
Installaon manual for wall mounng for flat screen. EPS20EW
Note: It is recommended that this product be installed only by a professional. We do no accept
responsibility for damages caused by improper installaon, assembly or use of this equipment. In
case of any doubt, please contact a professional to help you.
IMPORTANT.
•For safety reasons, the wall or mounng surface must be able to support the combined
weight of the mounng and the screen; otherwise the structure must be reinforced.
Appropriate safety equipment and tool must be used. Failure to do so may result in •
property damage or serious injury.
Make sure electrical wires, water pipes or gas pipes are not located between the wall. •
Tools required for installaon
•Screwdriver cross head.
•Electric or portable drill.
•1/5”(5mm) drill bit + post detector (plaster wall installaon)
•2/5”(10mm) concrete drill bit (concrete installaon)
Make sure all installaon accessories are included with the assembly. You can find the following:
Wall Installaon
(A) M6x50 Delay Bolt
(D) M4x12 Bolt
(G) Adjustable spanner
(B) Anchor
(E) M6x12 Bolt
(C) Washer M6
(F) M8x12 Bolt
Plaster Wall Concrete Wall
Pole
Pole detector Measuring Tape Measuring Tape
Use a pencil to mark the holes Use a pencil to mark the holes
Insert a concrete hole in each hole