Commercial Electric 5516-VN User manual

□ □
1
Flush Mount Installation
2
PLACING THE ENCLOSURE
Place the Telecommunications Center (A) in the install
location. For the flush mount install you will not need
Surface Mounting Brackets (B) or Surface Mounting
Bracket Screws (C). It is normal for the enclosure to flex so
that it can fit between the studs.
Installation Guide
15 inch Telecommunication Center
Item # 1005485166
Model #5516-VN
PACKAGE CONTENTS
MARKING THE SCREW LOCATIONS
Make sure the Telecommunication Center is level and
mark the two screw locations on the studs using a pen or
pencil.
CAUTION: When using tools always follow the
manufacturer’s safety guidelines.
Please read all instructions and safety information before use.
Retain this manual for future reference.
Safety Information
□
3 INSTALLING THE ENCLOSURE
Secure the two tabs to the studs using the included Metal
Wood Screws (F) and a Phillips Head Screwdriver.
□
4 INSTALLING THE SCREW COVER
Once you have run wires and loaded the enclosure, you can install
the cardboard dust guard (G) by slipping the cardboard edges
straight back into the enclosure. Install the drywall over the
location. After sanding and painting the drywall, you can remove
the cardboard dust guard. Complete installation by securing the
cover (E) to the enclosure using the included Cover Screws (D) and
a Phillips Head Screwdriver.
The back of the enclosure is covered with UL Rated Fire Safety Tape
to comply with safety standards. To install modules and components,
simply push them through the UL Rated Fire Safety Tape.
TOOLS NEEDED
Phillips Head Screwdriver
Utility Knife
Pencil/Pen
RoHS Compliant
Rev. 01/06/2023
Level
A
D- (4) Screw Cover Screws
E- (1) Plastic Screw Cover
F- (4) Metal Wood Screws
G- (1) Cardboard Dust Cover
F
D
5015295
ETL LISTED
CONFORMS TO
UL STANDARD 2416
CERTIFIED TO
CSA STD C22.2 NO
60950-1
NOTE: this enclosure is a distribution panel for low voltage
wiring systems. It is not designed to be used as an AC power
distribution panel. Use only Class 2 powered or passive
devices.
Never install low voltage wiring during lightning storms.
Never install low voltage wiring in wet locations unless the
wire is specifically designed for wet locations
On-wall maximum load rating: 10kg (22lbs)
A- 15 in. Telecommunication Center
B- (4) Surface Mounting Brackets
C- (4) Surface Mounting Bracket Screws
E
with UL Rated Fire Safety Tape

□ □
1
Surface Mount Installation
2PLACING THE ENCLOSURE
Installation Guide
Item # 1005485166
Model #5516-VN
PACKAGE CONTENTS
MARKING THE SCREW LOCATIONS
Make sure the Telecommunication Center is level
and mark the four screw locations on the mounting
surface using a pen or pencil.
CAUTION: When using tools always follow the
manufacturer’s safety guidelines.
Safety Information
□
3 INSTALLING THE ENCLOSURE 4 INSTALLING THE SCREW COVER
TOOLS NEEDED
Phillips Head Screwdriver
Utility Knife
Pencil/Pen
RoHS Compliant
Rev. 01/06/2023
NOTE: this enclosure is a distribution panel for low voltage
wiring systems. It is not designed to be used as an AC
power distribution panel. Use only Class 2 powered or
passive devices.
Never install low voltage wiring during lightning storms.
Never install low voltage wiring in wet locations unless the
wire is specifically designed for wet locations
On-wall maximum load rating: 10kg (22lbs)
Please read all instructions and safety information before use.
Retain this manual for future reference.
F
B
C
A
5015295
ETL LISTED
CONFORMS TO
UL STANDARD 2416
CERTIFIED TO
CSA STD C22.2 NO
60950-1
Level
15 inch Telecommunication Center
Secure the Telecommunications Center using the
four included Metal Wood Screws (F) and a Phillips
Head Screwdriver.
D- (4) Screw Cover Screws
E- (1) Plastic Screw Cover
F- (4) Metal Wood Screws
G- (1) Cardboard Dust Cover
A- 15 in. Telecommunication Center
B- (4) Surface Mounting Brackets
C- (4) Surface Mounting Bracket Screws
with UL Rated Fire Safety Tape
Attach the four Surface Mount Brackets (B) with the
four supplied Surface Mount Bracket Screws (C) to the
pre-drilled holes on the upper and lower sides of the
enclosure. Place the Telecommunication Center (A) in
the install location.
□Once you have run wires and loaded the enclosure, you can install
the cardboard dust guard (G) by slipping the cardboard edges
straight back into the enclosure. Install the drywall over the
location. After sanding and painting the drywall, you can remove
the cardboard dust guard. Complete installation by securing the
cover (E) to the Surface Mounting Brackets (B) using the included
Screw Cover Screws (D) and a Phillips Head Screwdriver.
The back of the enclosure is covered with UL Rated Fire Safety Tape to
comply with safety standards. To install modules and components,
simply push them through the UL Rated Fire Safety Tape.
D
E
This manual suits for next models
1