manuals.online logo
Brands
  1. Home
  2. •
  3. Brands
  4. •
  5. Evergreen
  6. •
  7. Greenhouse Kit
  8. •
  9. Evergreen ZA720 User manual

Evergreen ZA720 User manual

Greenhouse
Assembly Instructions
ZA720
Size: 720Lx508Wx330Hcm 36.6m²
IMPORTANT
You must read these instructions carefully before you start to assemble this greenhouse.Please
ensure that you find all parts in the carton box in the correct type and quantity as mentioned in the
list illustrated in every page accordingly.
Please carry out the steps in the order set out in these instructions.
Do not tighten the steps in the greenhouse until completing on the assembly of the poly carbon
ate panels.
Keep these instructions in a safe place for future reference.
24x17ft
!
SAFETY ADVICE
We strongly recommend the use of work gloves during assembly.
Do not attempt to assemble the greenhouse in windy or wet conditions,
Do not touch overhead power cables with the aluminum profiles.
Always wear shoes and safety goggles when working with extruded aluminum.
Dispose of all plastic bags safety-keep them out of reach of small children.
The greenhouse must be positioned and fixed on a flat level surface.
Do not lean against or push the greenhouse during construction.
Keep children away from the assemble area.
Do not position your greenhouse in an area exposed to excessive wind.
Do not attempt to assemble this greenhouse if you are tired ,have taken drugs or alcohol
or if you are prone to dizzy spells.
If using a step ladder or power tools ensure that you follow the manufactures safety advice.
Hot items such as recently used grills, blowtorches etc.must not be stores in the greenhouse.
Ensure there are no hidden pipes or cables in the ground before inserting the pegs.
GENERAL ADVICE
This is a multi-part assembly, Allow at least 500-800 minutes for assembly.
Selecting a site-choose a sunny level position away from overhanging trees.
If you are fixing your greenhouse directly to a solid concrete foundation use the pre drilled
holes in the metal base supplied.
The component parts should be checked and laid out close at hand.
Keep all small parts(screws etc)in a bowl so they do not get lost.
Note that the door is hinged on the right hand side and therefore opens tothe right.
Keep roof clear of snow and leaves.
CARE & MAINTENANCE
When your greenhouse needs cleaning, use a mild detergent solution and risen with cols
clean water.
Do NOT use acetone, abrasive cleaners or other special detergents to clean the clear panels.
TOOLS & EQUIPMENT REQUIRED
Protective Equipment:
1.Helmet
2.Glove
3.Long Sleeve Cotton Overalls
4.Emergency Medicine Cabinet
5.Eye Shield
Measure (metric):
1.The Tape (5 m)
2.Angle Square
3.Level Meter
Installation Tool:
1. Triangle Stairs≈1.5m Height x2
2. Spanner 10mm (Ratchet Wrench is better)
3. Electric screwdriver+10mm hex bolt sleeve(suggest)
4. Wooden Mallet
5. Marking Pen
6. Silicon
7. Knife
8. Phillips screwdriver
-2-
Silicon
Silicon
!
OTHER CAUTIONS
1. 3-4 people required, one is for measuring & taking
marks to ensure the installation dimension ,the second
person is responsible for the installation and the last
one do as assistant and assure the safety.
2. High-power electric tools are required, ensure the
normal work of them and highly pay\attention to electric
safety.
3. Be careful when using the kind of blunt tools, like
hammer.
4. Wearing long sleeve cotton overalls,gloves and
helmet
during installation and wea safety glasses when using
power tools.
5.No up watching when working height, or the drop
screws may hurt your eyes and suffocation causing
accide
ntally when fall into your mouth.
6. No climbing, No standing on the tent to avoid falling
down.
7. If injuries immediately, using the first-aid kit to stop
bleeding,bind up, In case of emergency,taken
immediately to a nearby medical institutions.
PRODUCT SIZE
Firstly, make sure a good installation location.
Find a flat ground which is 2 times bigger than the Green house before installation.
-3-
330cm
720cm
508cm
183cm
192cm
196cm
-4-
Installation instructions and illustrations
1.Make sure the ground flat and firm before installing, avoid the ground subsidence and cause the
greenhouse to tilt.
2. If you need to permanently install without moving, please use solid bricks and concrete to make the
building foundation, make the house stronger.
3. Additional ground anchors or expansion screws required for different floors are required to be purchased
by the user, and this product is not provided.
≥5cm
Earth
Concrete
Brick Well
50cm
6cm
763cm
551cm
48
309
48
309
48
48 203 48 203 48
48 100 48 158 48 48100
Unit:cm
Ratio: 1:80
24cm
1.Before installation, you need to know the meaning of the following symbols.
2.Follow the pattern to install faster and less effort.
Use of Wells(Pouring concrete after inserting
ground anchor)
After the construction of the Civil Foundation,
it needs to be dry for 3-5 days. Then the
greenhouse components can be placed on
the Civil Foundation.
24
24
12
24
12
24
950cm
Silicon
Ø3mm
F6 Screw Installation Method
1. Install 8mm Sleeve
2. Start the first layer clockwise
3. Rotate counterclockwise for 3 seconds.
4. Fight clockwise to the end
5. Not too tight to ensure that the profile can
not be deformed.
L=L
Loose
looser tight tighter
Screw tightening State
Installation process Perspective It need to be punched.
Parallel on
both sides Upright Vertical
Reserved screws
Components, preloaded
井
-5-
ZA720 PARTS LIST (4-1)
Front wall and back wall
NO. Qty.
D1A 2
D1B 1
D4 1
1900
1900
814
814
40
60
1950
2064
2064
1552
2834
2128
1432
1500
2783
ZA-D2 4
ZA-D3 4
D5 12
D6 6
D7L 1
D7R 1
ZA-D8 1
ZA-D9 1
A10 4
ZA-A1 1
ZA-A2 2
ZA-A3 1
A4 4
ZA-A5 4
Front wall and back wall
NO. Qty.
A6L
A6R
A7L
A7R
A8L
A8R
A9L
A9R
2
2
2
2
1
1
1
1
Down Up
Up
Down
LR
1915
2323
2730
1019
A4B
ZA-A5B
A7B
8
8
2
A6LB
A6RB
A7LB
A7RB
A8LB
A8RB
A9LB
A9RB
A10L
A10R
1
2
2
1
1
1
1
1
1
1
A4C
ZA-A5C
A6C
A7C
A8C
A9C
8
8
4
4
2
2
Up
Down
LR
1500
2783
1692
1907
2315
2722
1011
620
1002
2713
2306
1898
2783
1500
-6-
ZA720 PARTS LIST (4-2)
Front wall and back wall
NO. Qty. NO. Qty.
ZA-B1
ZA-B2
2
2
2537
1507
ZA-C11 1Up
Down
2152
2491
2138
1432
LC1
LC2
LC3
2
2
2
NO. Qty. NO. Qty.
NO. Qty.
B7 8
B8 8
B9 4
C2 1
C3 8
C4 4
C5 2
C6L
C6R
2
2LR
C7 2
C8 2
C9 4
C10 2
S6L
S6R
2
2
LR
J1 11
J2 1
1
J3
1
J5
NO. Qty.
F1 32
F2 6
F3 8
F4 161
F5 8
F6 160
F7 n
F8 n
F9 n
L1 1
L2 2
L3 2
ZT-C16 2
-7-
ZA720 PARTS LIST (4-3)
NO. Qty. NO. Qty.
Left and right walls and top
ZA-B3 43596
3540
ZA-A4
ZA-A5
2
2
3540
WA1A 2
2
WA3A
WA1B
3613
2
WA3B 2
WA1C 3613
4
WA4 21612
3613
TA5 2
A10
A11
4
4
TC1 92471
1552
3020
CT2
CT1
1
11612
750
640
A12 20
CW6 16
CW7 8
A7A
18
A6A
18 2785
1500
A6B 1500
A7B 2790
18
18
18
A4C
A7AC
A7AD
6
12
1500
2790
2080
W4
W5
260
2100
16
8
G1
G2
4
4
1300
200
NO. Qty. NO. Qty.
W1 16 694
692
700W2
W3 8
16
B7 4
B8 4
C2 2
CW8 8
C1 20
J1 40
J2 1
J4 1
SW1 8
SW2 24
SW3 24
SW4 48
G3 12
G4 4
G5 4
F4 455
136
16
16
F6
F10
F11
F12
F13
F9 n
48
8
730
730
Left and right walls and top
SUMMARY STATEMENT
FOR POLYCARBONATE PANEL
-8-
ZA720 PARTS LIST (4-4)
P1 P1
P1 P1
P2
P2
P2
P2
P2
P2
P2
P2
P3L P3R
P3LP3R P4L
P4R
P4L P4R
P5R P5L
P5
P6
P6L P6R
C10 C10
P7
P7
P7
P7
P7
P7
P7
P7
P7
P7
P7
P7
P7
P7
P7
P7
P7
P7
P7
P7
P8
P8
P8
P8
P8
P8
P8
P8
P8
P8
P8
P8
P9
P9
P9
P9
P9
P9
P9
P9
Towards the white film side to the sun as it is UV-protected.
"hexagonal screw" installation
Place the "hexagonal screw"into the groove,turn clockwise
until it stops turning.
Adjust the "hexagonal screw"by hand and twist so threads
fix it in place.
Place other parts on "hexagonal screw"and assemble nut .
-9-
UV
!
Advice:According to the thickness and quantity of polycarbonate, please buy suitable polycarboante sealing tape.
sealing tape It can effectively avoid insects, dust, water vapor into the sun plate end.
The required length is (L + W) x8.
-10-
Back wall
A10 A10
C4 C4
ZA-A5 ZA-A5
C5
B7
B7
139cm
139cm
a.
a.
a.
b.
b.b.
b.
C2
ZA-B1 ZA-B1
ZA-A1 ZA-A3
LC1
LC2
LC1
A4 A4
C3
C3
C3
C3
A6L A6R
A7L A7R
A8L A8R
F4 x68
Ⅰ
-11-
ZA-B1
x2 B7 x2
B7 B7
ZA-B1
ZA-B1
Ⅰ
Ⅰ
B7
B7
ZA-B1 ZA-B1
x8
Ⅱ
Ⅱ
F4
F4
F4
F4
F4
F4
ⅡⅡⅡⅡⅡⅡⅡ
ZA-B1
F4
F4 x14
ZA-A1
ZA-A3
C2
ZA-A1
-12-
F4 x12
ⅠⅡⅢ
ZA-A1
ZA-A3
ZA-B1
ZA-B1
ⅠC2
Ⅱ
ⅡⅡ
Ⅲ
Ⅲ
Ⅳ
Ⅳ
Ⅳ
C2
F4 F4 F4
ZA-A3
F4
x3
F4 F4
F4 F4
ZA-A1 ZA-A3
F4
F4
Ⅴ
Ⅴ
Ⅴ
ZA-B1
ZA-A3 ZA-B1
ZA-A3
ZA-A1
F4
F4
-13-
A6L
A6R
A7L
A7R
A8L
A8R
A4 x2
A6L
A6R
A7L
A7R
A8L
A8R
Up
Down
LR
ⅡⅡ
Ⅱ
Ⅲ
ⅡⅡ
Ⅰ
Ⅰ
A4
A4
F4
<ZA-A1>
<ZA-A3 >
A4
A4
ⅠⅡ
F4
F4
Ⅲ
F4
F4
A8L
-14-
LC1 x2
A10 x2 C4 x2
F4 x16
139cm
139cm
Ⅰ
Ⅰ
ⅠⅠ
ⅠⅠ
x6
Ⅱ
ⅡLC1
LC1
A10
A10
C4
C4 A4
A4
Ⅲ
Ⅲ
A10 A6L
F4 F4
F4 x6
A4 A4
ⅡⅢⅣ
C4
A4
A10
F4
!
a.
223mm±1 223mm±1
!a.
b.-b.
A4
C4
Ⅰ
F4
Ⅳ
Ⅳ
b.-b.
!
Ⅴ
Ⅴ
Ⅴ
LC1
LC1
A4 x9
A4
A4
A4
LC1
c.
c.
c.
LC2
-15-
ZA-A5 x2
Ⅰ
Ⅰ
Ⅱ
Ⅱ
ⅢⅢ
Ⅳ
ZA-A5
ZA-A5
LC2
x2
Ⅰ
F4 F4 x3
F4 x2
Ⅱx2 Ⅲx2
F4 x26
Ⅴ
Ⅳ
ZA-A5
ZA-A5
F4 x7
F4 x7
Ⅴ
a.
a.
188mm±1 188mm±1
ZA-A5
C4
C4
C4
C4
F4
F4
F4
F4
Ⅵ
ⅥⅤ
ZA-A5
Ⅵ
LC2
A7L
ZA-A5
F4
!
F4
F4 x4
F4 x2
-16-
C3 x4 C5
C5
C3
C3
C3
C3
ZA-A5
ZA-A5
Ⅰ
ⅡⅡ
Ⅰ
C5 a.
a.
b.
b.
46mm
F4
F4
Ⅱ
Ⅱ
ZA-A5 ZA-A5
C3 C3
F4 F4
Ⅱx2
ZA-A5 ZA-A5
-17-
Front wall
F4 x81
LC3
LC3
A6L A6R C4
C4
A10 A10
A4 A4
ZA-A5 ZA-A5
C3
C3
C3
C3
LC2
A9L A9R
A7L A7R
ZA-D9
ZA-D8
ZA-C11
B7
B7
D7L D7R
ZA-A2 ZA-A2
ZA-B2
ZA-B2
D5
D5
D5
D5
D5
D5
D5
D5
D5
D5
D5
D5
B8
B8
C5
a.
a.
a.
a.
b.
b.
c.
c.
Ⅱ
-18-
ZA-B2
x2 B7 x2 B8 x2 F4 x12
Ⅱ
Ⅱ
Ⅰ
B8
B8
B7
B7
ZA-B2
ZA-B2
Ⅰ
ZA-B2 B7
B8
ZA-B2
B8
B7 ZA-B2 ZA-B2
B8 B8
B7 B7
F4
F4
F4 F4
F4
F4 F4
F4
F4
ZA-B2
x4
Ⅱ
Ⅰ
Ⅰ
Ⅰ
a.-a.
a.-a.
F4
F4
B7 B8
-19-
D7L
D7R
D5 x12 F4 x12
Ⅰ
x12
F4
D5
Ⅱ
D5 D5
F4 F4
D7L D7R
F4x6
D5x6
D7R
D7L
ZA-B2 ZA-B2
B8 B8
F4 x2
D5x6
F4 x2
F4x6
Ⅲ
D7L D7R
B8 B8
ZA-B2 ZA-B2
F4
F4
F4
F4
D5
D5
D5
D5
D5
D5
D7R
B8
ZA-B2
Ⅰ
D5
D5
D5
D5
D5
D5
D7L
B8
ZA-B2
Ⅰ
D7L
B7
F4 F4
B8
Ⅲ
Ⅲ
Ⅲ
Ⅲ
Ⅲ
Ⅲ
ZA-A2
x2
A7L
A7R
Up
Down
LR
ZA-A2
F4 x6
-20-
A7L
A7R
D7L
D7R
ZA-B2
ZA-A2
ZA-B2
Ⅰ
Ⅰ
Ⅱ
Ⅱ
Ⅲ
Ⅲ
Ⅲ
Ⅲ
Ⅳ
Ⅳ
Ⅳ
Ⅳ
65mm
65mm
65mm
196mm
565mm
565mm

Popular Greenhouse Kit manuals by other brands

Halls Greenhouses Garden Room manual

Halls Greenhouses

Halls Greenhouses Garden Room manual

Sontax 73530 quick start guide

Sontax

Sontax 73530 quick start guide

Alton Evolution Octagonal 9x9 instruction manual

Alton

Alton Evolution Octagonal 9x9 instruction manual

Blumfeldt 10030109 Assembly instructions

Blumfeldt

Blumfeldt 10030109 Assembly instructions

oGrow OGAL-46A Assembly instructions

oGrow

oGrow OGAL-46A Assembly instructions

Richel J30604 Assembly instructions and user guide

Richel

Richel J30604 Assembly instructions and user guide

habitat et jardin Lilas 938 52412 Assembly instruction

habitat et jardin

habitat et jardin Lilas 938 52412 Assembly instruction

Serranova 35 manual

Serranova

Serranova 35 manual

VOLYA FERMER-5 Assembly manual

VOLYA

VOLYA FERMER-5 Assembly manual

PNI SP6000 user manual

PNI

PNI SP6000 user manual

Riverstone Networks Monticello 160701V Assembly instructions

Riverstone Networks

Riverstone Networks Monticello 160701V Assembly instructions

Robinsons Extensions 6ft Assembly instructions

Robinsons

Robinsons Extensions 6ft Assembly instructions

OPCOM Farm GrowBox user manual

OPCOM Farm

OPCOM Farm GrowBox user manual

Dancover GH21100 manual

Dancover

Dancover GH21100 manual

AeroGarden AeroGarden 3 instruction manual

AeroGarden

AeroGarden AeroGarden 3 instruction manual

HOKLARTHERM Riga III Series Assembly instructions

HOKLARTHERM

HOKLARTHERM Riga III Series Assembly instructions

KGT Rhodo III Assembly instructions

KGT

KGT Rhodo III Assembly instructions

360 Hunting Blinds SHANTY HUNTER Assembly manual

360 Hunting Blinds

360 Hunting Blinds SHANTY HUNTER Assembly manual

manuals.online logo
manuals.online logoBrands
  • About & Mission
  • Contact us
  • Privacy Policy
  • Terms and Conditions

Copyright 2025 Manuals.Online. All Rights Reserved.