
INST-PM-7000-50 Rev B 04/03/2018
7. Remove plenum lid and set aside.
8. Remove and discard old atomizers using (2) 8″crescent wrenches as shown below.
9. Install new atomizers.
10.Install plenum lid by turning (7) latches clockwise and fold up. Note: Turn each
latch counterclockwise to open before installing plenum lid.
11.Install plenum lid access panel by tilting panel and sliding under bezel.
12.Secure plenum lid access panel with retained (2) screws using Phillips screwdriver.
13.Install electrical access panel by sliding until (2) tabs on left side are engaged.
14.Secure electrical access panel with retained (5) screws using Phillips screwdriver.
15.Install refrigeration access panel by sliding until (2) tabs on right side are engaged.
16.Secure refrigeration access panel with retained (5) screws using Phillips
screwdriver.
17.Continue to instructions for replacing additional accessory preventative
maintenance items if applicable or plug in power cord and turn on chamber.
18.Reset air filter and atomizer alerts by pressing Settings button on right side of
Home screen as shown below.