
NA 03.28 D EN - 2
1. INTRODUCTION
This manual must be read before placing, installing or servicing the air handling unit.
Failure to follow the instructions in this manual could damage the air handling unit and will void its warranty.
CLIMACIAT air handling units are intended solely for the purpose of handling air. No other uses (storage, etc.) are allowed. They should
never be used for any other purpose (storage, support, etc.).
1.1 General safety instructions
The following must be performed before servicing the air handling unit:
- The power must be switched off (proximity switch)
- The fan must be stopped (WARNING: it may take several minutes to stop completely)
- Electrical equipment must be switched off (electric heater, humidifier, purifiers, etc.)
- Work must be carried out by an accredited technician.
- PPE (Personal Protective Equipment) must be used for all work.
2. DELIVERY AND HANDLING
2.1 Receiving and storing the unit
The condition of the unit must be inspected upon receiving it.
In case of damage, specify this in full on the delivery note, indicating the type of problem (upper panel dented, coil damaged, etc.).
Confirm your observations concerning the damage with the carrier by registered letter within 48 hours of delivery and send a copy to
your CIAT representative.
NB: terms such as "pending unwrapping" and "unit damaged but packaging in good condition" are not admissible by insurance
companies.
For all other problems, please contact your CIAT representative for further information.
The unit must be stored in its packing and sheltered from weather.
To facilitate the assembly of multisplit units, their components must be kept in the relevant groups. Refer to the dimensional drawings
and identification labels placed on each section (see below).
1: Order number. Use in all correspondence.
2: Section number
A1, A2, ….A9: multi-section unit.
A second unit may bear the markings B1, B2, ….B9.
The numbers 1, 2 and 3 do not necessarily indicate the order of
assembly (refer to the dimensional drawing).
A9, B9…: markings for all accessories: assembly, roofs, canopies,
gaskets, fastenings, etc. of the corresponding unit.
3: CIAT internal production order.
4: CIAT internal coding.
5: Your name or company.
6: Internal pre-shipping check.
7: Your reference (if applicable).
8: Weight of corresponding block.
9: Block year of manufacture.
10: Centre of gravity to facilitate
positioning of the lifting beam.
11: Manufacturer's name and address.
12: CE marking.
Machinery directive 2006/42/EC.
EMC directive 2004/108/EC
Pressure equipment directive 97/23/EC
2.2 Location
The air handling units are relatively large. Extra attention is required when choosing where to place them.
As is generally the case with boilers and refrigeration units, we recommend installing the air handling units in machine rooms that are
sufficiently insulated from adjoining rooms.
5
4
3
1
7
8
10
11
12
9
6
2