
Table of contents
Installer reference guide
3
EWSAH/X06D
Daikin Altherma 3 WS
4P675764-1 – 2022.04
7.3.3 To install the indoor unit ................................................................................................................................ 68
7.3.4 To connect the drain hose to the drain ......................................................................................................... 69
8 Piping installation 70
8.1 Preparing piping.............................................................................................................................................................. 70
8.1.1 Circuit requirements....................................................................................................................................... 70
8.1.2 Formula to calculate the expansion vessel pre-pressure.............................................................................. 73
8.1.3 To check the water volume and flow rate of the space heating circuit and the central water loop circuit 74
8.1.4 Changing the pre-pressure of the expansion vessel...................................................................................... 75
8.2 Connecting the central water loop piping...................................................................................................................... 75
8.2.1 About connecting the central water loop piping........................................................................................... 75
8.2.2 Precautions when connecting the central water loop piping ....................................................................... 75
8.2.3 To connect the central water loop piping...................................................................................................... 76
8.2.4 To fill the central water loop circuit............................................................................................................... 77
8.2.5 To insulate the central water loop piping...................................................................................................... 77
8.3 Connecting water piping................................................................................................................................................. 77
8.3.1 About connecting the water piping ............................................................................................................... 77
8.3.2 Precautions when connecting the water piping............................................................................................ 78
8.3.3 To connect the water piping .......................................................................................................................... 78
8.3.4 To connect the recirculation piping ............................................................................................................... 79
8.3.5 To fill the space heating circuit ...................................................................................................................... 79
8.3.6 To fill the domestic hot water tank................................................................................................................ 80
8.3.7 To check for water leaks................................................................................................................................. 80
8.3.8 To insulate the water piping .......................................................................................................................... 80
9 Electrical installation 81
9.1 About connecting the electrical wiring .......................................................................................................................... 81
9.1.1 Precautions when connecting the electrical wiring....................................................................................... 81
9.1.2 Guidelines when connecting the electrical wiring......................................................................................... 82
9.1.3 About electrical compliance........................................................................................................................... 83
9.1.4 Safety device requirements ........................................................................................................................... 84
9.2 Overview of electrical connections for external and internal actuators ....................................................................... 84
9.2.1 To connect the main power supply................................................................................................................ 86
9.2.2 To connect the remote outdoor sensor......................................................................................................... 92
9.2.3 To connect the shut-off valve ........................................................................................................................ 93
9.2.4 To connect the electricity meters .................................................................................................................. 94
9.2.5 To connect the domestic hot water pump .................................................................................................... 95
9.2.6 To connect the alarm output ......................................................................................................................... 96
9.2.7 To connect the space cooling/heating ON/OFF output................................................................................. 97
9.2.8 To connect the changeover to external heat source..................................................................................... 99
9.2.9 To connect the power consumption digital inputs........................................................................................ 100
9.2.10 To connect the safety thermostat (normally closed contact) ....................................................................... 101
9.2.11 To connect the brine low pressure switch..................................................................................................... 102
9.2.12 To connect the thermostat for passive cooling ............................................................................................. 104
10 LAN adapter 105
10.1 About the LAN adapter................................................................................................................................................... 105
10.1.1 System layout ................................................................................................................................................. 106
10.1.2 System requirements ..................................................................................................................................... 108
10.1.3 On-site installation requirements .................................................................................................................. 108
10.2 Connecting the electrical wiring..................................................................................................................................... 109
10.2.1 Overview of electrical connections ................................................................................................................ 109
10.2.2 Router ............................................................................................................................................................. 111
10.2.3 Electricity meter ............................................................................................................................................. 112
10.2.4 Solar inverter/energy management system .................................................................................................. 114
10.3 Starting up the system.................................................................................................................................................... 117
10.4 Configuration – LAN adapter.......................................................................................................................................... 117
10.4.1 Overview: Configuration ................................................................................................................................ 117
10.4.2 Configuring the adapter for app control........................................................................................................ 118
10.4.3 Configuring the adapter for the Smart Grid application ............................................................................... 118
10.4.4 Updating software .......................................................................................................................................... 118
10.4.5 Configuration web interface .......................................................................................................................... 119
10.4.6 System information ........................................................................................................................................ 120
10.4.7 Factory reset................................................................................................................................................... 121
10.4.8 Network settings ............................................................................................................................................ 122
10.5 Smart Grid application.................................................................................................................................................... 124
10.5.1 Smart Grid settings ......................................................................................................................................... 126
10.5.2 Operation modes............................................................................................................................................ 128
10.5.3 System requirements ..................................................................................................................................... 129
10.6 Troubleshooting – LAN adapter...................................................................................................................................... 130