
Technical Characteristics
Excellence Installation Guide
Mod.277_EXC_EN Edição: 08-03-18 Página 2 de 4
•Drill;
•Meter;
•Pencils for marking
•Ruler;
•Level;
To achieve an efficient adhesion, it is essential to ensure the elimination of dust and grease through a good
cleaning on the application surface. After surface cleaning, the bonding shall be carried out by applying double-
sided adhesives.
The installation method depends on the type of sign being fitted. Shown below are the four types of fixing:
2.1 Wall mounted installation
The wall mounted fixing can be carried out by drilling or adhesive fixing.
▪Mark the location of the signs on the
installation surface
▪Remove the protection from the
adhesives applied to the accessories
▪Apply the sign on the installation
surface previously marked
Note: Before installation, it must be
checked whether the usage of adhesive as
installation solution is suitable for the
surface type.
▪Mark the location of signs on the
installation surface using the drilling
guide
▪Do the necessary drilling on the
surface previously marked
▪Remove the protective film from the
back of signs before the installation
▪Apply the signs on the surface
according to the installation sequence
indicated a) b) c) d) e)
a) Remove protection from the
adhesives
b) Application of accessory 1
c) Application of accessory 2
a) Application of accessory 1
b) Application of accessory 3
c) Application of screw 4
d) Application of sign
e) Application of accessory 2