
8Eastwood Technical Assistance: 800.343.9353 >> tech@eastwood.com
FIG. 12FIG. 12
FIG. 13FIG. 13
WALL MOUNTING WITH AN OPTIONAL
EASTWOOD #55255 WALL MOUNT BRACKET
Select a wall or other vertical location that provides a
stable and secure mounting for the Reservoir, keeping
it level at all times.
• Unlatch and remove the TIG Water Cooler
Reservoir Lid Assembly.
• Loosen and remove the three sets of Screws,
Nylon Flat Washers, Lock Washers and Nuts
from the Lid Assembly and set them aside
(FIG 12).
• Install the three Screws through the top face
of the optional Eastwood #55255 Wall Mount
Bracket, (FIG 13).
• Add the Nylon Flat Washers and place the
Bracket on top of the Lid with the Screws
through the holes, add the Lock
Washers and Nuts and tighten (FIG 14).
• With a Wall Mount Bracket assembled to the
Lid and the Lid replaced on the Reservoir it will
appear as in FIG 15.
• For best performance and safety, the Reservoir
must be mounted in a level position on a wall,
cabinet, tool chest, workbench etc, capable of
holding 20lbs. [9kg.] plus pulling stresses from
usage. Attachment to a structural member is
highly recommended.
SHOCK HAZARD!
Keep the Reservoir as far from the
Welder as feasible. DO NOT allow
any water or coolant to splash or
spill on or into the Welder.
Check for possible interference
with electrical lines, other utilities
or unseen obstructions before
drilling or driving screws into a
surface for mounting.
FIG. 14FIG. 14
FIG. 15FIG. 15