B
C
D
E
F
4. Operating instructions
Go to Index
•In both operation and maintenance sections ,
follow the indications mentioned in section
1. Security warnings.
•The equipment should be started once the
bromine level in the pool is between 1 and 3 ppm.
When using Emaux UV Nanotech Ozone these
levels can be reduced between 0.25 to1ppm.
•To open and load the equipment, follow the
instructions in section 5.Maintenance.
•Check that there are no leaks in the installation
before starting it up.
•To adjust the dosage level, adjust the valve (C)
located upon the equipment inlet (E).
•The adjustment of the dose varies according to
the conditions of use: water temperature, number
of bathers, solar radiation, among other factors.
A