Can Industrial W40H21P Series User manual

SHELTER
ASSEMBLY MANUAL
Model#407021P
(W40H21P SERIES)
Size: W12.2mxH6.4m xL21.35m

SPECIFICATION
Width: 12.2m Height: 6.4m Length: 21.35m
Door dimension: W4xH4m
IMPORTANT----READ MANUAL FIRST
Improper site preparation, assembly and maintenance may invalidate warranty and cause unnecessary and costly
mistakes. If you have any questions contact your local dealer.
For User Friendly assembly we have identified each individual component with the part code as indicated in the
parts list. Please refer to the part code numbers and drawing to ensure problem free assembly.
It’s necessary to tighten the roof fabric enough to avoid “hammocks”on the roof and also re-tighten once or twice
again after a few months of use. This is important when assembly in cold weather (autumn and winter) because the
fabric is stiff then and when we got the sun and warm weather afterwards it will make the fabric "slack"again
and need to be re-tighten before next winter.
It’s the owners responsibility to take of snow immediately if not slide of by itself.
READ ALL INSTRUCTIONS BEFORE ASSEMBLY
1. Keep work area clean. Cluttered areas invite injuries. Do not set up near snow drifts, in slippery places, in high
winds, or wet location.
2. Keep children away. All children should be kept away from the work area. Be aware of personal safety. Be
careful not to pinch fingers with clips and tubes when assembling: when using makes sure there is adequate
ventilation for exhaust and other dangerous fumes.
3. Do not over reach. Keep proper footing and balance at all times.
4. Do not assemble if under the influence of alcohol or drugs. Read warning labels on prescription to determine if
your judgment or reflexes are impaired while taking drugs. IF there is any doubt, do not assemble.
5. Be aware of possible windy conditions; fasten the base in concrete if these situations may occur. Remove the
cover during hurricane.
6. Be careful with power and heat sources. Do not keep heat sources near the tarpaulin. Do not expose to open
flame.
7.Be aware of personal safety during assembly and use .Be careful not to pinch fingers with clips and tubes when
assembling when using makes sure there is adequate ventilation for exhaust and other dangerous fumes.

407021P Spare Parts List
Part
Description
QTY
1
Roof Bent Tube
6
set
1A
Roof Bent Tube for Front & Back Wall
2
set
2
Upper-Middle Connecting Truss
12
set
2A
Upper-Middle Connecting Truss for Front & Back Wall
4
set
3
Lower-Middle Connecting Truss
12
set
3A
Lower-Middle Connecting Truss for Front & Back Wall
4
set
4
Side Wall Bent Tube
16
set
5
Uprights
16
set
6
Purlins
63
pcs
6A
Supporting Tube for Side Wall Bent Tube
12
pcs
7
Base Plates for Uprights
12
pcs
7A
Base Plate for left corner
2
pcs
7B
Base Plate for right corner
2
pcs
7C
Rachet with screw
20
set
8
Middle Base Plate for the Front & Back Door
4
pcs
9
Side Base Plate fot the Front & Back Door
4
pcs
10L
Lower Door Track for Front & Back Door at left
2
pcs
10R
Lower Door Track for Front & Back Door at right
2
pcs
11L
Upper Door Track for Front & Back Door at left
2
pcs
11R
Upper Door Track for Front & Back Door at right
2
pcs
12
Beam for Two Doors
4
pcs
12A
Vertical Suspending Tube for Front & Back Door
2
pcs
12B
Steel Plate
8
pcs

13
Lower Upright for Front & Back Door at Left
2
pcs
13A
Lower Upright for Front & Back Door at Right
2
pcs
14
Upper Door Track for Front & Back Door
4
pcs
15
Horizontal Tube for Front & Back Wall
8
pcs
16
Tube for Assembly the Winch
2
pcs
17
Surpporting Steel Wire for Side Wall
14
pcs
18
Clips
88
pcs
19
Steel Wire for Roof Frame
16
pcs
19A
Vertical Steel Wire for Arches
6
set
20
Lower Tensioning Tube for Front & Back Wall
8
pcs
21
Stake pegs
80
pcs
22
Tensioning Tube
2
groups
23
13*30 Bolts for tubes and two doors
160
set
24
10*80 Carriage Bolts
80
set
24A
10*90 Bolts for two doors
52
set
24B
10*60 Screw
6
set
24C
8*70 Screw
16
set
25
Tube should be insert into the Door Cover
14
groups
26
Winch for Door
2
set
27
dia.32mm Plastic Plugs
20
pcs
28
Rope
1
bundle
29
Wrench
2
pcs
30
Belts
16
pcs
31
Pvc Tube
2
groups
32
10*30 Screw
4
set
33
Small Rachet with Belts
10
pcs
34
Roof Cover
1
pcs
35
Front & Back Cover
2
pcs

Figure 1:Sketch of trussed frame shelter
Size: W12.2mxH6.4mxL21.35m

EQUIPMENT AND TOOLS FOR INSTALLATION
1. Measuring Tape 2. String for alignment
3. Stake 4. Ladder or Scissors Lift
5. Sledge Hammer 6. Drill
7. Wrench 8.Knife
9. Hoist
INSTALLATION PROCESS
A----BASE INSTALLATION
Please refer to the diagram (Figure 2) to place the base plates:
Figure 2
1. The measurement is from center to center of tubes on the base palates. Referring to the above diagram and
confirm the place of base plates. There are four holes on the plates for stake pegs.
Foundation placement
As Figure 2 shows each Base plate is equipped with 4 pieces of Stake pegs with ratchets on.(No.21)
1. Mark the stake peg hold through the base plate by using the stake peg. Move the base plates away and the mark
determines where the stake peg will be.
2. Note: The stake peg apply for normal conditions, not suitable to the rock ground, frozen soil and concrete
ground.

B---FRAME INSTALLATION
Figure 4 Figure 5
1.Figure 4 shows to connect the Top roof tube(No.1A),Roof curing tube(No.2A),Roof curving tube at both doors
(No.3A) , Sidewall tube (No.4) and Standing leg(No.5) with Bolt M12x30mm(No.23), then put the arch into tube of
the Base flange by hoist, and assemble every group arch by turns(see Figure 5).
Figure 6 Figure 7
3. Connect Purlin(No.6) to arch by using Bolt M10x80mm (No.24) by turns(see Figure 7),then connect the Steel
wire(NO.17 and NO.19) on top and side by using Clip(No.18) (see Figure 7).

C--- INSTALLING FRONT AND BACK COVER
After Assembly the Arches, pls assembly the front and back wall as the picture above show.

Figure 8 Front and Back Cover
Figure 9 Front door
2.Insert the tubes(Part No.25) into front and back door through the pockets on covers, tidy the front door and back
door covers by using Rope(No.28), make the cover well fold to the frame and tension the cover.

D--- INSTALLING THE ROOF COVER
NOTE: Do not install the cover onto the frame of your building in high wind conditions.
Figure 10

Figure 11
1. As Figure 10 shows, when Roof cover is over top of Frame assembly (see Figure 10)
Figure 12
2. As Figure 12 shows, align one side of Roof cover evenly front to back, add band(No.30) for tie down ratchet at
each point alone the cover opening, Put band for tie down ratchets over cover tension tubes at each base plate
alone one side. Bands do not attach to tension tubes, but loop around and secure at both ends on ratchet.
3. The roof cover is tension ed frond front to back by the rope lacing to grommet flaps inside the main cover, inside
the unit at both front and rear arches. using the rope provided, lace the main cover grommet flap around the main
frame front and rear arch pieces. start in the top middle of each arch, and lace to each side. add rope length by tying
pieces together or cutting as necessary.
This manual suits for next models
1
Table of contents
Popular Industrial Equipment manuals by other brands

Sealey
Sealey AK459DX.V2 manual

Wilo
Wilo Wilo-EMU TR/TRE 50-2 Installation and operating instructions

Conductix-Wampfler
Conductix-Wampfler Hevi-Bar II manual

Meheen
Meheen MERLIN N Series operating manual

Siemens
Siemens SINUMERIK 840Di sl Programming manual

Stahl
Stahl PanSic 8003/1 Series operating instructions