Flue & Ducting GO-FLUE User manual


BS EN 1856-2:2004
BS EN 1856-2:2004
GO-FLUE CHIMNEY LINER
GO-FLUE is suitable for use with oil, atmospheric gas
and kerosene appliances where the flue gas
temperature does not exceed 260°C.
There are several specific elements increasing the value
of the system:
Those adaptors are CE marked with the system –other
adapters are suitable.
MATERIALS:
CONSTRUCTION: single ply
MATERIALS: 316
FUELS:
Go Flue can be used with oil, gas and kerosene and all
kinds of fuels provided the working conditions stated in
the designation numbers are fulfilled and the fuels are
HETAS approved.
DIAMETERS:
STANDARD: 3”, 4”, 5”, 6”, 7”, 8”, 10”, 12”
APPROVALS:
T200 P1 W V2 L50010 O
T400 N1 D V2 L50010 G
APROVED PRODUCTION SITES:
STOCKPORT:
Unit D6, Stockport Trading Estate, Yew Street, Stockport
SK4 2JZ
WELLINGTON:
8E Castle Road, Chelston Business Park, Wellington TA21
9JQ
NORMANTON:
Unit 9 Ripley Close, Normanton Industrial Estate,
Normanton, Yorkshire WF6 1TB
DISTANCES & MEASURES:
INSULATION: Go-Flue should be insulated whenever
possible especially when installing on gable ends and in
flues larger than 9” x 9”.
CHIMNEY: The structure of the chimney must be at least
4” thick (100mm) to comply with current building
regulations.
TIPS & TRICKS:
BEFORE INSTALLATION: Make sure the masonry flue is
swept thoroughly by a competent person to ensure that
all soot and tars have been removed as best as
possible. Soot and tar within the chimney may corrode
the liner.
CHIMNEY: The structure of the chimney must be sound
and must be wind and water tight. It is recommended
to remove any existing pots, dampers or obstructions
before you start to allow full access.
EITHER WAY UP: Due to its unique construction, Dura Flue
can be installed in either direction without risk of

leakage. Dura Flue can also be power swept both
ways.
INSTALLATION: Where any bends occur in the chimney it
would be advisable to remove a small hole in the wall
to ensure the liner has to been installed properly.
We advise that the installation is at least a two man job.
Attach the nose cone and string to what will be the
bottom of the liner.
Installer 1 takes the liner to the top of the chimney and
drops down the string.
Installer 2 collects the string at the bottom ensuring that
the liner does not snag or catch any obstacles on the
way down.
Installer 1 twists the liner down the flue ensuring that it
doesn’t snag or catch any obstacles on the way down
and Installer 2 pulls the string.
NOTE: To ensure the diameter will fit, draw a 1 metre
length of the liner in the diameter you are planning to
use through the chimney first (do not use full lengths or
smaller pieces taped together).
Once the liner is fully down the flue, connect all
required adaptors, clamps and plates using suitable
sealant for wood/multi fuel appliances and self-taping
screws (not supplied in this pack).
Put back on chimney pot and flaunch back as
required.
If the original masonry flue is larger than 9” x 9” or/and is
on an outside wall, Flue and Ducting Ltd highly
recommend the liner is insulated. This decision is to be
made by the HETAS registered installer.

GUARANTEE TERMS AND CONDITIONS:
Flue and Ducting Ltd offer a 10 year warranty on GO-
FLUE chimney liner against the faulty manufacture of
the product or defective fuels/materials used when the
liner has been fitted for its sole purpose as a domestic
liner in use with Flue and Ducting Ltd recommended
fuels only.
The Warranty scheme is subject to the following
conditions:
•Flue and Ducting Ltd Registration card is
completed by the HETAS installer on completion of work
and is sent to Flue and Ducting Ltd within 30 days of job
completion with all accurate information. Flue and
Ducting reference numbers should be referred to in all
future warranty claims.
•Any complaints should first be
attended/investigated by the original HETAS engineer
and if a fault/problem is found the HETAS engineer will
need to report the fault/problem within 14 days to Flue
and Ducting Ltd in writing with the initial registration
card and all relevant information i.e. records of all
proper maintenance of appliance and liner by a
professional chimney sweep as recommended in our
installation guide.
•The Liner has been correctly installed by a
HETAS registered installer and that Document J of the
building regulations and our installation guide has been
followed correctly.
•The Chimney is constructed of the
correct/suitable material and has been thoroughly
cleaned and is free of soot or debris.
•There should be NO combustible materials
within the chimney or present and that a camera
inspection is used for this check.
•The chimney should be sound and water/wind
tight and the liner should be fully insulated/backfilled
with the appropriate material Vermiculite or high
density mineral wool insulation or Rockwool, this will help
to protect the liner from corrosion.
•After installation the chimney liner should be
regularly checked (2-3 times per year) by a qualified
chimney sweep to prevent the build-up of soot deposits
in the chimney ways which can cause chimney fires,
and that the collection of condensation is removed as
this can cause introduction of premature corrosion.
(Please see installation guide)
•The chimney liner must be of one complete
length and not have been damaged, modified or
changed in any way before the installation is carried
out. We also strongly advise you use Flue and Ducting
Ltd fittings as standard, alternative products used will
need to be in the HETAS registered listings.
•The chimney liner must be in accordance with
the appliance and existing masonry flue and
surroundings, this is down to the HETAS engineer’s
discretion. lf uncertain please check with Flue and
Ducting Ltd first or the manufacturer of the appliance.
•The appliance is installed, operated and
maintained in accordance with the appliance
manufacturer's warranty/instructions and complies with
HETAS and Document J of the Building regulations.
•lf any fault/problem should be found to be
external of the chimney liner i.e. appliance, operation,
installation or other the site survey will be chargeable at
Flue and Ducting Ltd’s discretion.
Should Flue and Ducting Ltd find that the chimney liner
supplied is of poor manufacture and does not meet the
standard requirements, Flue and Ducting Ltd will offer a
complete replacement liner free of charge subject to
the terms above.
This warranty only covers the cost of the replacement
liner and does NOT cover the cost of any external
components, fixings, fittings, building work, installation or
any other product other than the liner supplied. All of
which is the responsibility of the customer and this
warranty is agreed when the sale of the liner has taken
place.
Reasonable efforts will always be made by Flue and
Ducting Ltd to resolve the situation but please note that
NO cash or any other payment types will be offered
instead of the replacement liner. The replacement of
the liner is the only product/offer that will be made in a
warranty claim. The purchase of this liner indicates that
you agree to Flue and Ducting Ltd’s warranty policy.
This warranty only applies in the UK, Flue and Ducting
Ltd offer no warranty, further customer service or take
any responsibility for the product when the product
leaves the UK.
This warranty does NOT cover any of our products if
installed with fully condensing boilers, or where harmful/
dangerous gasses/chemical fumes are being used such
as chlorine or halogenic vapours.

IMPORTANT INFORMATON
Most installations of gas and oil appliances and systems are subject to the requirements of Building Regulations and are
notifiable to the Local Authority in your area by law.
HETAS registered installers can self-certificate their work, thus avoiding the need for costly and time consuming Building
Notice applications to the local Building Control Department. HETAS Registered Businesses leave the customer with a
Compliance Certificate and send a copy to HETAS for onward notification to the Local Authority.
This is a simple and effective process costing a few pounds whereas the local authority Building Notice can cost
hundreds of pounds in some cases. The Certificates issued by HETAS and the notifications to Local Authority are
important records demonstrating that work was done legally by registered, competent businesses and individuals and
records that the registered business carried out the work in accordance with Building Regulations.
When people sell their houses, the information about work carried out under the Building Regulations in England & Wales
is used by Solicitors on their inquiry forms and failure to demonstrate compliant work where applicable can adversely
affect the sale of properties.
The information gathered in this way may be used in any future home information pack (HIP) requirement and Local
Authorities are already required by law to hold such information.
Please note, all information given in this technical documentation is a guideline only. The products should only be fitted
by a legally qualified person. Flue and Ducting Ltd cannot take responsibility for any installations.
It is required by law that a carbon monoxide alarm must be fitted with every new solid fuel appliance.

FOR YOUR WARRANTY TO BE ACTIVATED YOU MUST FILL OUT THE WARRANTY FORM WITHIN 30 DAYS OF INSTALLATION.

TERMS OF PAYMENT
Subject to any special terms agreed in writing between the Buyer and Flue and Ducting Limited, Flue and Ducting
Limited shall be entitled to invoice the Buyer for the price of the Goods on or at any time after despatch of the Goods,
unless the Goods are to be collected by the Buyer or the Buyer wrongfully fails to take delivery of the Goods, in which
event, Flue and Ducting Limited shall be entitled to invoice the Buyer for the price at any time after Flue and Ducting
Limited has notified the Buyer that the Goods are ready for collection or (as the case may be) Flue and Ducting Limited
has tendered delivery of the Goods.
The Buyer shall pay the price of the Goods upon despatch of the Goods unless otherwise agreed in writing. Where Flue
and Ducting Limited has agreed to credit terms the Buyer shall pay the price of the Goods (less any discount to which
the Buyer is entitled, but without any other deduction) within 30 days from the date of the invoice, and Flue and Ducting
Limited shall be entitled to recover the price, notwithstanding that delivery may not have taken place and the property
in the Goods has not passed to the Buyer. The time of payment of the price shall be of the essence of the Contract.
Receipts for payment will be issued only upon request.
In respect of any services provided by Flue and Ducting Limited, Flue and Ducting Limited's standard charges and any
additional sums payable shall be paid by the Buyer (together with any applicable Value Added Tax (VAT), and without
any set-off or other deduction) within 30 days from the date on the invoice.
lf the Buyer fails to make any payment by the due date then, without prejudice to any other right or remedy to Flue and
Ducting Limited, Flue and Ducting Limited shall be entitled to:
1. Cancel the Contract, or suspend any further deliveries or service to the Buyer
2. Appropriate any payment made by the Buyer to such of the Goods (or the goods supplied under any other
contract between the Buyer and Flue and Ducting Limited), or service as Flue and Ducting Limited may think fit
(notwithstanding any purported appropriation by the Buyer.
3. Charge the Buyer interest (both before and after any judgement) on the amount unpaid at the rate of 8% per
annum above the National Westminster Bank base rate until payment in full is made (a part of a month being
treated as a full month for the purpose of calculating interest).

Table of contents
Popular Ventilation Hood manuals by other brands

Junker
Junker JD66LF60 User manual and installation instructiions

Air King
Air King AR1303 Specifications

Air King
Air King AB series operating manual

V-ZUG
V-ZUG AiroClearWall V2000 V90 operating instructions

Air King
Air King ALI36SS Use and handling instructions

Lumberjack
Lumberjack BDE1100 Safety and operating manual