
EN
4
BIOCLASS iC 150
CONTENTS
1 LIST OF COMPONENTS ............................................................................................................... 6
2 INSTALLATION INSTRUCTIONS .................................................................................................. 9
2.1 LOCATION .............................................................................................................................................. 9
2.2 HYDRAULIC INSTALLATION ........................................................................................................................ 10
2.3 FUEL .................................................................................................................................................. 10
3 MOUNTING THE BOILER .......................................................................................................... 11
3.1 MOUNTING THE BURNER .......................................................................................................................... 11
3.2 MOUNTING THE RESERVE TANK AND SUCTION SYSTEM ...................................................................................... 13
3.3 MOUNTING THE ASH DRAWER .................................................................................................................... 18
3.4 ELECTRICAL CONNECTION ........................................................................................................................ 18
3.5 COMBUSTION PRODUCT REMOVAL ............................................................................................................... 19
4 STARTING UP THE BOILER ....................................................................................................... 20
4.1 PRIOR WARNINGS .................................................................................................................................. 20
4.2 ELECTRICAL CONNECTION ......................................................................................................................... 20
4.3 FILLING THE INSTALLATION ....................................................................................................................... 20
4.4 INITIAL CALIBRATION OF THE FUEL FEEDER .................................................................................................... 20
4.5 START-UP ............................................................................................................................................ 21
4.6 INSTALLATION HAND-OVER ....................................................................................................................... 21
5 DIGITAL DISPLAY: ................................................................................................................... 22
6 OPERATION ............................................................................................................................. 24
6.1 SELECTING THE BUFFER TANK OR WATER SETPOINT TEMPERATURE. ...................................................................... 24
7 OPERATION WITH BUFFER TANK .............................................................................................. 25
7.1 OPERATION WITH ONE TEMPERATURE PROBE ................................................................................................. 25
7.2 OPERATION WITH TWO TEMPERATURE PROBES ............................................................................................... 26
7.3 OPERATION WITH THREE OR FOUR TEMPERATURE PROBES.................................................................................. 26
7.4 WINTER/SUMMER MODE .......................................................................................................................... 27
8 OPERATION WITH HYDRAULIC NEEDLE .................................................................................... 28
9 USER MENU ............................................................................................................................. 29
9.1 ASH DEPOSIT STATUS .............................................................................................................................. 3 0
10 SETTINGS MENU .................................................................................................................... 31
10.1 PROGRAMMING PROCESS ........................................................................................................................ 32
10.2 TIMER PROGRAMMING OF THE BOILER ........................................................................................................ 32
10.3 ADJUSTING THE TIME ............................................................................................................................ 33
10.4 EMPTY ASH BOX NOTICE ......................................................................................................................... 33
10.5 MANUAL ADJUSTMENT OF THE CALIBRATION ................................................................................................. 34
10.6 ADJUSTING THE CONTRAST OF THE DISPLAY ................................................................................................. 34
11 CALIBRATION MENU .............................................................................................................. 35
11.1 DRAINING THE FEEDER .......................................................................................................................... 36
11.2 CALIBRATION OF THE FEEDER .................................................................................................................. 37
11.3 MANUAL ADJUSTMENT OF THE FEED AUGER CALIBRATION ................................................................................. 38
11.4 MANUAL ASH CLEANING ......................................................................................................................... 38
11.5 MANUAL OPERATION OF THE CIRCULATION PUMP ........................................................................................... 38
11.6 CALIBRATION OF THE LAMBDA PROBE ......................................................................................................... 38
12 TECHNICAL MENU .................................................................................................................. 39
13 CONFIGURING THE BOILER .................................................................................................... 4 3
13.1 BOILER MODEL (P.01) .......................................................................................................................... 43
13.2 SET THE BOILER POWER (P.02, P.03) ....................................................................................................... 43
13.3 GENERAL FAN FACTOR (P.04) .................................................................................................................. 43
13.4 FUEL FOR IGNITION (P.05) ..................................................................................................................... 43
13.5 FUEL (P.06) ....................................................................................................................................... 43
13.6 AUXILIARY PARAMETER FOR CLEANING INTERVAL SETTING OF THE BURNER (P.26) .................................................. 43
13.7 TEMPERATURE MAINTENANCE OF THE BOILER (P.13, P.14) ............................................................................. 44
13.8 SELECTION OF THE OXYGEN CONCENTRATION (P.36) ..................................................................................... 44
14 HYDRAULIC CIRCUIT ADJUSTMENTS ...................................................................................... 45
14.1 POST-CIRCULATION OF THE BUFFER TANK OR NEEDLE FEED PUMP (P.42) ............................................................. 45
14.2 MINIMUM FILLING PRESSURE OF THE INSTALLATION (P.19) .............................................................................. 45