
Deutsch
English
Français
Italiano
0.1 Language 00:00
Date
Time
0.2 Date setting
01.01.2000
00:02
Next
00:02
60°C
45°C
System 1/3 09:04
Test outputs
HE output
0.7 Checklist
Solar pump PWM
Next
09:07
You have completed
commissioning!
0.9 End
Next
09:08
60°C
45°C
System 1 09:10
• Switch on power supply.
• Commissioning starts after
a brief booting sequence.
• In this context, the controller queries
all of the necessary information.
• Language, time and date, high-effi ciency
pumps and the hydraulic system are set
in succession.
• Easy operation of the controller by means of
rotary encoder / OK button and esc button.
Differential temperature controller for solar thermal
plants for drinking water heating and heating support
Quick Start Guide
2
• T max and T limit are maximum temperature values
which trigger the deactivation of the solar circuit pump.
• T max defi nes the regular maximum temperature of the storage; however
if the collectors are at risk of overheating, the temperature rises to T limit.
• The default temperature at delivery is
set to T max = 59°C and T limit = 60°C.
• These values can be adjusted in 1.2.3 and 1.2.5 of the professional mode.
• As soon as the commissioning is completed,
the automatic mode is enabled.
• The display shows the hydraulic system, the
sensors with current values as well as the
operating mode of the pumps and valves.
• Modifi cations and adjustments to the setting
are described in the operating manual.
3
emz-Hanauer GmbH & Co.KGaA • Siemensstraße 1 • D - 92507 Nabburg
Telephone + 49 - (0) 94 33 - 89 8 - 0 • Telefax - 188 • info@emz-hanauer.com