CETUS INSTALLATION
-3-
The Cetus needs to be installed on a solid level base so that it doesnt deect
under its own weight. It is recommended to use a 100mm thick concrete plinth,
although decking or paving slabs
can be used.
During installation a spirit level
should be used across the metal
plate on the weir to make sure the
Cetus is level as shown in Figure 3.
This will ensure that the water ows
evenly across the screen.
Pipe Sizes
Pipe diameter determines the pressure loss within the pipe, so for ows where
gravity is the driving force, large bore pipe (4” / 110mm) needs to be used.
Therefore in a gravity fed system, the inlet (the line from the bottom drain or
skimmer) needs to be 4” (110mm) and also in a pump fed system the return line
from the Cetus to your pond or lter needs to be 4” (110mm). When ows are
under 10,000 L/hr it is possible to use 3” (90mm) pipe instead.
Circulating Pump Installation
Fig 3
When installing your pump on a gravity fed system, the pump must be installed
lower than the level of the outlet to prevent airlocks within the pump.
Also if there is any chance of back siphoning, a one way valve must be
installed after the pump to prevent the Cetus lling with water.
Technical Information
Max Flow 18,000 L/hr
Inlet 4” (110mm) Gravity
1.5” (50mm) Pump
Outlet 1.5” (50 mm) Gravity
3” (90mm) Pump Need 4” adapter when ow over 10,000 L/h
Waste Outlet 3” (90mm)
Height 945 mm
Length 850 mm
Width 570 mm
Screen Size 300 micron