RECORD OF REVISIONS
PS-28 Cruiser
SportCruiser
Date of issue: 2015-05-24 Revision No.: 13
0 - 3
Rev.
No. Revision name Changed pages Issue date Date and
signature
4
supplementation of GTN post
installation checkout log 17-1, 17-2, 17-6 to
17-10 2012-12-10
EASA Minor
Change
Approval
10043463
30. 1. 2013
5
Supplementation of stall warning
system description and
maintenance practices
i to iv, 0-3 to 0-5, 0-7,
0-8, 12-1, 12-2, 12-9,
12-20, 12-21, 12-53 2013-02-04
EASA Major
Change
Approval
10043557
6. 2. 2013
6
Supplementation of efficient
heating system and carbon
monoxide detector installation.
i to iv, 0-3, 0-5, 0-8, 0-
9, 13-1 to 13-10 2013-03-11
EASA Minor
Change
Approval
10045960
31. 7. 2013
7 Check of nose landing gear leg
for cracks i to iv, 0-3, 0-5, 0-6,
2-7, 2-11, 8-1, 8-17 to
8-26 2013-10-09 2013-10-09
Konečný
8
Supplementation of Sensenich
3B0R5R68C propeller
installation on PS-28 airplanes
i to iv, 0-3, 0-5, 0-7,
10-2, 10-3, 10-8,
10-11, 10-24, 10-43 2014-01-30
EASA Major
Change
Approval
10047966
31. 1. 2014
9
Correction of cross reference,
supplementation of improved
nose landing gear and
modification of relevant
maintenance practices
i to iv, 0-3, 0-5, 0-6,
2-5, 2-7, 2-11, 2-12,
8-4, 8-5, 8-19 2014-02-17
EASA Minor
Change
Approval
10048185
18. 2. 2014
10
Supplementation of balance
ballast description and
installation.
i to iv, 0-3, 0-5, 3-1,
3-5, 3-10, 3-11 2014-08-22
EASA Minor
Change
Approval
10050318
27. 8. 2014
11
Revision of SkyView system,
supplementation of SkyView
system adjustment, extension of
nose landing gear leg check for
cracks, supplementation of ELT
Kannad 406, supplementation of
XPDR control unit TC20.
i to iv, 0-3, 0-5 to 0-8,
2-2, 7-1, 7-3, 7-4, 7-10
to 12, 8-1, 8-18, 8-19,
8-20, 12-2, 12-8 to 10,
12-12, 12-17, 12-18,
12-38 to 44, 12-46 to
49, 12-54 to 62
2014-10-29
EASA Major
Change
Approval
10051301
21. 11. 2014
12
Increasing of the airframe
service life, improvement of 100
h / annual inspection in fuselage
and wing area
i to iv, 0-3, 0-5, 2-2,
2-8, 2-9 2014-11-24
EASA Major
Change
Approval
10051602
11. 12. 2014
13
The inspection interval of NLG
leg Dwg. No. SG0270N has
been changed from the original
50 flight hours to 25 flight hours
or 50 cycles whatever occurs
first.
i to iv, 0-3, 0-5, 2-1,
2-3, 2-4, 2-7, 2-8,
2-20
2015-05-24
EASA Major
Change
Approval
10053460
29. 05. 2015