels and spacers are properly installed,
replace and tighten the arbors onto the shafts using the shaft wrench.
FIG. B
FIG. C
Right arbor
3000#
1200600#
3-1/2″ spacer
3″ spacer
2-1/2″ spacer
2-1/2″ spacer
280#
220#80#
FIG. D
Left arbor

9
10. Place the two drip pans on the baseboard. The drip pans are not xed in place,
allowing you to move them as needed. Insert the left and right stainless steel hoods
into the grooves located inside the drip pans.
11. Place the clear stone trays on top of the hoods and insert the hand rests into the drip
pans. Secure the pan splash guards onto both sides of the drip pans. Adjust the
position of the pan splash guards according to the water splash.
12. Attach the stainless steel, inner side panels to the hoods. They
magnetically attach for easy installation. Install one side panel
on the left hood and the other on the right hood, closest to the
motor (FIG. E).
13. Optionally, attach the outer side panels to the hoods. Like the
inner side panels, they magnetically attach for easy installation.
Install one side panel on the left hood and the other on the right
hood, furthest from the motor (FIG. F). Simply move the black
side spray tube upwards to attach and remove the side panels.
These outer side panels help control the water splash, however
not installing them provides easier access to the diamond lap
and canvas pad.
The CabKing-8V1 water system is a single-pass system, meaning not re-circulating. DO
NOT SET-UP THE WATER SYSTEM AS A RE-CIRCULATING SYSTEM. Read further
about the CabKing water system on page 15 after set-up.
14. Slide the drip pan tubes into the drip pans. Secure the connection
with the spring clip (FIG. G). Tug on the tubes slightly to make
sure they are secured. Place the unconnected ends of the tubes
in a large, 5 gallon empty bucket (not included), drain hole, or
wherever you want the dirty water to drain out. You must have
the drip pan tubes pointing downward to allow gravity to drain
the water from the drip pans. If the tubes aren’t angled
downward, the drip pans will ll up with water.
15. MAKE SURE WATER PUMP IS NOT CONNECTED TO POWER
SUPPLY. Connect the water intake system by pushing the two
clear tubes installed in the hoods into the black T-junction,
located on the end of the clear tube connected to the water pump
(FIG. H). Remove the protective backing from the T-junction and
place the sticky, adhesive side to the baseboard, behind the
motor. Tug on these tubes slightly to make sure they are
secured. Place the water pump in a separate, large 5 gallon
bucket (not included) lled fully with clean water (FIG. I). The
length from the bucket to the unit should not be more than 6 feet.
FIG. G
FIG. I
FIG. H
FIG. E FIG. F
SETTING UP THE WATER SYSTEM

10
FIG. J
FINAL ASSEMBLY
16. Install the two clear wheel splash guards onto the hoods (FIG. J). Twist the water
control knobs located on the left and right hoods to the off position according to the
directions on the knobs (FIG. J). Twist the two side valves on the side spray tubes to
the off position. When the black arrow on the side valves are pointed to the left, they
are in the off position.
17. Connect both the motor and lamp power cords to a surge protected outlet, or
preferably a GFCI (Ground Fault Circuit Interrupter) outlet. While not required, a GFCI is
recommended to prevent electric shock and can be purchased at your local hardware
store. Though the motor is sealed, you must make sure to keep all electrical
connections dry.
18. Attach the water pump power cord to the footswitch cord. The footswitch turns the
water pump on and off. Connect the footswitch cord to a surge protected power outlet.
ALWAYS UNPLUG FOOTSWITCH FROM POWER SOURCE WHEN NOT IN USE. Avoid
touching the water pump when power is on. NEVER UNPLUG OR TOUCH POWER
CORDS WITH WET HANDS.
19. MAKE SURE THE WHEELS ARE NOT IN CONTACT WITH ANY PARTS BEFORE
TURNING ON THE MACHINE SO THAT THE WHEELS SPIN FREELY. You can now turn
on the machine. The wheels spin at 1800RPM. It is typical for the motor to produce a
winding sound when starting up and a mild humming sound during use.
20. Start the water drip by pressing on the footswitch. Turn the six water control knobs to
the on position. Our unique water system allows you to drip water on each wheel
individually. You can adjust the water ow rate to your preference with the water
control knobs. While in use, make sure there is enough water dripping so that the
wheels do not become dry. NEVER RUN WHEELS DRY. To use the side spray for the
canvas pad and diamond lap, turn to page 13.
21. You are now ready to use the CabKing-8V1. READ THE REST OF THIS INSTRUCTION
MANUAL, ESPECIALLY THE SAFETY INSTRUCTIONS, BEFORE USE TO AVOID RISK
OF INJURY.
Water control
knobs
Wheel splash
guard
Wheel splash
guard

11
MAINTENANCE
The CabKing-8V1 is designed as a maintenance-free unit. There are no belts, pulleys,
gears, or parts to actively maintain, however all parts should be cleaned manually and
periodically with soap and clean water. DO NOT PUT ANY PARTS IN THE DISHWASHER.
Changing the wheels — The wheels included with the CabKing-8V1 are 8″ diameter with
1″ arbor holes. The CabKing-8V1 only uses wheels with 1″ arbor holes. Color of wheel
hub may vary. Using the included shaft wrench, remove the arbors located at the end of
the motor shaft, slide off the wheels and replace with new ones. We highly recommend
lubricating the shaft with oil, lithium grease or WD-40 every time you change wheels.
This helps prevent the shaft from rusting and ease in future wheel removal. Should you
have diculty removing the wheels, we suggest securing the arbor with the shaft
wrench and manually spinning the wheel in the opposite direction. The opposing force
should loosen the wheel. When removing the last wheel, sometimes the arbor can get
stuck in the wheel hub. Simply spin the wheel towards you, which will remove both the
wheel and arbor, then tap out the arbor using a cylindrical object.
LED light bulb — The light bulb installed in the lamp is LED and will last a long time.
Should you need a replacement, you will need to purchase this LED light bulb directly
through us at cabking.com. The LED light bulb installed in the CabKing lamp is specially
designed for this machine and can’t be found elsewhere. Written and visual instructions
on how to change the LED light bulb will be provided with the replacement bulb.
LED bulb specications: Voltage: 90-240V. Output current: 300Ma. Brightness: 200-
300LM. Bulb style: G5.3 bi-pin base.

12
The CabKing-8V1 is congured with two electroplated diamond wheels, four resin
diamond wheels, one diamond disc and one canvas polishing pad. The direct drive
motor on the CabKing-8V1 eliminates belts and other exterior motor parts to maintain or
replace. The water system is unique and allows you to independently control the water
spray on the wheels. Always use adequate water while in use to avoid running the
wheels dry. If the wheels become covered with stone residue, increase the water ow.
We recommend wearing the included apron to keep you from getting wet while you
work.
Another advantage to our water system is that you can adjust the
spray direction on each wheel. This allows you to use wheels of
different widths. Do this by locating the y-split, which is located
under the hood. Adjust the two nozzles that are inserted into the y-
split by twisting to the left or right (FIG. K).
The CabKing-8V1 grinds and polishes all kinds of shapes and design of rock, glass,
synthetic material and metal. The most popular use is making cabochons. The general
process of making a cabochon on the CabKing-8V1 is described on pages 13 and 14.
For more methods and special techniques on how to cut cabochons, read the “How to
use Diamond Abrasives to cut Gemstones” book that is included with this instruction
manual.
MACHINE USAGE
80# 220# 280# 600# 1200# 3000#
PRE-POLISHING
COARSE GRINDING
FIG. K

13
Grinding — Start with the electroplated diamond wheels on the left shaft to complete the
grinding process. The grinding process shapes your cabochon and removes any surface
irregularities so that the stone can be smoothed and polished. Hold your stone free hand
or on a dop stick. Begin with the 80# electroplated diamond wheel. Completely grind the
surface of the stone using adequate water. If the stone is not ground thoroughly,
scratching will occur. Making sure that all scratches are removed is the most important
part of grinding a cabochon. Frequently dry your cabochon with a paper towel or clean
rag to reveal the remaining scratches while you work. Repeat this process for the 220#
electroplated diamond wheel.
Pre-polishing — Once you are done grinding and shaping your cabochon on the
electroplated diamond wheels, proceed to the resin wheel sequence. Resin wheels sand
and smooth away at spots, scratches and tiny bumps that are left behind from the
grinding wheels in your stone, resulting in a pre-polished cabochon.
Important notes: The supplied CabKing resin wheels are formulated to be used
exclusively together in sequence. To avoid scratching or uneven grinding/polishing, do
not mix and match other brands of resin wheels with the CabKing resin wheels. PLEASE
READ THE RESIN WHEEL NOTICES DOCUMENT THAT IS INCLUDED WITH THIS
INSTRUCTION MANUAL.
Polishing — To put the nal polish on your stone, attach the included canvas polishing
pad by screwing it into the right arbor, while the machine is turned off. Using the
included 14,000 mesh diamond paste syringe, apply a series of small dots, randomly
throughout the pad, starting from the center of the pad, moving to the outer edge of the
pad. Using your nger, smear the small dots into the canvas polishing pad. While
diamond paste puts a bright, shiny polish on most stones, there are other ways to polish
your stones such as using diamond powder or cerium oxide.
Now that the canvas polishing pad is charged with the
diamond paste, it is ready for use. Most diamond pastes
can be used without water however, you may use water
while your polishing if you nd that your work piece is
overheating. This typically happens with softer material.
To use with water, aim the black side spray tube to the
center of the disc. Always aim the side spray tube to the
center of the disc so that when the disc is spinning, the
water will spread evenly throughout the whole surface.
Adjust the water drip to your preference by moving the
side spray tube to the left or right. Adjust the spray
direction by moving the white nozzle that is inserted into
the side spray tube to the left or right (FIG. L). Important
note: Only use one mesh per canvas polishing pad. Do not
mix different mesh on the same canvas polishing pad or
scratching may occur. FIG. L

14
If you plan to insert your polished cabochon into a jewelry
nding, you will need to put a at on the backside of your
cabochon. Included with your machine is an 8″ diamond
lap to do this. The lap is diamond electroplated with 360#
and pre-bound to an acrylic backing plate with 1/2″ arbor
hole. Install the lap by removing the slotted bolt from the
left arbor with a screwdriver, turning clockwise. Place the
lap onto the lip of the arbor, then secure the lap by
replacing the slotted bolt, turning counter-clockwise.
Make sure the slotted bolt is tight and secure. You may
use other types of diamond laps, such as ones with metal
backing plates. The diamond lap must be used with
water. Just like the canvas polishing pad, aim the black
side spray tube to the center of the disc and adjust the
water drip to your preference by moving the side spray
tube and white nozzle to the left or right (FIG. M).
Important note: The canvas polishing pad is to be used
on the right shaft. The diamond lap is to be used on the
left shaft.
FIG. M
THE ART OF CABBING
The art of cabbing involves experimentation, since every stone is different. As you
progress, you may nd that different grits are necessary depending on your stone and
application. The enclosed “How to use Diamond Abrasives to Cut Gemstones” book will
help you with your understanding as well as searching the internet or joining local
lapidary clubs. As with all stone cutting and cab making, practice and experimentation
are the keys to success.
Transform
rocks ...
into gems!

15
One of the key features to the CabKing-8V1 is the single pass, contamination-free water
system. The water system will remain trouble-free as long as you use a fresh, clean
supply of water. Do this by using a separate intake water bucket from the drainage
bucket. A fresh supply of water will protect you from cross-contamination of grit which
can occur in re-circulating systems that use a bubbler or geyser. With fresh water, the
pump and intake tubes will stay clean and unobstructed so there will be enough water
pressure. The water pump is rated at 30watts, 605GPH, 8.2ftHmax. We recommend
using a minimum 5 gallon bucket for both the water pump and drainage. You will
typically go through an average of 1-2 gallons of water per hour, with the water control
knobs on a light to medium drip. Monitor the water level in the bucket to make sure the
water pump is always submerged in water. THE WATER PUMP SHOULD NOT BE RUN
DRY.
By design, all water system parts can be easily disassembled by pulling off or
unscrewing and cleaned with soapy water. For routine maintenance, keep the nozzles, y-
split and tubing clean with a small wire brush or the included pipe cleaner.
DO NOT SET-UP THE WATER SYSTEM AS A RE-CIRCULATING SYSTEM. THIS WILL
VOID YOUR WARRANTY. This means putting the drip pan tubes into the same bucket
of water as your water pump. Doing so will void your warranty and you also risk
cross-contamination of grit, which may result in scratches on your stone. The grit will
eventually build up in the water control valves, nozzles and tubing which will restrict
water ow and potentially clog the water system parts.
Underneath each hood are three y-splits with two nozzles in each, three needle valves
and clear tubing that connects to each needle valve. The clear tubing measures 1/4″
outer diameter X 1/8″ inner diameter. See image below to identify parts.
CABKING WATER SYSTEM PARTS
Clear tubing
Y-split
Nozzle
Needle valve

16
OPTIONAL ACCESSORIES
All CabKing-8V1 accessories can be purchased directly at cabking.com
8″ Trim Saw Attachment
This trim saw attachment allows you to cut, grind and
polish with just one machine. It ts onto either shaft of
the CabKing-8V1 and comes with one 8″ diameter
sintered saw blade, which allows you to work right out of
the box.
8″ Diamond Grinding Wheels
Our nickel electroplated diamond wheels are used for
rough grinding and pre-forming your material. Each wheel
comes with a plastic hub in a variety of different grits.
These are the 80# and 220# wheels that originally came
with your unit.
8″ Resin Wheels
Our resin wheels are used for ner grinding and forming,
cabbing and contour grinding. Each wheel has a medium
density foam backing with a plastic hub in a variety of
different grits. These are the 280#, 600#, 1200# and
3000# wheels that originally came with your unit.
8″ Diamond Laps
These diamond laps are used on the left shaft of the
CabKing-8V1 to perform both rough and ne grinding on
stones and glass. Each lap comes with a 1/2″ arbor hole
that is pre-bound to an acrylic backing plate. We have a
variety of different grits available. This is the 360#
diamond lap that originally came with your unit.

17
6″ Full Face Diamond Laps
These full face diamond laps are used on the right shaft
of the CabKing-8V1 to give you a at surface for grinding
and pre-forming your material. Each lap comes with a
1/4″-20 thread in a variety of different grits.
6″ Canvas Polishing Pad
This untreated canvas polishing pad is used for
polishing stones, glass and synthetic material on the
right shaft of the CabKing-8V1. Each pad comes with a
1/4″-20 thread and needs to be charged with diamond
paste or diamond powder before use.
Diamond Paste
Our diamond paste provides an excellent medium for
polishing stones, glass and synthetic material. The paste
is conveniently packaged in color-coded disposable
syringes for easy mesh identication. Charge the canvas
polishing pad with our diamond paste and receive
excellent results.
Wheel Spacers
These aluminum spacers are used in-between the
wheels on the CabKing-8V1. Get the spacing you desire
with extra spacers. 1/8″, 1/2″, 3/4″ and 1″ sizes are
available.
OPTIONAL ACCESSORIES

18
TROUBLESHOOTING
PROBLEM RECOMMENDED SOLUTION
PARTS ARE MISSING OR DAMAGED CONTACT US DIRECTLY BY CALLING (630) 366-6129 OR SEND US AN
EMAIL AT [email protected].
MOTOR IS HOT
THIS IS NORMAL. BY DESIGN, THE MOTOR IS TOTALLY ENCLOSED AND
NON-VENTILATED SO IT PRODUCES HIGH TEMPERATURES. THE
TEMPERATURE RANGE IS 190°F - 220°F. AVOID CONTACT WITH THE
HOUSING.
MOTOR MAKES A RATTLING SOUND
THIS NOISE CAN BE COMMON AND WILL EVENTUALLY WORK ITSELF
OUT WITH PROLONGED MACHINE USAGE. IT IS NOT A SERIOUS
PROBLEM UNLESS THERE IS A VIBRATION ASSOCIATED WITH IT.
MOTOR VIBRATES OR SHAKES
MAKE SURE THE WHEELS ARE PROPERLY BALANCED. THIS CAN BE
FIXED BY TAKING THE WHEELS OFF OF THE SHAFT AND REALIGNING
THEM. MAKE SURE THE SHAFTS ARE TIGHTENED.
WATER CONTROL KNOBS
KEEP SPINNING
TIGHTEN THE SET SCREW LOCATED INSIDE THE KNOBS USING A FLAT
HEAD SCREWDRIVER.
WHEELS DON'T TURN
MAKE SURE POWER IS CONNECTED AND MACHINE IS TURNED ON.
MAKE SURE THE WHEELS ARE NOT OBSTRUCTED. IF THE WHEELS ARE
CAUGHT ON SOMETHING BEFORE YOU TURN ON THE MOTOR, THERE
WILL NOT BE ENOUGH MOMENTUM TO START SPINNING.
WATER FLOW IS WEAK OR
DOESN’T FLOW AT ALL
MAKE SURE THERE IS ENOUGH WATER IN THE BUCKET WITH THE
WATER PUMP.
MAKE SURE THE WATER PUMP IS CONNECTED TO A POWER SUPPLY.
MAKE SURE ALL WATER TUBES ARE CONNECTED PROPERLY.
CLEAN NOZZLES AND Y-SPLITS WITH THE INCLUDED PIPE CLEANER.
DRIP PANS DO NOT DRAIN
SHAKE THE DRIP PAN TUBES TO START THE FLOW WHILE TILTING THE
DRIP PANS UPWARDS.
MAKE SURE THE DRIP PAN TUBES ARE ANGLED DOWNWARDS. TUBES
SHOULD ALSO BE CUT TO LENGTH AFTER SETTING UP THE UNIT.
CLEAN THE DRIP PAN OUTSPOUT.
NOZZLE / WATER SYSTEM PARTS
ARE LOOSE OR FALL OFF
WE SUGGEST USING TEFLON TAPE AND WRAPPING THE PORTION OF
THE NOZZLE THAT IS INSERTED INTO THE Y-SPLIT WITH ENOUGH TAPE
TO SECURE THE FIT.

19
ONE YEAR MANUFACTURER WARRANTY
This CabKing-8V1 is warranted by the manufacturer to be free from
defect for the period of one full year from the purchase date.
What does this warranty cover?
This warranty covers all mechanical and structural parts of the CabKing-8V1, such as
the motor, water pump, baseboard, etc.
What does this warranty not cover?
This warranty does not cover any consumable goods such as diamond abrasives,
light bulbs and/or polishing pastes. This warranty also does not cover any abuse,
misuse, intentional damage, incorrect usage, failure to take care of the machine,
improperly following the instructions, servicing by someone other than CabKing
personnel and/or theft/loss.
Who is covered under this warranty?
This warranty only covers the original purchaser of the equipment. It is non-
transferrable.
What is the warranty period?
The warranty is in force for one year from the date of purchase. Please retain the
original invoice of your machine for proof of warranty or register your CabKing-8V1.
Need our warranty service?
Contact us directly and we will assist you. You can either call us at (630) 366-6129 or
machine is determined to be under warranty, we will pay for return shipping. You
must PROVE that you are under warranty by providing us with the original invoice of
your machine or by registering your CabKing-8V1 to receive our warranty service.
Manufactured by: REENTEL International Inc., 808 Burr Oak Dr., Westmont, IL 60559 - USA
Protect your investment and extend this manufacturer’s warranty
another 1-2 years! For purchase and more details, visit cabking.com
or call (630) 366-6129.
Important note: You have up to 45 days from the purchase date of this
CabKing machine to add this extended warranty.

20
Manufactured Using Foreign & Domestic Parts By
Reentel International Inc.
808 Burr Oak Dr.
Westmont, IL 60559 - USA
CabKing Helpline
(630) 366-6129
Email
Website
cabking.com
facebook.com/TheCabKing
instagram.com/CabKing
youtube.com/CabKing
Table of contents
Popular Lathe manuals by other brands

Grizzly
Grizzly G4003G owner's manual

Clarke
Clarke WOODWORKER CWL1000CF Operating and maintenance instructions

Central Machinery
Central Machinery 95647 Assembly & operating instructions

Record Power
Record Power CL3-CAM Original instruction manual

Grizzly
Grizzly G0694 owner's manual

The Cool Tool
The Cool Tool PLAYMAKE manual